diff --git a/WGBH-DCAMM/color-of-money.py b/WGBH-DCAMM/color-of-money.py index d4eea2fb..cd838f2a 100644 --- a/WGBH-DCAMM/color-of-money.py +++ b/WGBH-DCAMM/color-of-money.py @@ -1,11 +1,12 @@ import unittest from sys import argv -from src.parsers.pdf_parser import import_pdf +from src.parsers.pdf_parser import read_csv + def main(arg): debug = False print("================================") - rows = import_pdf("data/WorkforceUtilizationSummaryReportApril2019.pdf", debug) + rows = read_csv("data/WorkforceUtilizationSummaryReportApril2019.pdf", debug) print("================================") diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportApril2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportApril2019.csv new file mode 100644 index 00000000..3178e1f5 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportApril2019.csv @@ -0,0 +1,2611 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,41.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +Rise Engineering,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,8.25,0.00,0.00,8.25,0.00,0.00,0.00,0.00,0.00,8.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.25,0.00,0.00,8.25,0.00,0.00,0.00,0.00,0.00,8.25, +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.25,0.00,0.00,8.25,0.00,0.00,0.00,0.00,0.00,8.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.25,0.00,0.00,8.25,0.00,0.00,0.00,0.00,0.00,8.25, +Total Journey Hours,49.75,41.50,0.00,8.25,0.00,0.00,0.00,0.00,0.00,49.75, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,49.75,41.50,0.00,8.25,0.00,0.00,0.00,0.00,0.00,49.75, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"E. Amanti & Sons, Inc",,,,,,,,,,,, +LABORER,Journey,19.50,19.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,19.50,19.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.50, +PIPEFITTER & STEAMFITTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +PLUMBERS & GASFITTERS,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total for Contractor,Journey,79.50,79.50,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,79.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,79.50,79.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.50, +Harnum Industries LTD,,,,,,,,,,,, +LABORER,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00,, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Total for Contractor,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"S&F Concrete Contractors, Inc.",,,,,,,,,,,, +EQUIPMENT OPERATOR (Class B CDL),Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +LABORER,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +Total for Contractor,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,28.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,396.50,396.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,396.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,396.50,396.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,396.50, +LABORER,Journey,663.50,663.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,663.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,663.50,663.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,663.50, +Total for Contractor,Journey,"1,076.00","1,076.00",0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,0.00,"1,076.00",, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,076.00","1,076.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,076.00", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,96.50,77.50,11.00,8.00,0.00,0.00,0.00,0.00,0.00,96.50, +Apprentice,48.00,8.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00,, +A/J Ratio,0.50,0.10,3.64,0.00,0.00,0.00,0.00,0.00,0.00,0.50,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,144.50,85.50,51.00,8.00,0.00,0.00,0.00,0.00,0.00,144.50,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",96.50,"77.50 11.008.000.000.000.00","0.000.00 96.50",,,,,,,,, +"",,,,,,,,0.00,96.50,,, +Apprentice,48.00,8.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00,, +A/J Ratio,0.50,0.10,3.64,0.00,0.00,0.00,0.00,0.00,0.00,0.50,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,144.50,85.50,51.00,8.00,0.00,0.00,0.00,0.00,0.00,144.50,, +"0.000.00 96.50", +0.00,96.50 +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,291.00","1,272.00",11.00,8.00,0.00,0.00,0.00,0.00,0.00,"1,291.00" +Total Apprentice Hours,48.00,8.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,339.00","1,280.00",51.00,8.00,0.00,0.00,0.00,0.00,0.00,"1,339.00" +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Avid Ironworks, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Champagne Drywall Inc,,,,,,,,,,, +CARPENTER,Journey,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,157.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,157.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,157.00 +Crestview Construction & Trucking Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +DRIVER / GROUNDMAN CDL,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +LABORER,Journey,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",50.00,"50.00 0.000.000.000.000.00","0.000.00 50.00",,,,,,,, +"",,,,,,,,,0.00,50.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00, +"Donnegan Systems, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,88.50,44.00,13.50,31.00,0.00,0.00,0.00,0.00,0.00,88.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.50,44.00,13.50,31.00,0.00,0.00,0.00,0.00,0.00,88.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.50,"44.00 13.5031.000.000.000.00","0.000.00 88.50",,,,,,,, +"",,,,,,,,,,0.00,88.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.50,44.00,13.50,31.00,0.00,0.00,0.00,0.00,0.00,88.50 +"Eastfield Glass Co,. Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,116.00,54.00,10.50,51.50,0.00,0.00,0.00,0.00,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,54.00,10.50,51.50,0.00,0.00,0.00,0.00,0.00,116.00 +Total for Contractor,Journey,116.00,54.00,10.50,51.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,54.00,10.50,51.50,0.00,0.00,0.00,0.00,0.00,116.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Harris Environmental Systems,,,,,,,,,,, +CARPENTER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Total for Contractor,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,7.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"King Painting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"PAINTER / TAPER (BRUSH, NEW)",Journey,15.50,0.00,0.00,15.50,0.00,0.00,0.00,0.00,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,0.00,0.00,15.50,0.00,0.00,0.00,0.00,0.00,15.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",15.50,"0.00 0.0015.500.000.000.00","0.000.00 15.50",,,,,,,, +"",,,,,,,,,,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,0.00,0.00,15.50,0.00,0.00,0.00,0.00,0.00,15.50 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +LABORER,Journey,234.00,234.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,234.00,234.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",474.00,"474.00 0.000.000.000.000.00","0.000.00 474.00",,,,,,,, +"",,,,,,,,,0.00,474.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,474.00,474.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,474.00, +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,4.83,2.03,0.00,0.00,0.00,0.00,0.00,2.80,0.00,4.83 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.83,2.03,0.00,0.00,0.00,0.00,0.00,2.80,0.00,4.83 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.83,"2.03 0.000.000.000.000.00","2.800.00 4.83",,,,,,,, +"",,,,,,,,,,0.00,4.83 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.83,2.03,0.00,0.00,0.00,0.00,0.00,2.80,0.00,4.83 +Pioneer Landscapes,,,,,,,,,,, +LABORER,Journey,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +Total for Contractor,Journey,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,77.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +"Saltbox Millwork , LLC",,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,253.00,111.00,16.00,126.00,0.00,0.00,0.00,0.00,0.00,253.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,253.00,111.00,16.00,126.00,0.00,0.00,0.00,0.00,0.00,253.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",253.00,"111.00 16.00126.000.000.000.00","0.000.00 253.00",,,,,,,, +"",,,,,,,,,0.00,253.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,253.00,111.00,16.00,126.00,0.00,0.00,0.00,0.00,0.00,253.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.50 +"",Apprentice,3.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",A/J Ratio,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,9.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Total for Contractor,Journey,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,9.50,, +Apprentice,3.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,3.50, +A/J Ratio,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,9.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +"Ultimate Construction, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,144.00,0.00,32.00,0.00,0.00,0.00,112.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,0.00,32.00,0.00,0.00,0.00,112.00,0.00,0.00,144.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.00,"0.00 32.000.000.000.00112.00","0.000.00 144.00",,,,,,,, +"",,,,,,,,,,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,0.00,32.00,0.00,0.00,0.00,112.00,0.00,0.00,144.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Whitehawk Construction Services, Inc.",,,,,,,,,,, +CARPENTER,Journey,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00, +Total Journey Hours,"1,790.33","1,222.53",72.00,381.00,0.00,0.00,112.00,2.80,0.00,"1,790.33", +Total Apprentice Hours,3.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,3.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,793.83","1,222.53",75.50,381.00,0.00,0.00,112.00,2.80,0.00,"1,793.83", +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +AAA ROYAL CONSTRUCTION LLC,,,,,,,,,,, +CARPENTER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 0.0016.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/PLASTER/CEMENT MASON,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,16.00 +BRICK/STONE/ARTIFICIAL MASONRY,Journey,68.00,28.00,32.00,8.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.00,28.00,32.00,8.00,0.00,0.00,0.00,0.00,0.00,68.00 +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,72.00,32.00,32.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,16.00 +"",A/J Ratio,0.33,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.22 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,56.00,32.00,8.00,0.00,0.00,0.00,0.00,8.00,88.00 +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,268.50,268.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,268.50,268.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.50 +IRONWORKER/WELDER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,283.00,201.50,0.00,81.50,0.00,0.00,0.00,0.00,0.00,283.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,283.00,201.50,0.00,81.50,0.00,0.00,0.00,0.00,0.00,283.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",556.50,"475.00 0.0081.500.000.000.00","0.000.00 556.50",,,,,,,, +"",,,,,,,,,,0.00,556.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,556.50,475.00,0.00,81.50,0.00,0.00,0.00,0.00,0.00,556.50 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,196.00,0.00,0.00,124.00,0.00,0.00,72.00,0.00,0.00,196.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,196.00,0.00,0.00,124.00,0.00,0.00,72.00,0.00,0.00,196.00 +Total for Contractor,Journey,196.00,0.00,0.00,124.00,0.00,0.00,72.00,0.00,, +"",,,,,,,,,,0.00,196.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,196.00,0.00,0.00,124.00,0.00,0.00,72.00,0.00,0.00,196.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",168.00,"168.00 0.000.000.000.000.00","0.000.00 168.00",,,,,,,, +"",,,,,,,,,0.00,168.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +LABORER,Journey,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",680.00,"680.00 0.000.000.000.000.00","0.000.00 680.00",,,,,,,, +"",,,,,,,,0.00,680.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,680.00,680.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,680.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,876.50","1,559.00",32.00,213.50,0.00,0.00,72.00,0.00,0.00,"1,876.50" +Total Apprentice Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,16.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,900.50","1,583.00",32.00,213.50,0.00,0.00,72.00,0.00,8.00,"1,892.50" +"Project Name: DMH0902 EC1 C Taunton State Hospital Energy Project Project Code: DMH0902 EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",28.00,"28.00 0.000.000.000.000.00","0.000.00 28.00",,,,,,,, +"",,,,,,,,0.00,28.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total Journey Hours,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,376.00,360.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,376.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,376.00,360.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,376.00 +Total for Contractor,Journey,376.00,360.00,16.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,376.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,376.00,360.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,376.00, +Total Journey Hours,424.00,408.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,424.00,408.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ACV Concrete LLC,,,,,,,,,,, +CARPENTER,Journey,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +IRONWORKER/WELDER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,102.00,0.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,102.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,0.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,102.00 +LABORER: CARPENTER TENDER,Journey,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +LABORER: CEMENT FINISHER TENDER,Journey,62.00,0.00,0.00,62.00,0.00,0.00,0.00,0.00,0.00,62.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,62.00,0.00,0.00,62.00,0.00,0.00,0.00,0.00,0.00,62.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,224.00,0.00,0.00,224.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,0.00,0.00,224.00,0.00,0.00,0.00,0.00,0.00,224.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,250.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,250.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",250.00,"250.00 0.000.000.000.000.00","0.000.00 250.00",,,,,,,, +"",,,,,,,,,0.00,250.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,250.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.80,0.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +Total for Contractor,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,200.00,, +Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +A/J Ratio,0.80,0.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00, +Debrino Caulking Associates Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +BRICK/STONE/ARTIFICIAL MASONRY,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"16.00 0.0016.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,494.00,441.50,0.00,52.50,0.00,0.00,0.00,0.00,0.00,494.00 +"",Apprentice,123.00,0.00,70.50,52.50,0.00,0.00,0.00,0.00,0.00,123.00 +"",A/J Ratio,0.25,0.00,0.00,1.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,617.00,441.50,70.50,105.00,0.00,0.00,0.00,0.00,0.00,617.00 +SHEETMETAL WORKER,Journey,22.00,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Apprentice,11.00,0.00,0.00,0.00,11.00,0.00,0.00,0.00,0.00,11.00, +A/J Ratio,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.00,11.00,11.00,0.00,11.00,0.00,0.00,0.00,0.00,33.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",516.00,"452.50 11.0052.500.000.000.00","0.000.00 516.00",,,,,,,, +"",,,,,,,,,0.00,516.00, +Apprentice,134.00,0.00,70.50,52.50,11.00,0.00,0.00,0.00,0.00,134.00, +A/J Ratio,0.26,0.00,6.41,1.00,0.00,0.00,0.00,0.00,0.00,0.26, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,650.00,452.50,81.50,105.00,11.00,0.00,0.00,0.00,0.00,650.00, +Nashoba Paving,,,,,,,,,,, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,158.50,158.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,158.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,158.50,158.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,158.50 +DRIVER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +Total for Contractor,Journey,311.50,311.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,311.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,311.50,311.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,311.50 +"William F. Lynch Co., Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00, +Total Journey Hours,"1,564.50","1,261.00",11.00,292.50,0.00,0.00,0.00,0.00,0.00,"1,564.50", +Total Apprentice Hours,294.00,160.00,70.50,52.50,11.00,0.00,0.00,0.00,0.00,294.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,858.50","1,421.00",81.50,345.00,11.00,0.00,0.00,0.00,0.00,"1,858.50", +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",0.00,"0.00 0.000.000.000.000.00","0.000.00 0.00",,,,,,,, +"",,,,,,,,,,0.00,0.00 +"",Apprentice,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +Total for Contractor,Journey,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,17.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00, +Total Journey Hours,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00, +Total Apprentice Hours,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,21.00,17.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +LABORER,Journey,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +Total for Contractor,Journey,236.00,236.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,236.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,236.00,236.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,236.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,0.00,6.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,242.00,242.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,242.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,242.00,242.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,242.00 +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Dagle Electrical Construction Corp.,,,,,,,,,,, +ELECTRICIAN,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Professional Fire Systems, Inc.",,,,,,,,,,, +"FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY",Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,4.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50 +PIPEFITTER & STEAMFITTER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +PLUMBERS & GASFITTERS,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +SHEETMETAL WORKER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",232.50,"232.50 0.000.000.000.000.00","0.000.00 232.50",,,,,,,, +"",,,,,,,,,0.00,232.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,232.50,232.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,232.50, +Archer Corp,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,640.00,640.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,640.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,640.00,640.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,640.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",640.00,"640.00 0.000.000.000.000.00","0.000.00 640.00",,,,,,,, +"",,,,,,,,,,0.00,640.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,640.00,640.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,640.00 +Authorized Services of New England,,,,,,,,,,, +GENERATOR/LIGHTING PLANT/HEATERS,Journey,10.75,10.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.75,10.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.75 +Total for Contractor,Journey,10.75,10.75,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,10.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.75,10.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.75 +Ayotte and King for Tile Inc.,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +"Bay State Building Specialties, INC",,,,,,,,,,, +CARPENTER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Total for Contractor,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,160.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,496.00,496.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,496.00 +"",Apprentice,91.00,0.00,0.00,91.00,0.00,0.00,0.00,0.00,0.00,91.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.18 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,587.00,496.00,0.00,91.00,0.00,0.00,0.00,0.00,0.00,587.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",496.00,"496.00 0.000.000.000.000.00","0.000.00 496.00",,,,,,,, +"",,,,,,,,,,0.00,496.00 +"",Apprentice,91.00,0.00,0.00,91.00,0.00,0.00,0.00,0.00,0.00,91.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.18 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,587.00,496.00,0.00,91.00,0.00,0.00,0.00,0.00,0.00,587.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,201.50,137.50,0.00,0.00,0.00,0.00,64.00,0.00,0.00,201.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,201.50,137.50,0.00,0.00,0.00,0.00,64.00,0.00,0.00,201.50 +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,307.50,307.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,307.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,307.50,307.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,307.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,509.00,445.00,0.00,0.00,0.00,0.00,64.00,0.00,0.00,509.00 +"",Apprentice,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"",A/J Ratio,0.08,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,548.50,484.50,0.00,0.00,0.00,0.00,64.00,0.00,0.00,548.50 +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",A/J Ratio,0.71,0.71,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.71 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.00,"112.00 0.000.000.000.000.00","0.000.00 112.00",,,,,,,, +"",,,,,,,,,0.00,112.00, +"",Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",A/J Ratio,0.71,0.71,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.71 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +MTJ Landscapes,,,,,,,,,,, +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +Performance Testing and Balancing,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +HVAC (TESTING AND BALANCING - AIR),Journey,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",101.00,"101.00 0.000.000.000.000.00","0.000.00 101.00",,,,,,,, +"",,,,,,,,,,0.00,101.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +Simplex Grinnell LP,,,,,,,,,,, +ELECTRICIAN,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Total for Contractor,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,298.00,274.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,298.00,274.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,298.00,274.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,298.00,274.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,97.00,30.50,33.00,33.50,0.00,0.00,0.00,0.00,0.00,97.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,97.00,30.50,33.00,33.50,0.00,0.00,0.00,0.00,0.00,97.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",97.00,"30.50 33.0033.500.000.000.00","0.000.00 97.00",,,,,,,, +"",,,,,,,,,0.00,97.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,97.00,30.50,33.00,33.50,0.00,0.00,0.00,0.00,0.00,97.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +"",Apprentice,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",A/J Ratio,0.41,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +Total for Contractor,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,27.00,, +Apprentice,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +A/J Ratio,0.41,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +T & M Equipment Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,161.00,81.00,0.00,0.00,80.00,0.00,0.00,0.00,0.00,161.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,81.00,0.00,0.00,80.00,0.00,0.00,0.00,0.00,161.00 +LABORER,Journey,248.00,208.00,0.00,40.00,0.00,0.00,0.00,0.00,24.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,208.00,0.00,40.00,0.00,0.00,0.00,0.00,24.00,224.00 +Total for Contractor,Journey,409.00,289.00,0.00,40.00,80.00,0.00,0.00,0.00,, +"",,,,,,,,,24.00,385.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,409.00,289.00,0.00,40.00,80.00,0.00,0.00,0.00,24.00,385.00 +"Titan Roofing, Inc.",,,,,,,,,,, +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,86.75,86.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.75,86.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.75 +ROOFER,Journey,377.50,377.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,377.50 +"",Apprentice,355.00,118.50,10.00,201.00,0.00,0.00,25.50,0.00,0.00,355.00 +"",A/J Ratio,0.94,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.94 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,732.50,496.00,10.00,201.00,0.00,0.00,25.50,0.00,0.00,732.50 +"ROOFER SLATE / TILE / PRECAST CONCRETE",Journey,167.00,141.50,0.00,25.50,0.00,0.00,0.00,0.00,0.00,167.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,167.00,141.50,0.00,25.50,0.00,0.00,0.00,0.00,0.00,167.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,263.50,263.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,263.50 +"",Apprentice,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",A/J Ratio,0.60,0.60,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.60 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,420.50,420.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,420.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",894.75,"869.25 0.0025.500.000.000.00","0.000.00 894.75",,,,,,,, +"",,,,,,,,,0.00,894.75, +"",Apprentice,512.00,275.50,10.00,201.00,0.00,0.00,25.50,0.00,0.00,512.00 +"",A/J Ratio,0.57,0.32,0.00,7.88,0.00,0.00,0.00,0.00,0.00,0.57 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,406.75","1,144.75",10.00,226.50,0.00,0.00,25.50,0.00,0.00,"1,406.75" +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,272.00,272.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,272.00 +"",Apprentice,159.50,0.00,159.50,0.00,0.00,0.00,0.00,0.00,0.00,159.50 +"",A/J Ratio,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,431.50,272.00,159.50,0.00,0.00,0.00,0.00,0.00,0.00,431.50 +TELECOMMUNICATION TECHNICIAN,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",312.00,"312.00 0.000.000.000.000.00","0.000.00 312.00",,,,,,,, +"",,,,,,,,0.00,312.00,, +Apprentice,167.50,8.00,159.50,0.00,0.00,0.00,0.00,0.00,0.00,167.50, +A/J Ratio,0.54,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,479.50,320.00,159.50,0.00,0.00,0.00,0.00,0.00,0.00,479.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"4,387.50","4,079.50",57.00,107.00,80.00,0.00,64.00,0.00,24.00,"4,363.50" +Total Apprentice Hours,901.00,414.00,169.50,292.00,0.00,0.00,25.50,0.00,0.00,901.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"5,288.50","4,493.50",226.50,399.00,80.00,0.00,89.50,0.00,24.00,"5,264.50" +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,146.00,92.00,0.00,30.00,24.00,0.00,0.00,0.00,0.00,146.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,92.00,0.00,30.00,24.00,0.00,0.00,0.00,0.00,146.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",146.00,"92.00 0.0030.0024.000.000.00","0.000.00 146.00",,,,,,,, +"",,,,,,,,0.00,146.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,92.00,0.00,30.00,24.00,0.00,0.00,0.00,0.00,146.00, +Total Journey Hours,146.00,92.00,0.00,30.00,24.00,0.00,0.00,0.00,0.00,146.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,146.00,92.00,0.00,30.00,24.00,0.00,0.00,0.00,0.00,146.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Mill City Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,31.25,31.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.25,31.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.25 +Total for Contractor,Journey,31.25,31.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,31.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,31.25,31.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.25, +Total Journey Hours,41.25,41.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.25, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,41.25,41.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDN1501E EC1 C Comprehensive Energy and Water Upgrades Project Code: SDN1501E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +ELECTRICIAN,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",13.00,"13.00 0.000.000.000.000.00","0.000.00 13.00",,,,,,,, +"",,,,,,,,0.00,13.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +Total Journey Hours,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50 +"",Apprentice,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.50,27.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.50,"16.50 0.000.000.000.000.00","0.000.00 16.50",,,,,,,, +"",,,,,,,,,,0.00,16.50 +"",Apprentice,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.50,27.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.50 +Complete Labor and Staffing LLC,,,,,,,,,,, +LABORER,Journey,11.00,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,11.00 +Total for Contractor,Journey,11.00,5.50,0.00,5.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,11.00 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,245.34,0.00,0.00,0.00,0.00,0.00,245.34,0.00,0.00,245.34 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,245.34,0.00,0.00,0.00,0.00,0.00,245.34,0.00,0.00,245.34, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,227.59,0.00,0.00,0.00,0.00,0.00,227.59,0.00,0.00,227.59 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,227.59,0.00,0.00,0.00,0.00,0.00,227.59,0.00,0.00,227.59 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",472.93,"0.00 0.000.000.000.00472.93","0.000.00 472.93",,,,,,,, +"",,,,,,,,,,0.00,472.93 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,472.93,0.00,0.00,0.00,0.00,0.00,472.93,0.00,0.00,472.93 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",Apprentice,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",A/J Ratio,0.51,0.51,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.51 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +Total for Contractor,Journey,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,133.00 +"",Apprentice,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",A/J Ratio,0.51,0.51,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.51 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,69.50,69.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,69.50,69.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",245.50,"245.50 0.000.000.000.000.00","0.000.00 245.50",,,,,,,, +"",,,,,,,,,,0.00,245.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,245.50,245.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,245.50 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,98.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,98.00 +LABORER: CARPENTER TENDER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",170.00,"170.00 0.000.000.000.000.00","0.000.00 170.00",,,,,,,, +"",,,,,,,,,0.00,170.00, +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,186.00,186.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.00, +TradeSource,,,,,,,,,,, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,5.25,5.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.25,5.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.25,"5.25 0.000.000.000.000.00","0.000.00 5.25",,,,,,,, +"",,,,,,,,,0.00,5.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.25,5.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.25, +Total Journey Hours,"1,054.18",575.75,0.00,5.50,0.00,0.00,472.93,0.00,0.00,"1,054.18", +Total Apprentice Hours,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,149.18",670.75,0.00,5.50,0.00,0.00,472.93,0.00,0.00,"1,149.18", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Total for Contractor,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,529.50,529.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,529.50 +Apprentice,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00, +A/J Ratio,0.28,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,678.50,678.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,678.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",533.50,"533.50 0.000.000.000.000.00","0.000.00 533.50",,,,,,,, +"",,,,,,,,,,0.00,533.50 +"",Apprentice,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +"",A/J Ratio,0.28,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,682.50,682.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,682.50 +Baron Industries,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,512.00,504.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,512.00 +Apprentice,520.00,112.00,166.00,242.00,0.00,0.00,0.00,0.00,122.00,398.00, +A/J Ratio,1.02,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.78, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,032.00",616.00,166.00,242.00,0.00,0.00,8.00,0.00,122.00,910.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,512.00,504.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,512.00 +"",Apprentice,520.00,112.00,166.00,242.00,0.00,0.00,0.00,0.00,122.00,398.00 +"",A/J Ratio,1.02,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.78 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,032.00",616.00,166.00,242.00,0.00,0.00,8.00,0.00,122.00,910.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +IRONWORKER/WELDER,Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +Total for Contractor,Journey,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,312.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"3,106.50","2,579.00",0.00,527.50,0.00,0.00,0.00,0.00,0.00,"3,106.50" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"3,106.50","2,579.00",0.00,527.50,0.00,0.00,0.00,0.00,0.00,"3,106.50", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,"1,148.50","1,148.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,148.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,148.50","1,148.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,148.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","4,255.00","3,727.50 0.00527.500.000.000.00","0.000.00 4,255.00",,,,,,,, +"",,,,,,,,,,0.00,"4,255.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"4,255.00","3,727.50",0.00,527.50,0.00,0.00,0.00,0.00,0.00,"4,255.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER,Journey,89.00,89.00,0.00,0.00,0.00,0.00,0.00,0.00,89.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.00,89.00,0.00,0.00,0.00,0.00,0.00,0.00,89.00,0.00 +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,144.00,20.00,0.00,124.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,20.00,0.00,124.00,0.00,0.00,0.00,0.00,0.00,144.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,246.00,139.00,0.00,107.00,0.00,0.00,0.00,0.00,0.00,246.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,246.00,139.00,0.00,107.00,0.00,0.00,0.00,0.00,0.00,246.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,479.00,248.00,0.00,231.00,0.00,0.00,0.00,0.00,89.00,390.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,479.00,248.00,0.00,231.00,0.00,0.00,0.00,0.00,89.00,390.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,149.50,149.50,0.00,0.00,0.00,0.00,0.00,0.00,45.00,104.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,149.50,149.50,0.00,0.00,0.00,0.00,0.00,0.00,45.00,104.50 +Total for Contractor,Journey,310.00,310.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,45.00,265.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,310.00,310.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00,265.00 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,720.00,720.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,720.00 +"",Apprentice,176.00,0.00,0.00,176.00,0.00,0.00,0.00,0.00,176.00,0.00 +"",A/J Ratio,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,896.00,720.00,0.00,176.00,0.00,0.00,0.00,0.00,176.00,720.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",856.00,"856.00 0.000.000.000.000.00","0.000.00 856.00",,,,,,,, +"",,,,,,,,,,0.00,856.00 +"",Apprentice,176.00,0.00,0.00,176.00,0.00,0.00,0.00,0.00,176.00,0.00 +"",A/J Ratio,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,032.00",856.00,0.00,176.00,0.00,0.00,0.00,0.00,176.00,856.00 +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +LABORER,Journey,282.50,282.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,282.50,282.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",443.50,"443.50 0.000.000.000.000.00","0.000.00 443.50",,,,,,,, +"",,,,,,,,,0.00,443.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,443.50,443.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,443.50, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PLUMBERS & GASFITTERS,Journey,716.00,620.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,716.00 +"",Apprentice,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",A/J Ratio,0.21,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,866.00,770.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,866.00 +Total for Contractor,Journey,732.00,636.00,96.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,732.00 +"",Apprentice,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",A/J Ratio,0.20,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,882.00,786.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,882.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,470.00,430.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,470.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,470.00,430.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,470.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",470.00,"430.00 0.000.0040.000.000.00","0.000.00 470.00",,,,,,,, +"",,,,,,,,,0.00,470.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,470.00,430.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,470.00, +Empire Masonry Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,460.00,460.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,460.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.00,460.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,460.00 +LABORER: MASON TENDER,Journey,226.00,226.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,226.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,226.00,226.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,226.00 +Total for Contractor,Journey,686.00,686.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,686.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,686.00,686.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,686.00 +"Federal Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,156.00,156.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,156.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,156.00,156.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,156.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,81.50,57.50,16.00,8.00,0.00,0.00,0.00,0.00,0.00,81.50 +"",Apprentice,38.50,28.50,10.00,0.00,0.00,0.00,0.00,0.00,8.00,30.50 +"",A/J Ratio,0.47,0.50,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,86.00,26.00,8.00,0.00,0.00,0.00,0.00,8.00,112.00 +SHEETMETAL WORKER,Journey,110.50,56.50,54.00,0.00,0.00,0.00,0.00,0.00,0.00,110.50 +"",Apprentice,70.00,0.00,0.00,0.00,70.00,0.00,0.00,0.00,0.00,70.00 +"",A/J Ratio,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,180.50,56.50,54.00,0.00,70.00,0.00,0.00,0.00,0.00,180.50 +Total for Contractor,Journey,192.00,114.00,70.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,192.00 +"",Apprentice,108.50,28.50,10.00,0.00,70.00,0.00,0.00,0.00,8.00,100.50 +"",A/J Ratio,0.57,0.25,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.52 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,300.50,142.50,80.00,8.00,70.00,0.00,0.00,0.00,8.00,292.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,946.50,692.00,168.00,86.50,0.00,0.00,0.00,0.00,0.00,946.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,946.50,692.00,168.00,86.50,0.00,0.00,0.00,0.00,0.00,946.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,946.50,692.00,168.00,86.50,0.00,0.00,0.00,0.00,0.00,946.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,946.50,692.00,168.00,86.50,0.00,0.00,0.00,0.00,0.00,946.50 +"H Carr & Sons, Inc",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,203.00,203.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,203.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,203.00,203.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,203.00 +LABORER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,299.00,299.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,299.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,299.00,299.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,299.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +SPRINKLER FITTER,Journey,248.00,169.00,0.00,0.00,0.00,0.00,79.00,0.00,0.00,248.00 +"",Apprentice,229.50,229.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,229.50 +"",A/J Ratio,0.93,1.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.93 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,477.50,398.50,0.00,0.00,0.00,0.00,79.00,0.00,0.00,477.50 +Total for Contractor,Journey,418.00,339.00,0.00,0.00,0.00,0.00,79.00,0.00,, +"",,,,,,,,,,0.00,418.00 +"",Apprentice,229.50,229.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,229.50 +"",A/J Ratio,0.55,0.68,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.55 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,647.50,568.50,0.00,0.00,0.00,0.00,79.00,0.00,0.00,647.50 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,,0.00,10.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",96.00,"96.00 0.000.000.000.000.00","0.000.00 96.00",,,,,,,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,40.00,0.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00,0.00 +"",A/J Ratio,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,96.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00,96.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,40.00,0.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00,0.00 +"",A/J Ratio,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,96.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00,96.00 +"Lymo Construction Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +Apprentice,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00, +A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +"",Apprentice,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +LABORER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +PUMP OPERATOR (CONCRETE),Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",87.00,"87.00 0.000.000.000.000.00","0.000.00 87.00",,,,,,,, +"",,,,,,,,,0.00,87.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00, +New England Deck & Floors Incorporated,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: CEMENT FINISHER TENDER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,160.00,88.00,0.00,72.00,0.00,0.00,0.00,0.00,40.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,88.00,0.00,72.00,0.00,0.00,0.00,0.00,40.00,120.00 +Total for Contractor,Journey,256.00,184.00,0.00,72.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,40.00,216.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,184.00,0.00,72.00,0.00,0.00,0.00,0.00,40.00,216.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,0.00,6.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +Patrick J. Kennedy & Sons,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,248.00,96.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,248.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,96.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,248.00 +PIPEFITTER & STEAMFITTER,Journey,744.00,744.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,744.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,744.00,744.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,744.00 +Total for Contractor,Journey,744.00,744.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,744.00 +"",Apprentice,248.00,96.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,248.00 +"",A/J Ratio,0.33,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,992.00,840.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,992.00 +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Safway Services LLC, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELEVATOR CONSTRUCTOR,Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +MECHANICS MAINTENANCE,Journey,408.00,408.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,408.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,408.00,408.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,408.00 +Total for Contractor,Journey,418.50,418.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,418.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,418.50,418.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,418.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,344.00,336.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,344.00 +Apprentice,176.00,0.00,72.00,104.00,0.00,0.00,0.00,0.00,0.00,176.00, +A/J Ratio,0.51,0.00,0.00,13.00,0.00,0.00,0.00,0.00,0.00,0.51, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,520.00,336.00,72.00,112.00,0.00,0.00,0.00,0.00,0.00,520.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",344.00,"336.00 0.008.000.000.000.00","0.000.00 344.00",,,,,,,, +"",,,,,,,,,0.00,344.00, +Apprentice,176.00,0.00,72.00,104.00,0.00,0.00,0.00,0.00,0.00,176.00, +A/J Ratio,0.51,0.00,0.00,13.00,0.00,0.00,0.00,0.00,0.00,0.51, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,520.00,336.00,72.00,112.00,0.00,0.00,0.00,0.00,0.00,520.00, +V&G Iron Works Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +LABORER,Journey,26.50,20.50,6.00,0.00,0.00,0.00,0.00,0.00,7.00,19.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.50,20.50,6.00,0.00,0.00,0.00,0.00,0.00,7.00,19.50 +Total for Contractor,Journey,40.00,34.00,6.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,7.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,34.00,6.00,0.00,0.00,0.00,0.00,0.00,7.00,33.00 +ver-tex construction specialties,,,,,,,,,,, +JOURNEYMAN LINEMAN,Journey,105.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,105.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,105.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,105.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",105.00,"105.00 0.000.000.000.000.00","0.000.00 105.00",,,,,,,, +"",,,,,,,,,0.00,105.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,105.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,105.00, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,"2,103.25","1,791.25",0.00,312.00,0.00,0.00,0.00,0.00,0.00,"2,103.25" +"",Apprentice,880.00,632.00,0.00,248.00,0.00,0.00,0.00,0.00,8.00,872.00 +"",A/J Ratio,0.42,0.35,0.00,0.79,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,983.25","2,423.25",0.00,560.00,0.00,0.00,0.00,0.00,8.00,"2,975.25" +TELECOMMUNICATION TECHNICIAN,Journey,689.00,601.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,689.00 +"",Apprentice,324.00,324.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,324.00 +"",A/J Ratio,0.47,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.47 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,013.00",925.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,"1,013.00" +Total for Contractor,Journey,"2,792.25","2,392.25",0.00,312.00,88.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"2,792.25" +"",Apprentice,"1,204.00",956.00,0.00,248.00,0.00,0.00,0.00,0.00,8.00,"1,196.00" +"",A/J Ratio,0.43,0.40,0.00,0.79,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,996.25","3,348.25",0.00,560.00,88.00,0.00,0.00,0.00,8.00,"3,988.25" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,31.50,31.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.50 +"",Apprentice,23.50,23.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,23.50 +"",A/J Ratio,0.75,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.75 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +MARBLE & TILE FINISHERS,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"",Apprentice,23.50,23.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,23.50 +"",A/J Ratio,0.59,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,63.00,63.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,63.00 +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00 +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",268.00,"268.00 0.000.000.000.000.00","0.000.00 268.00",,,,,,,, +"",,,,,,,,0.00,268.00,, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00, +Total Journey Hours,"17,172.75","15,372.75",340.00,"1,245.00",128.00,0.00,87.00,0.00,181.00,"16,991.75", +Total Apprentice Hours,"3,103.50","1,823.50",248.00,922.00,110.00,0.00,0.00,0.00,354.00,"2,749.50", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"20,276.25","17,196.25",588.00,"2,167.00",238.00,0.00,87.00,0.00,535.00,"19,741.25", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Crocker Architectural Sheet Metal,,,,,,,,,,, +ROOFER,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",42.00,"42.00 0.000.000.000.000.00","0.000.00 42.00",,,,,,,, +"",,,,,,,,,,0.00,42.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +Mobile Fencing,,,,,,,,,,, +LABORER,Journey,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,10.00 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Veterans Scaffold,,,,,,,,,,, +LABORER,Journey,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",52.00,"52.00 0.000.000.000.000.00","0.000.00 52.00",,,,,,,, +"",,,,,,,,0.00,52.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00, +Total Journey Hours,196.00,191.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,196.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,196.00,191.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,196.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"E. Amanti & Sons, Inc",,,,,,,,,,, +SHEETMETAL WORKER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,59.00,59.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,59.00 +"",Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.50,66.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",59.00,"59.00 0.000.000.000.000.00","0.000.00 59.00",,,,,,,, +"",,,,,,,,,,0.00,59.00 +"",Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.50,66.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.50 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,97.00,97.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,97.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,97.00,97.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,97.00 +EQUIPMENT OPERATOR (Class A CDL),Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,107.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +KMD Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,12.00,0.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,0.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"0.00 12.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,0.00,12.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,0.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,10.00,4.75,0.00,5.25,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,4.75,0.00,5.25,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,10.00,4.75,0.00,5.25,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,10.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,4.75,0.00,5.25,0.00,0.00,0.00,0.00,0.00,10.00, +Zap Electric,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",296.00,"296.00 0.000.000.000.000.00","0.000.00 296.00",,,,,,,, +"",,,,,,,,,0.00,296.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +Total Journey Hours,549.00,531.75,12.00,5.25,0.00,0.00,0.00,0.00,0.00,549.00, +Total Apprentice Hours,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,556.50,539.25,12.00,5.25,0.00,0.00,0.00,0.00,0.00,556.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +Total for Contractor,Journey,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,50.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Atlantic Coast Dismantling LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,24.00,8.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,8.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"8.00 0.0016.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,8.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +PIPEFITTER & STEAMFITTER,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,178.00,178.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,178.00,178.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.00, +Total Journey Hours,276.00,260.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,276.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,276.00,260.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,276.00, diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportAug2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportAug2019.csv new file mode 100644 index 00000000..716c8fdd --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportAug2019.csv @@ -0,0 +1,2722 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,7.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"0.00 0.007.000.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,0.00,7.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,7.00, +Total Journey Hours,7.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,7.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,7.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"E. Amanti & Sons, Inc",,,,,,,,,,, +SHEETMETAL WORKER,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +Total for Contractor,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,8.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50, +Total Journey Hours,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,768.50,735.50,33.00,0.00,0.00,0.00,0.00,0.00,0.00,768.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,768.50,735.50,33.00,0.00,0.00,0.00,0.00,0.00,0.00,768.50, +EQUIPMENT OPERATOR (Class A CDL),Journey,120.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,120.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +LABORER,Journey,"1,346.00","1,346.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,346.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,346.00","1,346.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,346.00", +Total for Contractor,Journey,"2,234.50","2,081.50",153.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,"2,234.50", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"2,234.50","2,081.50",153.00,0.00,0.00,0.00,0.00,0.00,0.00,"2,234.50", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50, +Apprentice,6.50,0.00,6.50,0.00,0.00,0.00,0.00,0.00,0.00,6.50,, +A/J Ratio,0.76,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.76,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,15.00,8.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,15.00,, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +Apprentice,6.50,0.00,6.50,0.00,0.00,0.00,0.00,0.00,0.00,6.50, +A/J Ratio,0.76,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.76, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.00,8.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,15.00, +Total Journey Hours,"2,243.00","2,090.00",153.00,0.00,0.00,0.00,0.00,0.00,0.00,"2,243.00", +Total Apprentice Hours,6.50,0.00,6.50,0.00,0.00,0.00,0.00,0.00,0.00,6.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,249.50","2,090.00",159.50,0.00,0.00,0.00,0.00,0.00,0.00,"2,249.50", +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",75.50,"75.50 0.000.000.000.000.00","0.000.00 75.50",,,,,,,, +"",,,,,,,,,,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.22,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.22 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Total for Contractor,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.22,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.22 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Crestview Construction & Trucking Inc.,,,,,,,,,,, +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,32.00,24.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"24.00 8.000.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,0.00,32.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"King Painting, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,6.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Ondrick Materials & Recycling, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +EQUIPMENT OPERATOR (Class A CDL),Journey,6.50,3.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,6.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.50,3.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,6.50 +LABORER,Journey,23.75,20.25,0.00,3.50,0.00,0.00,0.00,0.00,0.00,23.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,23.75,20.25,0.00,3.50,0.00,0.00,0.00,0.00,0.00,23.75 +Total for Contractor,Journey,31.75,23.25,3.50,5.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,31.75, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.75,23.25,3.50,5.00,0.00,0.00,0.00,0.00,0.00,31.75 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,213.00,213.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,213.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,213.00,213.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,213.00 +SALAMON FLOORING INC,,,,,,,,,,, +FLOORCOVERER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,15.00,7.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,7.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,15.00 +Total for Contractor,Journey,15.00,7.50,0.00,7.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,15.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.00,7.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,15.00, +"Ultimate Construction, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,15.00,8.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,8.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,15.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",15.00,"8.00 0.000.000.000.007.00","0.000.00 15.00",,,,,,,, +"",,,,,,,,,0.00,15.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,8.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,15.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,10.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Journey Hours,440.25,409.25,11.50,12.50,0.00,0.00,7.00,0.00,0.00,440.25, +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,448.25,417.25,11.50,12.50,0.00,0.00,7.00,0.00,0.00,448.25, +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,76.00,64.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,64.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +CEMENT MASONRY/PLASTERING,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +DEMO: CONCRETE CUTTER/SAWYER,Journey,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +LABORER,Journey,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,14.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,14.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",104.00,"76.00 12.0016.000.000.000.00","0.000.00 104.00",,,,,,,, +"",,,,,,,,,0.00,104.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,76.00,12.00,16.00,0.00,0.00,0.00,0.00,0.00,104.00, +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,104.00,76.00,12.00,16.00,0.00,0.00,0.00,0.00,0.00,104.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,104.00,76.00,12.00,16.00,0.00,0.00,0.00,0.00,0.00,104.00 +"Project Name: DCP1907 OM2 C Job Order Contract For General Contractor Services Project Code: DCP1907 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ONE SOURCE CONSTRUCTION, LLC",,,,,,,,,,, +CARPENTER,Journey,19.60,2.80,0.00,16.80,0.00,0.00,0.00,0.00,0.00,19.60 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.60,2.80,0.00,16.80,0.00,0.00,0.00,0.00,0.00,19.60 +ELECTRICIAN,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +Total for Contractor,Journey,33.60,16.80,0.00,16.80,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,33.60,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.60,16.80,0.00,16.80,0.00,0.00,0.00,0.00,0.00,33.60, +Total Journey Hours,33.60,16.80,0.00,16.80,0.00,0.00,0.00,0.00,0.00,33.60, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,33.60,16.80,0.00,16.80,0.00,0.00,0.00,0.00,0.00,33.60, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",137.00,"137.00 0.000.000.000.000.00","0.000.00 137.00",,,,,,,, +"",,,,,,,,,,0.00,137.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,172.50,172.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.50 +"",Apprentice,156.50,116.50,0.00,0.00,40.00,0.00,0.00,0.00,0.00,156.50 +"",A/J Ratio,0.91,0.68,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.91 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,329.00,289.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,329.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",172.50,"172.50 0.000.000.000.000.00","0.000.00 172.50",,,,,,,, +"",,,,,,,,,0.00,172.50, +"",Apprentice,156.50,116.50,0.00,0.00,40.00,0.00,0.00,0.00,0.00,156.50 +"",A/J Ratio,0.91,0.68,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.91 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,329.00,289.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,329.00 +"Lemelin Environmental Services, Inc.",,,,,,,,,,, +LABORER,Journey,2.50,0.00,0.00,0.00,0.00,0.00,2.50,0.00,0.00,2.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.50,0.00,0.00,0.00,0.00,0.00,2.50,0.00,0.00,2.50 +Total for Contractor,Journey,2.50,0.00,0.00,0.00,0.00,0.00,2.50,0.00,, +"",,,,,,,,0.00,2.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.50,0.00,0.00,0.00,0.00,0.00,2.50,0.00,0.00,2.50, +"Manafort-Precision, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +IRONWORKER/WELDER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +LABORER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Total for Contractor,Journey,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,52.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +"Manganaro Northeast, LLC",,,,,,,,,,, +CARPENTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +DRIVER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +VAC-HAUL,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",344.00,"344.00 0.000.000.000.000.00","0.000.00 344.00",,,,,,,, +"",,,,,,,,,0.00,344.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,344.00,344.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,344.00, +Tri State Building LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,739.00,647.00,0.00,0.00,0.00,0.00,92.00,0.00,192.00,547.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,739.00,647.00,0.00,0.00,0.00,0.00,92.00,0.00,192.00,547.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",739.00,"647.00 0.000.000.000.0092.00","0.00192.00 547.00",,,,,,,, +"",,,,,,,,,192.00,547.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,739.00,647.00,0.00,0.00,0.00,0.00,92.00,0.00,192.00,547.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +LABORER,Journey,"1,028.00",948.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,028.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,028.00",948.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,028.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,204.00","1,124.00 0.0080.000.000.000.00","0.000.00 1,204.00",,,,,,,, +"",,,,,,,,0.00,"1,204.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,204.00","1,124.00",0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,204.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,742.00","2,567.50",0.00,80.00,0.00,0.00,94.50,0.00,192.00,"2,550.00" +Total Apprentice Hours,156.50,116.50,0.00,0.00,40.00,0.00,0.00,0.00,0.00,156.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,898.50","2,684.00",0.00,80.00,40.00,0.00,94.50,0.00,192.00,"2,706.50" +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,591.00,559.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,591.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,591.00,559.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,591.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",591.00,"559.00 32.000.000.000.000.00","0.000.00 591.00",,,,,,,, +"",,,,,,,,,,0.00,591.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,591.00,559.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,591.00 +"Lanco Scaffolding, Inc.",,,,,,,,,,, +CARPENTER,Journey,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +LABORER,Journey,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"0.00 0.0072.000.000.000.00","0.000.00 72.00",,,,,,,, +"",,,,,,,,,0.00,72.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,72.00,0.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,663.00,559.00,32.00,72.00,0.00,0.00,0.00,0.00,0.00,663.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,663.00,559.00,32.00,72.00,0.00,0.00,0.00,0.00,0.00,663.00 +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Commercial Air Control, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 0.0016.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Contractors Network, Inc.",,,,,,,,,,, +CARPENTER,Journey,392.00,392.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,392.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,392.00,392.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,392.00 +Total for Contractor,Journey,392.00,392.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,392.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,392.00,392.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,392.00 +"Systems Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +Total Journey Hours,464.00,448.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,464.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,464.00,448.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,464.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +"",Apprentice,140.00,140.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.00 +"",A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,500.00,500.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,500.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",360.00,"360.00 0.000.000.000.000.00","0.000.00 360.00",,,,,,,, +"",,,,,,,,,,0.00,360.00 +"",Apprentice,140.00,140.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.00 +"",A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,500.00,500.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,500.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +PLUMBERS & GASFITTERS,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +A/J Ratio,0.56,0.56,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.56, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",159.50,"159.50 0.000.000.000.000.00","0.000.00 159.50",,,,,,,, +"",,,,,,,,,0.00,159.50, +Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,239.50,239.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,239.50, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +SPRINKLER FITTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,577.00,473.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,577.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,577.00,473.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,577.00 +LABORER,Journey,523.00,403.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,523.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,523.00,403.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,523.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,100.00","876.00 0.00224.000.000.000.00","0.000.00 1,100.00",,,,,,,, +"",,,,,,,,,0.00,"1,100.00", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,100.00",876.00,0.00,224.00,0.00,0.00,0.00,0.00,0.00,"1,100.00", +Debrino Caulking Associates Inc.,,,,,,,,,,, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,128.00,96.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,96.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,128.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",128.00,"96.00 0.0032.000.000.000.00","0.000.00 128.00",,,,,,,, +"",,,,,,,,,,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,96.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,128.00 +Door & Security Solutions LLC,,,,,,,,,,, +CARPENTER,Journey,90.16,90.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.16 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,90.16,90.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.16 +Total for Contractor,Journey,90.16,90.16,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,90.16 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,90.16,90.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.16 +"Greenfield Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +A/J Ratio,0.93,0.93,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.93, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",A/J Ratio,0.88,0.88,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.88 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,166.00,166.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,166.00,166.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,50.25,50.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.25,50.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.25 +LABORER,Journey,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +Total for Contractor,Journey,406.25,406.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,406.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,406.25,406.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,406.25 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,176.64,176.64,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.64 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.64,176.64,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.64, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.64,"176.64 0.000.000.000.000.00","0.000.00 176.64",,,,,,,, +"",,,,,,,,,0.00,176.64, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.64,176.64,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.64, +"William F. Lynch Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +SHEETMETAL WORKER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Total for Contractor,Journey,336.00,336.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,336.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,336.00,336.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,336.00, +Total Journey Hours,"2,820.55","2,564.55",0.00,256.00,0.00,0.00,0.00,0.00,0.00,"2,820.55", +Total Apprentice Hours,234.00,234.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,054.55","2,798.55",0.00,256.00,0.00,0.00,0.00,0.00,0.00,"3,054.55", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"GFS Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,280.00,120.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,280.00 +"",Apprentice,160.00,0.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.57,0.00,0.00,1.00,0.00,0.00,0.00,0.00,0.00,0.57 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,120.00,0.00,320.00,0.00,0.00,0.00,0.00,0.00,440.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",280.00,"120.00 0.00160.000.000.000.00","0.000.00 280.00",,,,,,,, +"",,,,,,,,,,0.00,280.00 +"",Apprentice,160.00,0.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.57,0.00,0.00,1.00,0.00,0.00,0.00,0.00,0.00,0.57 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,120.00,0.00,320.00,0.00,0.00,0.00,0.00,0.00,440.00 +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.17,0.17,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.17 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +PIPEFITTER & STEAMFITTER,Journey,83.50,83.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,83.50,83.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",273.50,"273.50 0.000.000.000.000.00","0.000.00 273.50",,,,,,,, +"",,,,,,,,,0.00,273.50, +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +A/J Ratio,0.12,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.12, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,305.50,305.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,305.50, +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,553.50,393.50,0.00,160.00,0.00,0.00,0.00,0.00,0.00,553.50 +Total Apprentice Hours,192.00,32.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,192.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,745.50,425.50,0.00,320.00,0.00,0.00,0.00,0.00,0.00,745.50 +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.50,"1.50 0.000.000.000.000.00","0.000.00 1.50",,,,,,,, +"",,,,,,,,0.00,1.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +Total Journey Hours,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +andy ramos electric llc,,,,,,,,,,, +ELECTRICIAN,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",22.00,"22.00 0.000.000.000.000.00","0.000.00 22.00",,,,,,,, +"",,,,,,,,,,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"Professional Fire Systems, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Total for Contractor,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,76.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00, +Total Journey Hours,98.00,98.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,98.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,98.00,98.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,98.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,75.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.00 +SHEETMETAL WORKER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Total for Contractor,Journey,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,95.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,158.00,158.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,158.00,158.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",158.00,"158.00 0.000.000.000.000.00","0.000.00 158.00",,,,,,,, +"",,,,,,,,,0.00,158.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,158.00,158.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00, +Ayotte and King for Tile Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +LABORER: CARPENTER TENDER,Journey,56.00,0.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,0.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",216.00,"160.00 0.0056.000.000.000.00","0.000.00 216.00",,,,,,,, +"",,,,,,,,,0.00,216.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,216.00,160.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,216.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,136.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",136.00,"136.00 0.000.000.000.000.00","0.000.00 136.00",,,,,,,, +"",,,,,,,,,,0.00,136.00 +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,136.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,0.00,11.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Simplex Grinnell LP,,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +SOS Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"72.00 0.000.000.000.000.00","0.0040.00 32.00",,,,,,,, +"",,,,,,,,,,40.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,32.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Titan Roofing, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,22.50,22.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.50,22.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.50 +ROOFER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,7.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,14.00 +SHEETMETAL WORKER,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Total for Contractor,Journey,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,42.50, +"",Apprentice,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00 +"",A/J Ratio,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.16 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.50,42.50,0.00,0.00,0.00,0.00,7.00,0.00,0.00,49.50 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,271.25,271.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,271.25 +"",Apprentice,160.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,431.25,271.25,160.00,0.00,0.00,0.00,0.00,0.00,0.00,431.25 +TELECOMMUNICATION TECHNICIAN,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +Apprentice,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,317.25,317.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.25 +Apprentice,166.00,6.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,166.00, +A/J Ratio,0.52,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.52, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,483.25,323.25,160.00,0.00,0.00,0.00,0.00,0.00,0.00,483.25, +Total Journey Hours,"1,320.75","1,264.75",0.00,56.00,0.00,0.00,0.00,0.00,40.00,"1,280.75", +Total Apprentice Hours,213.00,46.00,160.00,0.00,0.00,0.00,7.00,0.00,40.00,173.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,533.75","1,310.75",160.00,56.00,0.00,0.00,7.00,0.00,80.00,"1,453.75", +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Environmental, Inc.",,,,,,,,,,, +LABORER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 0.0016.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +BG Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",36.00,"28.00 0.008.000.000.000.00","0.000.00 36.00",,,,,,,, +"",,,,,,,,,0.00,36.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.00,28.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,36.00, +"Collins Electric Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50 +Apprentice,31.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,0.00,31.50, +A/J Ratio,0.97,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.97, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,32.50,31.50,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.50,"32.50 0.000.000.000.000.00","0.000.00 32.50",,,,,,,, +"",,,,,,,,,0.00,32.50, +Apprentice,31.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,0.00,31.50, +A/J Ratio,0.97,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.97, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,32.50,31.50,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +Total Journey Hours,84.50,60.50,0.00,24.00,0.00,0.00,0.00,0.00,0.00,84.50, +Total Apprentice Hours,31.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,0.00,31.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,116.00,60.50,31.50,24.00,0.00,0.00,0.00,0.00,0.00,116.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"2.00 0.000.002.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,161.00,140.00,0.00,8.00,13.00,0.00,0.00,0.00,0.00,161.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,161.00,140.00,0.00,8.00,13.00,0.00,0.00,0.00,0.00,161.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",161.00,"140.00 0.008.0013.000.000.00","0.000.00 161.00",,,,,,,, +"",,,,,,,,0.00,161.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,161.00,140.00,0.00,8.00,13.00,0.00,0.00,0.00,0.00,161.00, +Total Journey Hours,161.00,140.00,0.00,8.00,13.00,0.00,0.00,0.00,0.00,161.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,161.00,140.00,0.00,8.00,13.00,0.00,0.00,0.00,0.00,161.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,0.00,12.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +SHEETMETAL WORKER,Journey,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,120.00,32.00,0.00,88.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,32.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,120.00 +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,187.00,107.00,0.00,0.00,0.00,0.00,80.00,0.00,0.00,187.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,187.00,107.00,0.00,0.00,0.00,0.00,80.00,0.00,0.00,187.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",187.00,"107.00 0.000.000.000.0080.00","0.000.00 187.00",,,,,,,, +"",,,,,,,,,0.00,187.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,187.00,107.00,0.00,0.00,0.00,0.00,80.00,0.00,0.00,187.00, +GML Construction Inc,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +EQUIPMENT OPERATOR (Class A CDL),Journey,1.35,0.00,0.00,0.00,0.00,0.00,1.35,0.00,0.00,1.35 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.35,0.00,0.00,0.00,0.00,0.00,1.35,0.00,0.00,1.35 +LABORER,Journey,3.10,0.00,0.00,0.00,0.00,0.00,3.10,0.00,0.00,3.10 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.10,0.00,0.00,0.00,0.00,0.00,3.10,0.00,0.00,3.10 +Total for Contractor,Journey,4.45,0.00,0.00,0.00,0.00,0.00,4.45,0.00,, +"",,,,,,,,,,0.00,4.45 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.45,0.00,0.00,0.00,0.00,0.00,4.45,0.00,0.00,4.45 +"H Carr & Sons, Inc",,,,,,,,,,, +LABORER,Journey,24.00,16.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,16.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,24.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,24.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,32.00 +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +ROOFER,Journey,18.00,9.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,13.00,9.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",A/J Ratio,0.72,1.00,0.00,0.44,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.00,18.00,0.00,13.00,0.00,0.00,0.00,0.00,0.00,31.00 +Total for Contractor,Journey,36.00,27.00,0.00,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,13.00,9.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",A/J Ratio,0.36,0.33,0.00,0.44,0.00,0.00,0.00,0.00,0.00,0.36 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.00,36.00,0.00,13.00,0.00,0.00,0.00,0.00,0.00,49.00 +"Lighthouse Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: MASON TENDER,Journey,496.00,296.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,496.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,496.00,296.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,496.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",928.00,"728.00 0.00200.000.000.000.00","0.000.00 928.00",,,,,,,, +"",,,,,,,,,,0.00,928.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,928.00,728.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,928.00 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,171.00,171.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,171.00 +"",Apprentice,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.80,0.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,307.00,307.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,307.00 +Total for Contractor,Journey,171.00,171.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,171.00 +"",Apprentice,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.80,0.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,307.00,307.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,307.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,760.00,760.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,760.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,760.00,760.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,760.00 +CEMENT MASONRY/PLASTERING,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER: CARPENTER TENDER,Journey,424.00,424.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,424.00,424.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00 +LABORER: CEMENT FINISHER TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,208.00","1,208.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,208.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,208.00","1,208.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,208.00", +Total Journey Hours,"2,687.28","2,297.83",0.00,297.00,0.00,0.00,92.45,0.00,0.00,"2,687.28", +Total Apprentice Hours,149.00,145.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,149.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,836.28","2,442.83",0.00,301.00,0.00,0.00,92.45,0.00,0.00,"2,836.28", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"0.00 0.008.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,571.00,571.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,571.00 +Apprentice,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00,0.00, +A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,760.00,760.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00,571.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,571.00,571.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,571.00 +"",Apprentice,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00,0.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,760.00,760.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00,571.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,504.00,416.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,504.00 +"",Apprentice,494.00,338.00,156.00,0.00,0.00,0.00,0.00,0.00,91.00,403.00 +"",A/J Ratio,0.98,0.81,1.77,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,998.00,754.00,244.00,0.00,0.00,0.00,0.00,0.00,91.00,907.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",504.00,"416.00 88.000.000.000.000.00","0.000.00 504.00",,,,,,,, +"",,,,,,,,,0.00,504.00, +"",Apprentice,494.00,338.00,156.00,0.00,0.00,0.00,0.00,0.00,91.00,403.00 +"",A/J Ratio,0.98,0.81,1.77,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,998.00,754.00,244.00,0.00,0.00,0.00,0.00,0.00,91.00,907.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +Total for Contractor,Journey,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,204.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00, +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,241.00,241.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,241.00,241.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.00 +IRONWORKER/WELDER,Journey,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +Total for Contractor,Journey,601.00,601.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,601.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,601.00,601.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,601.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"2,592.50","2,457.50",0.00,135.00,0.00,0.00,0.00,0.00,0.00,"2,592.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,592.50","2,457.50",0.00,135.00,0.00,0.00,0.00,0.00,0.00,"2,592.50" +LABORER,Journey,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"3,032.50","2,897.50",0.00,135.00,0.00,0.00,0.00,0.00,0.00,"3,032.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,032.50","2,897.50",0.00,135.00,0.00,0.00,0.00,0.00,0.00,"3,032.50" +"Cyber Communications Solutions, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,10.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"0.00 10.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00,0.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,204.00,108.00,0.00,56.00,40.00,0.00,0.00,0.00,0.00,204.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,108.00,0.00,56.00,40.00,0.00,0.00,0.00,0.00,204.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,266.00,170.00,0.00,56.00,40.00,0.00,0.00,0.00,62.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,266.00,170.00,0.00,56.00,40.00,0.00,0.00,0.00,62.00,204.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,241.25,241.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,241.25,241.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.25 +ELEVATOR CONSTRUCTOR HELPER,Journey,221.50,221.50,0.00,0.00,0.00,0.00,0.00,0.00,4.00,217.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,221.50,221.50,0.00,0.00,0.00,0.00,0.00,0.00,4.00,217.50 +Total for Contractor,Journey,462.75,462.75,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,4.00,458.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,462.75,462.75,0.00,0.00,0.00,0.00,0.00,0.00,4.00,458.75 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,493.00,493.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,493.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,493.00,493.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,493.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,971.00,971.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,971.00 +"",Apprentice,173.00,0.00,0.00,173.00,0.00,0.00,0.00,0.00,173.00,0.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,144.00",971.00,0.00,173.00,0.00,0.00,0.00,0.00,173.00,971.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,464.00","1,464.00 0.000.000.000.000.00","0.000.00 1,464.00",,,,,,,, +"",,,,,,,,,,0.00,"1,464.00" +"",Apprentice,173.00,0.00,0.00,173.00,0.00,0.00,0.00,0.00,173.00,0.00 +"",A/J Ratio,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,637.00","1,464.00",0.00,173.00,0.00,0.00,0.00,0.00,173.00,"1,464.00" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,425.50,425.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,425.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,425.50,425.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,425.50 +LABORER,Journey,445.00,445.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,445.00 +Apprentice,190.00,72.00,118.00,0.00,0.00,0.00,0.00,0.00,72.00,118.00, +A/J Ratio,0.43,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,635.00,517.00,118.00,0.00,0.00,0.00,0.00,0.00,72.00,563.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",870.50,"870.50 0.000.000.000.000.00","0.000.00 870.50",,,,,,,, +"",,,,,,,,,0.00,870.50, +Apprentice,190.00,72.00,118.00,0.00,0.00,0.00,0.00,0.00,72.00,118.00, +A/J Ratio,0.22,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,060.50",942.50,118.00,0.00,0.00,0.00,0.00,0.00,72.00,988.50, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +PLUMBERS & GASFITTERS,Journey,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +"",Apprentice,186.50,186.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.50 +"",A/J Ratio,0.73,0.73,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.73 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,442.50,442.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,442.50 +Total for Contractor,Journey,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,260.00 +"",Apprentice,186.50,186.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.50 +"",A/J Ratio,0.72,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,446.50,446.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,446.50 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Emanouil Landscaping,,,,,,,,,,, +LABORER,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,98.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,98.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",138.00,"138.00 0.000.000.000.000.00","0.0040.00 98.00",,,,,,,, +"",,,,,,,,,,40.00,98.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,98.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,76.50,76.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.50,76.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.50 +LABORER: MASON TENDER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,148.50,148.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,148.50,148.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.50 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",29.50,"29.50 0.000.000.000.000.00","0.000.00 29.50",,,,,,,, +"",,,,,,,,,0.00,29.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,15.00,12.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,7.50,4.50,3.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",A/J Ratio,0.50,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.50,16.50,3.00,3.00,0.00,0.00,0.00,0.00,0.00,22.50 +Total for Contractor,Journey,15.00,12.00,0.00,3.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,15.00,, +Apprentice,7.50,4.50,3.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +A/J Ratio,0.50,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.50,16.50,3.00,3.00,0.00,0.00,0.00,0.00,0.00,22.50, +First Choice Finishes,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,544.00,416.00,16.00,112.00,0.00,0.00,0.00,0.00,0.00,544.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,544.00,416.00,16.00,112.00,0.00,0.00,0.00,0.00,0.00,544.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",544.00,"416.00 16.00112.000.000.000.00","0.000.00 544.00",,,,,,,, +"",,,,,,,,,,0.00,544.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,544.00,416.00,16.00,112.00,0.00,0.00,0.00,0.00,0.00,544.00 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,272.00,128.00,0.00,144.00,0.00,0.00,0.00,0.00,0.00,272.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,272.00,128.00,0.00,144.00,0.00,0.00,0.00,0.00,0.00,272.00 +Total for Contractor,Journey,272.00,128.00,0.00,144.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,272.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,272.00,128.00,0.00,144.00,0.00,0.00,0.00,0.00,0.00,272.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,319.00,319.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,319.00 +"",Apprentice,283.00,283.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,283.00 +"",A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,602.00,602.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,602.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",479.00,"479.00 0.000.000.000.000.00","0.000.00 479.00",,,,,,,, +"",,,,,,,,,,0.00,479.00 +"",Apprentice,283.00,283.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,283.00 +"",A/J Ratio,0.59,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,762.00,762.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,762.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,856.00,856.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,856.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,856.00,856.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,856.00 +Total for Contractor,Journey,856.00,856.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,856.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,856.00,856.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,856.00 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00, +A/J Ratio,0.72,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",A/J Ratio,0.72,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,402.00,290.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,402.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,402.00,290.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,402.00 +CEMENT MASONRY/PLASTERING,Journey,47.50,47.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,47.50,47.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.50 +IRONWORKER/WELDER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +LABORER,Journey,323.00,299.00,8.00,16.00,0.00,0.00,0.00,0.00,0.00,323.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,323.00,299.00,8.00,16.00,0.00,0.00,0.00,0.00,0.00,323.00 +PUMP OPERATOR (CONCRETE),Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,823.00,687.00,8.00,128.00,0.00,0.00,0.00,0.00,0.00,823.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,823.00,687.00,8.00,128.00,0.00,0.00,0.00,0.00,0.00,823.00 +Morse-Collins Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +New England Deck & Floors Incorporated,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00, +New Tech Installation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,579.00,579.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,579.00 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.11,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,643.00,643.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",579.00,"579.00 0.000.000.000.000.00","0.000.00 579.00",,,,,,,, +"",,,,,,,,,,0.00,579.00 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.11,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,643.00,643.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,19.00,3.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,3.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +PIPEFITTER & STEAMFITTER,Journey,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",95.00,"95.00 0.000.000.000.000.00","0.000.00 95.00",,,,,,,, +"",,,,,,,,,0.00,95.00, +Apprentice,19.00,3.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00, +A/J Ratio,0.20,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,114.00,98.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00, +"Safway Services LLC, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +MECHANICS MAINTENANCE,Journey,270.50,270.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,270.50,270.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",270.50,"270.50 0.000.000.000.000.00","0.000.00 270.50",,,,,,,, +"",,,,,,,,,,0.00,270.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,270.50,270.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,240.00,208.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,208.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,240.00 +LABORER,Journey,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",248.00,"212.00 0.0036.000.000.000.00","0.000.00 248.00",,,,,,,, +"",,,,,,,,,0.00,248.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,248.00,212.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,248.00, +"The Trinity Construction Group, LLC",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,42.00,29.50,0.00,12.50,0.00,0.00,0.00,0.00,1.50,40.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.00,29.50,0.00,12.50,0.00,0.00,0.00,0.00,1.50,40.50 +Total for Contractor,Journey,42.00,29.50,0.00,12.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,1.50,40.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.00,29.50,0.00,12.50,0.00,0.00,0.00,0.00,1.50,40.50 +ver-tex construction specialties,,,,,,,,,,, +CARPENTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,7.50,0.00,0.00,7.50,0.00,0.00,0.00,0.00,0.00,7.50, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,0.00,0.00,7.50,0.00,0.00,0.00,0.00,0.00,7.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +JOURNEYMAN LINEMAN,Journey,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",53.50,"53.50 0.000.000.000.000.00","0.000.00 53.50",,,,,,,, +"",,,,,,,,,,0.00,53.50 +"",Apprentice,7.50,0.00,0.00,7.50,0.00,0.00,0.00,0.00,0.00,7.50 +"",A/J Ratio,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,61.00,53.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,61.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,549.75","1,367.75",0.00,182.00,0.00,0.00,0.00,0.00,6.00,"1,543.75" +"",Apprentice,896.50,557.50,0.00,339.00,0.00,0.00,0.00,0.00,168.00,728.50 +"",A/J Ratio,0.58,0.41,0.00,1.86,0.00,0.00,0.00,0.00,28.00,0.47 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,446.25","1,925.25",0.00,521.00,0.00,0.00,0.00,0.00,174.00,"2,272.25" +TELECOMMUNICATION TECHNICIAN,Journey,786.00,475.00,0.00,151.00,160.00,0.00,0.00,0.00,0.00,786.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.01,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,794.00,483.00,0.00,151.00,160.00,0.00,0.00,0.00,0.00,794.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,335.75","1,842.75 0.00333.00160.000.000.00","0.006.00 2,329.75",,,,,,,, +"",,,,,,,,,6.00,"2,329.75", +Apprentice,904.50,565.50,0.00,339.00,0.00,0.00,0.00,0.00,168.00,736.50, +A/J Ratio,0.39,0.31,0.00,1.02,0.00,0.00,0.00,0.00,28.00,0.32, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"3,240.25","2,408.25",0.00,672.00,160.00,0.00,0.00,0.00,174.00,"3,066.25", +"West Floor Covering, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FLOORCOVERER,Journey,96.00,8.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.08,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,16.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,104.00 +MARBLE & TILE FINISHERS,Journey,739.00,523.00,0.00,216.00,0.00,0.00,0.00,0.00,0.00,739.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,739.00,523.00,0.00,216.00,0.00,0.00,0.00,0.00,0.00,739.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,996.50,558.50,0.00,438.00,0.00,0.00,0.00,0.00,0.00,996.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,996.50,558.50,0.00,438.00,0.00,0.00,0.00,0.00,0.00,996.50 +Total for Contractor,Journey,"1,831.50","1,089.50",0.00,742.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,831.50" +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.00,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,839.50","1,097.50",0.00,742.00,0.00,0.00,0.00,0.00,0.00,"1,839.50" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00, +Total Journey Hours,"17,526.00","15,486.50",122.00,"1,717.50",200.00,0.00,0.00,0.00,113.50,"17,412.50", +Total Apprentice Hours,"2,630.00","1,817.50",293.00,519.50,0.00,0.00,0.00,0.00,693.00,"1,937.00", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"20,156.00","17,304.00",415.00,"2,237.00",200.00,0.00,0.00,0.00,806.50,"19,349.50", +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Banner Environmental Inc.,,,,,,,,,,, +"ASBESTOS REMOVER - PIPE / MECH. EQUIPT",Journey,160.50,105.50,0.00,55.00,0.00,0.00,0.00,0.00,0.00,160.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.50,105.50,0.00,55.00,0.00,0.00,0.00,0.00,0.00,160.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",160.50,"105.50 0.0055.000.000.000.00","0.000.00 160.50",,,,,,,, +"",,,,,,,,,,0.00,160.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.50,105.50,0.00,55.00,0.00,0.00,0.00,0.00,0.00,160.50 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,655.00,481.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,655.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,655.00,481.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,655.00 +LABORER,Journey,372.00,372.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,372.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,372.00,372.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,372.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,027.00","853.00 0.00174.000.000.000.00","0.000.00 1,027.00",,,,,,,, +"",,,,,,,,,0.00,"1,027.00", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,027.00",853.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,"1,027.00", +Crocker Architectural Sheet Metal,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +SHEETMETAL WORKER,Journey,213.50,213.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,213.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,213.50,213.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,213.50 +Total for Contractor,Journey,241.50,241.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,241.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,241.50,241.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.50 +"JRJ Corporation Co., Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"32.00 0.000.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,0.00,32.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Marguerite Concrete, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,392.00,328.00,0.00,0.00,0.00,0.00,64.00,0.00,0.00,392.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,392.00,328.00,0.00,0.00,0.00,0.00,64.00,0.00,0.00,392.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,200.00,0.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,0.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,200.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",592.00,"328.00 0.00200.000.000.0064.00","0.000.00 592.00",,,,,,,, +"",,,,,,,,,0.00,592.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,592.00,328.00,0.00,200.00,0.00,0.00,64.00,0.00,0.00,592.00 +Yard Works Inc.,,,,,,,,,,, +LABORER,Journey,82.50,2.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,82.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,82.50,2.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,82.50 +Total for Contractor,Journey,82.50,2.50,0.00,80.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,82.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,82.50,2.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,82.50, +Total Journey Hours,"2,154.50","1,565.50",0.00,509.00,0.00,0.00,80.00,0.00,0.00,"2,154.50", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,154.50","1,565.50",0.00,509.00,0.00,0.00,80.00,0.00,0.00,"2,154.50", +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +LABORER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,185.00,185.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,185.00 +Apprentice,138.00,0.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,138.00, +A/J Ratio,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.75, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,323.00,185.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,323.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",185.00,"185.00 0.000.000.000.000.00","0.000.00 185.00",,,,,,,, +"",,,,,,,,,0.00,185.00, +Apprentice,138.00,0.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,138.00, +A/J Ratio,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.75, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,323.00,185.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,323.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",27.00,"27.00 0.000.000.000.000.00","0.000.00 27.00",,,,,,,, +"",,,,,,,,,,0.00,27.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +Total for Contractor,Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,111.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,339.00,339.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,339.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,339.00,339.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,339.00 +EQUIPMENT OPERATOR (Class A CDL),Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +LABORER,Journey,90.50,90.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,90.50,90.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",436.50,"436.50 0.000.000.000.000.00","0.000.00 436.50",,,,,,,, +"",,,,,,,,,0.00,436.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,436.50,436.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,436.50, +"Gomes Construction Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,191.50,191.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,191.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,191.50,191.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,191.50 +LABORER,Journey,373.50,246.50,0.00,127.00,0.00,0.00,0.00,0.00,81.50,292.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,373.50,246.50,0.00,127.00,0.00,0.00,0.00,0.00,81.50,292.00 +Total for Contractor,Journey,565.00,438.00,0.00,127.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,81.50,483.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,565.00,438.00,0.00,127.00,0.00,0.00,0.00,0.00,81.50,483.50 +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,36.00,0.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,0.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,36.00 +INSULATOR (PIPES & TANKS),Journey,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50 +"",Apprentice,36.00,0.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.99,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.99 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.50,36.50,0.00,36.00,0.00,0.00,0.00,0.00,0.00,72.50 +"Johnson Controls, Inc.",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"1.00 0.000.000.000.000.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,,,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Kenney Masonry,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50 +LABORER: MASON TENDER,Journey,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +PIPEFITTER & STEAMFITTER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +PLUMBERS & GASFITTERS,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",172.00,"172.00 0.000.000.000.000.00","0.000.00 172.00",,,,,,,, +"",,,,,,,,,0.00,172.00, +Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,236.00,236.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,236.00, +"North Shore Steel Company, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +LABORER,Journey,21.00,0.00,0.00,1.00,0.00,0.00,20.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,0.00,0.00,1.00,0.00,0.00,20.00,0.00,0.00,21.00 +Total for Contractor,Journey,41.00,0.00,0.00,21.00,0.00,0.00,20.00,0.00,, +"",,,,,,,,,,0.00,41.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.00,0.00,0.00,21.00,0.00,0.00,20.00,0.00,0.00,41.00 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,47.00,0.00,8.00,0.00,0.00,0.00,39.00,0.00,0.00,47.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,47.00,0.00,8.00,0.00,0.00,0.00,39.00,0.00,0.00,47.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",47.00,"0.00 8.000.000.000.0039.00","0.000.00 47.00",,,,,,,, +"",,,,,,,,,0.00,47.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,47.00,0.00,8.00,0.00,0.00,0.00,39.00,0.00,0.00,47.00, +Simplex Grinnell LP,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FIRE ALARM INSTALLER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"1.00 0.000.000.000.000.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,,,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,248.75,147.00,0.00,101.75,0.00,0.00,0.00,0.00,0.00,248.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.75,147.00,0.00,101.75,0.00,0.00,0.00,0.00,0.00,248.75 +Total for Contractor,Journey,248.75,147.00,0.00,101.75,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,248.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.75,147.00,0.00,101.75,0.00,0.00,0.00,0.00,0.00,248.75 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00, +Total Journey Hours,"2,313.25","1,996.50",8.00,249.75,0.00,0.00,59.00,0.00,81.50,"2,231.75", +Total Apprentice Hours,238.00,64.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,238.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,551.25","2,060.50",8.00,423.75,0.00,0.00,59.00,0.00,81.50,"2,469.75", +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,403.50,403.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,403.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,403.50,403.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,403.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,495.00,495.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,495.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,495.00,495.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,495.00 +Total for Contractor,Journey,898.50,898.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,898.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,898.50,898.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,898.50 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,0.00,48.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,954.50,954.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,954.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,954.50,954.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,954.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Louis C. Allegrone, Inc.",,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,361.00,201.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,361.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,361.00,201.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,361.00, +LABORER: MASON TENDER,Journey,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00, +Total for Contractor,Journey,469.00,309.00,0.00,160.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,0.00,469.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,469.00,309.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,469.00,, +Total Journey Hours,469.00,309.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,469.00,, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,469.00,309.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,469.00,, diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportDec2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportDec2019.csv new file mode 100644 index 00000000..18c4a004 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportDec2019.csv @@ -0,0 +1,4002 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +ELECTRICIAN,Journey,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"8.00 0.000.000.000.008.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +Total Journey Hours,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +PIPEFITTER & STEAMFITTER,Journey,"1,640.00","1,472.00",168.00,0.00,0.00,0.00,0.00,0.00,8.00,"1,632.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,640.00","1,472.00",168.00,0.00,0.00,0.00,0.00,0.00,8.00,"1,632.00" +Total for Contractor,Journey,"1,640.00","1,472.00",168.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,8.00,"1,632.00" +"",Apprentice,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +"",A/J Ratio,0.10,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.10 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,805.00","1,637.00",168.00,0.00,0.00,0.00,0.00,0.00,8.00,"1,797.00" +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,"2,420.00","1,590.00",376.00,298.00,0.00,0.00,156.00,0.00,154.00,"2,266.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,420.00","1,590.00",376.00,298.00,0.00,0.00,156.00,0.00,154.00,"2,266.00" +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,812.00,812.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,812.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,812.00,812.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,812.00, +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"3,232.00","2,402.00",376.00,298.00,0.00,0.00,156.00,0.00,154.00,"3,078.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,232.00","2,402.00",376.00,298.00,0.00,0.00,156.00,0.00,154.00,"3,078.00" +Fall River Electrical Assoc.,,,,,,,,,,, +ELECTRICIAN,Journey,422.50,353.00,0.00,0.00,0.00,0.00,69.50,0.00,0.00,422.50 +"",Apprentice,187.50,179.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,187.50 +"",A/J Ratio,0.44,0.51,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.00,532.50,0.00,8.00,0.00,0.00,69.50,0.00,0.00,610.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",422.50,"353.00 0.000.000.000.0069.50","0.000.00 422.50",,,,,,,, +"",,,,,,,,,0.00,422.50, +"",Apprentice,187.50,179.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,187.50 +"",A/J Ratio,0.44,0.51,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.00,532.50,0.00,8.00,0.00,0.00,69.50,0.00,0.00,610.00 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,73.00,0.00,0.00,0.00,0.00,0.00,73.00,0.00,0.00,73.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.00,0.00,0.00,0.00,0.00,0.00,73.00,0.00,0.00,73.00 +Total for Contractor,Journey,73.00,0.00,0.00,0.00,0.00,0.00,73.00,0.00,, +"",,,,,,,,0.00,73.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,73.00,0.00,0.00,0.00,0.00,0.00,73.00,0.00,0.00,73.00, +"Marmelo Brothers Construction Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER: MASON TENDER,Journey,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total Journey Hours,"5,391.50","4,243.00",544.00,306.00,0.00,0.00,298.50,0.00,162.00,"5,229.50", +Total Apprentice Hours,352.50,344.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,352.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"5,744.00","4,587.50",544.00,314.00,0.00,0.00,298.50,0.00,162.00,"5,582.00", +"Project Name: BSB1403 HC1 C State House Data Center Relocation Project Code: BSB1403 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Folan Waterproofing & Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +LABORER: MASON TENDER,Journey,40.00,24.00,0.00,8.00,0.00,0.00,8.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,24.00,0.00,8.00,0.00,0.00,8.00,0.00,0.00,40.00 +Total for Contractor,Journey,80.00,64.00,0.00,8.00,0.00,0.00,8.00,0.00,, +"",,,,,,,,,,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,64.00,0.00,8.00,0.00,0.00,8.00,0.00,0.00,80.00 +LeVangie Electric Co. Inc.,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,144.00,0.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,288.00,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.00,"0.00 144.000.000.000.000.00","0.000.00 144.00",,,,,,,, +"",,,,,,,,,0.00,144.00, +Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,288.00,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00, +N B Kenney Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSB1403 HC1 C State House Data Center Relocation Project Code: BSB1403 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +PIPEFITTER & STEAMFITTER,Journey,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00 +Total for Contractor,Journey,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,172.00, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,196.00,196.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,196.00, +Total Journey Hours,396.00,236.00,144.00,8.00,0.00,0.00,8.00,0.00,0.00,396.00, +Total Apprentice Hours,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,564.00,404.00,144.00,8.00,0.00,0.00,8.00,0.00,0.00,564.00, +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Lawrence Lynch Corp,,,,,,,,,,, +DRIVER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +EQUIPMENT OPERATOR (Class B CDL),Journey,325.00,302.00,23.00,0.00,0.00,0.00,0.00,0.00,143.00,182.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,325.00,302.00,23.00,0.00,0.00,0.00,0.00,0.00,143.00,182.00 +LABORER,Journey,705.00,666.50,14.50,0.00,0.00,0.00,24.00,0.00,0.00,705.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,705.00,666.50,14.50,0.00,0.00,0.00,24.00,0.00,0.00,705.00 +Total for Contractor,Journey,"1,039.00",977.50,37.50,0.00,0.00,0.00,24.00,0.00,, +"",,,,,,,,,,143.00,896.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,039.00",977.50,37.50,0.00,0.00,0.00,24.00,0.00,143.00,896.00 +"Sullivan & McLaughlin Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,382.00,382.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,382.00 +Apprentice,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00, +A/J Ratio,0.45,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,554.00,554.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.00, +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,382.00,382.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,382.00 +Apprentice,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00, +A/J Ratio,0.45,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,554.00,554.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.00, +Total Journey Hours,"1,421.00","1,359.50",37.50,0.00,0.00,0.00,24.00,0.00,143.00,"1,278.00", +Total Apprentice Hours,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,593.00","1,531.50",37.50,0.00,0.00,0.00,24.00,0.00,143.00,"1,450.00", +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,102.00,102.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,102.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",102.00,"102.00 0.000.000.000.000.00","0.000.00 102.00",,,,,,,, +"",,,,,,,,,,0.00,102.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,102.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +"",Apprentice,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +Total for Contractor,Journey,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,55.50 +"",Apprentice,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +B&B Lightning Protection,,,,,,,,,,, +ELECTRICIAN,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Capeway Roofing Systems, Inc.",,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,"1,222.50","1,062.50",160.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,222.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,222.50","1,062.50",160.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,222.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,327.00","1,167.00 160.000.000.000.000.00","0.000.00 1,327.00",,,,,,,, +"",,,,,,,,,,0.00,"1,327.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,327.00","1,167.00",160.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,327.00" +"Colantonio, Inc.",,,,,,,,,,, +CARPENTER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,85.50,85.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,85.50,85.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.50 +LABORER,Journey,35.00,8.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,35.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.23,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,43.00,16.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,43.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,216.50,189.50,0.00,27.00,0.00,0.00,0.00,0.00,0.00,216.50 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.04,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.50,197.50,0.00,27.00,0.00,0.00,0.00,0.00,0.00,224.50 +"E. Amanti & Sons, Inc",,,,,,,,,,, +LABORER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +PIPEFITTER & STEAMFITTER,Journey,62.50,0.00,0.00,62.50,0.00,0.00,0.00,0.00,0.00,62.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.50,0.00,0.00,62.50,0.00,0.00,0.00,0.00,0.00,62.50 +SHEETMETAL WORKER,Journey,126.50,126.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,126.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,126.50,126.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,126.50, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,253.00,190.50,0.00,62.50,0.00,0.00,0.00,0.00,0.00,253.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.13,0.17,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,285.00,222.50,0.00,62.50,0.00,0.00,0.00,0.00,0.00,285.00 +"Marmelo Brothers Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.00 +LABORER: MASON TENDER,Journey,88.00,0.00,80.00,8.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,80.00,8.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,282.00,194.00,80.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,282.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,282.00,194.00,80.00,8.00,0.00,0.00,0.00,0.00,0.00,282.00 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,64.00,8.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00, +A/J Ratio,0.63,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,48.00,0.00,56.00,0.00,0.00,0.00,0.00,40.00,64.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,64.00,8.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00, +A/J Ratio,0.63,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,48.00,0.00,56.00,0.00,0.00,0.00,0.00,40.00,64.00, +Total Journey Hours,"2,318.00","1,924.50",240.00,153.50,0.00,0.00,0.00,0.00,0.00,"2,318.00", +Total Apprentice Hours,135.50,135.50,0.00,0.00,0.00,0.00,0.00,0.00,40.00,95.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,453.50","2,060.00",240.00,153.50,0.00,0.00,0.00,0.00,40.00,"2,413.50", +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"J.L. Marshall and Sons, Inc.",,,,,,,,,,,, +CARPENTER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +EQUIPMENT OPERATOR (Class A CDL),Journey,35.50,35.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,35.50,35.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.50, +LABORER,Journey,111.50,103.00,8.50,0.00,0.00,0.00,0.00,0.00,0.00,111.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,111.50,103.00,8.50,0.00,0.00,0.00,0.00,0.00,0.00,111.50, +Total for Contractor,Journey,205.00,196.50,8.50,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,205.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,205.00,196.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,205.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,446.50,283.50,163.00,0.00,0.00,0.00,0.00,0.00,0.00,446.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,446.50,283.50,163.00,0.00,0.00,0.00,0.00,0.00,0.00,446.50,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +LABORER,Journey,756.50,756.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,756.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,756.50,756.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,756.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,203.00","1,040.00 163.000.000.000.000.00","0.000.00 1,203.00",,,,,,,,, +"",,,,,,,,,0.00,"1,203.00",, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,203.00","1,040.00",163.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,203.00", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total for Contractor,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,0.00,5.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00,, +Total Journey Hours,"1,413.00","1,241.50",171.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,413.00",, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,"1,413.00","1,241.50",171.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,413.00",, +"0.000.00 1,203.00", +0.00,"1,203.00" +"Project Name: DCP1842E EC1 C McCormack BuildingEnergy/Lighting Upgrade Project Code: DCP1842E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Power Secure Inc.,,,,,,,,,,, +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J & S Concrete Pumping and Grouting, Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,314.00,282.00,0.00,0.00,0.00,0.00,32.00,0.00,0.00,314.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,314.00,282.00,0.00,0.00,0.00,0.00,32.00,0.00,0.00,314.00 +LABORER,Journey,28.00,11.00,0.00,0.00,0.00,0.00,17.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,11.00,0.00,0.00,0.00,0.00,17.00,0.00,0.00,28.00, +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"PAINTER / TAPER (BRUSH,REPAINT)",Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,370.00,321.00,0.00,0.00,0.00,0.00,49.00,0.00,, +"",,,,,,,,,0.00,370.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,370.00,321.00,0.00,0.00,0.00,0.00,49.00,0.00,0.00,370.00, +Total Journey Hours,426.00,377.00,0.00,0.00,0.00,0.00,49.00,0.00,0.00,426.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,426.00,377.00,0.00,0.00,0.00,0.00,49.00,0.00,0.00,426.00, +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Harold Brothers Mechanical Contractors, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +McCarthy Restoration,,,,,,,,,,, +CARPENTER,Journey,75.50,53.50,0.00,0.00,0.00,0.00,22.00,0.00,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,53.50,0.00,0.00,0.00,0.00,22.00,0.00,0.00,75.50 +Total for Contractor,Journey,75.50,53.50,0.00,0.00,0.00,0.00,22.00,0.00,, +"",,,,,,,,,,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,53.50,0.00,0.00,0.00,0.00,22.00,0.00,0.00,75.50 +N B Kenney Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00 +PLUMBERS & GASFITTERS,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +Total for Contractor,Journey,351.00,351.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,351.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,351.00,351.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,351.00, +Total Journey Hours,450.50,428.50,0.00,0.00,0.00,0.00,22.00,0.00,0.00,450.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,450.50,428.50,0.00,0.00,0.00,0.00,22.00,0.00,0.00,450.50, +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,7.00,0.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +A/J Ratio,0.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.57, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,4.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"0.00 0.000.007.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,0.00,7.00,, +Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +A/J Ratio,0.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.57, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,4.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,11.00, +Total Journey Hours,7.00,0.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,7.00, +Total Apprentice Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,11.00,4.00,0.00,0.00,7.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Ambient Temperature Corp.,,,,,,,,,,, +HVAC MECHANIC,Journey,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PLUMBERS & GASFITTERS,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,268.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.06,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.06 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,284.00,284.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,284.00 +American Sheetmetal,,,,,,,,,,, +SHEETMETAL WORKER,Journey,97.00,89.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,97.00 +Apprentice,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00, +A/J Ratio,0.67,0.73,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,162.00,154.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,162.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,97.00,89.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,97.00 +"",Apprentice,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00 +"",A/J Ratio,0.67,0.73,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,154.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,162.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Charles Services & Equipment,,,,,,,,,,, +CARPENTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +LABORER,Journey,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,253.00,253.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,253.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,253.00,253.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,253.00 +Connectivity Point Design & Installation,,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,63.00,50.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,63.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,63.00,50.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,63.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",63.00,"50.00 13.000.000.000.000.00","0.000.00 63.00",,,,,,,, +"",,,,,,,,,0.00,63.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,63.00,50.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,63.00 +"Greenwood Industries, Inc",,,,,,,,,,, +SHEETMETAL WORKER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,2.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"J.C. Cannistraro, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,397.00,308.00,89.00,0.00,0.00,0.00,0.00,0.00,0.00,397.00 +"",Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",A/J Ratio,0.04,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,411.00,322.00,89.00,0.00,0.00,0.00,0.00,0.00,0.00,411.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",397.00,"308.00 89.000.000.000.000.00","0.000.00 397.00",,,,,,,, +"",,,,,,,,,,0.00,397.00 +"",Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",A/J Ratio,0.04,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,411.00,322.00,89.00,0.00,0.00,0.00,0.00,0.00,0.00,411.00 +Jackson Glass Inc.,,,,,,,,,,, +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,156.00,120.00,0.00,36.00,0.00,0.00,0.00,0.00,28.00,128.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,156.00,120.00,0.00,36.00,0.00,0.00,0.00,0.00,28.00,128.00 +Total for Contractor,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,0.00 +"",Apprentice,156.00,120.00,0.00,36.00,0.00,0.00,0.00,0.00,28.00,128.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,156.00,120.00,0.00,36.00,0.00,0.00,0.00,0.00,28.00,128.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,385.50,279.50,0.00,106.00,0.00,0.00,0.00,0.00,0.00,385.50 +Apprentice,237.50,128.50,0.00,0.00,109.00,0.00,0.00,0.00,0.00,237.50, +A/J Ratio,0.62,0.46,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.62, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,623.00,408.00,0.00,106.00,109.00,0.00,0.00,0.00,0.00,623.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,385.50,279.50,0.00,106.00,0.00,0.00,0.00,0.00,0.00,385.50 +"",Apprentice,237.50,128.50,0.00,0.00,109.00,0.00,0.00,0.00,0.00,237.50 +"",A/J Ratio,0.62,0.46,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.62 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,623.00,408.00,0.00,106.00,109.00,0.00,0.00,0.00,0.00,623.00 +"Lemelin Environmental Services, Inc.",,,,,,,,,,, +LABORER,Journey,44.75,32.50,0.00,0.00,0.00,0.00,12.25,0.00,0.00,44.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.75,32.50,0.00,0.00,0.00,0.00,12.25,0.00,0.00,44.75 +PLUMBERS & GASFITTERS,Journey,18.75,18.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.75,18.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.75 +Total for Contractor,Journey,63.50,51.25,0.00,0.00,0.00,0.00,12.25,0.00,, +"",,,,,,,,,,0.00,63.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,63.50,51.25,0.00,0.00,0.00,0.00,12.25,0.00,0.00,63.50 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,56.00,40.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,40.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,73.00,57.00,16.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,73.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.00,57.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +"Manganaro Northeast, LLC",,,,,,,,,,, +CARPENTER,Journey,398.00,398.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,398.00 +"",Apprentice,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",A/J Ratio,0.42,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.42 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,566.00,566.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,566.00 +LABORER,Journey,44.00,15.00,0.00,24.00,0.00,5.00,0.00,0.00,0.00,44.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.00,15.00,0.00,24.00,0.00,5.00,0.00,0.00,0.00,44.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,442.00,413.00,0.00,24.00,0.00,5.00,0.00,0.00,0.00,442.00 +"",Apprentice,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",A/J Ratio,0.38,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.00,581.00,0.00,24.00,0.00,5.00,0.00,0.00,0.00,610.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +IRONWORKER/WELDER,Journey,16.00,0.00,0.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 0.008.008.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00 +Taibbi Equipment Corp.,,,,,,,,,,, +DRIVER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +VAC-HAUL,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"Thermo-Dynamics International, Inc.",,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +INSULATOR (PIPES & TANKS),Journey,70.00,0.00,0.00,70.00,0.00,0.00,0.00,0.00,0.00,70.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,70.00,0.00,0.00,70.00,0.00,0.00,0.00,0.00,0.00,70.00 +Total for Contractor,Journey,70.00,0.00,0.00,70.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,70.00 +"",Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",A/J Ratio,0.69,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,118.00,48.00,0.00,70.00,0.00,0.00,0.00,0.00,0.00,118.00 +Tri State Building LLC,,,,,,,,,,, +IRONWORKER/WELDER,Journey,424.00,264.00,0.00,0.00,0.00,0.00,160.00,0.00,37.00,387.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,424.00,264.00,0.00,0.00,0.00,0.00,160.00,0.00,37.00,387.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,424.00,264.00,0.00,0.00,0.00,0.00,160.00,0.00,37.00,387.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,424.00,264.00,0.00,0.00,0.00,0.00,160.00,0.00,37.00,387.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +LABORER,Journey,355.00,339.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,355.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,355.00,339.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,355.00 +Total for Contractor,Journey,475.00,459.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,475.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,475.00,459.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,475.00 +William M. Collins company Inc.,,,,,,,,,,, +SPRINKLER FITTER,Journey,564.00,452.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,564.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,564.00,452.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,564.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,564.00,452.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,564.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,564.00,452.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,564.00, +Total Journey Hours,"3,627.00","2,979.75",230.00,232.00,8.00,5.00,172.25,0.00,37.00,"3,590.00", +Total Apprentice Hours,704.50,559.50,0.00,36.00,109.00,0.00,0.00,0.00,28.00,676.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"4,331.50","3,539.25",230.00,268.00,117.00,5.00,172.25,0.00,65.00,"4,266.50", +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,494.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,494.00 +Total for Contractor,Journey,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,494.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,494.00 +Thyssenkrupp Elevator Corp.,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +Total Journey Hours,504.00,504.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,504.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,504.00,504.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,504.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,213.00,213.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,213.00 +"",Apprentice,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00,0.00 +"",A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,285.00,213.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00,213.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",213.00,"213.00 0.000.000.000.000.00","0.000.00 213.00",,,,,,,, +"",,,,,,,,,,0.00,213.00 +"",Apprentice,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00,0.00 +"",A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,285.00,213.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00,213.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,154.00,154.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.00 +"",Apprentice,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",A/J Ratio,0.90,0.90,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.90 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00 +Total for Contractor,Journey,154.00,154.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,154.00 +"",Apprentice,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",A/J Ratio,0.90,0.90,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.90 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00 +Atlantic Contracting & Specialties,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"Aucoin Telecom & Utilities, LLC",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Boston Flooring & Contracting Inc.,,,,,,,,,,, +LABORER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,96.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Complete Labor and Staffing LLC,,,,,,,,,,, +LABORER,Journey,26.00,9.00,0.00,17.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,9.00,0.00,17.00,0.00,0.00,0.00,0.00,0.00,26.00 +Total for Contractor,Journey,26.00,9.00,0.00,17.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,9.00,0.00,17.00,0.00,0.00,0.00,0.00,0.00,26.00 +East Coast Fire & Ventilation,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,92.00,56.50,0.00,0.00,0.00,0.00,35.50,0.00,0.00,92.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,92.00,56.50,0.00,0.00,0.00,0.00,35.50,0.00,0.00,92.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",124.00,"88.50 0.000.000.000.0035.50","0.000.00 124.00",,,,,,,, +"",,,,,,,,,,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,88.50,0.00,0.00,0.00,0.00,35.50,0.00,0.00,124.00 +Hartin Welding,,,,,,,,,,, +IRONWORKER/WELDER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Total for Contractor,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"K & K Acoustical Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,340.00,340.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,340.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,340.00,340.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,340.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",340.00,"340.00 0.000.000.000.000.00","0.000.00 340.00",,,,,,,, +"",,,,,,,,,,0.00,340.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,340.00,340.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,340.00 +Kittredge Equipment Company,,,,,,,,,,, +LABORER,Journey,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,7.00,9.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,7.00,9.50 +SHEETMETAL WORKER,Journey,67.50,67.50,0.00,0.00,0.00,0.00,0.00,0.00,26.50,41.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,67.50,67.50,0.00,0.00,0.00,0.00,0.00,0.00,26.50,41.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,33.50,50.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,33.50,50.50 +Modern Manufacturing Inc. of Worcester,,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,20.25,20.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.25,20.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.25,"20.25 0.000.000.000.000.00","0.000.00 20.25",,,,,,,, +"",,,,,,,,,,0.00,20.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.25,20.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.25 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.50 +DRIVER,Journey,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",151.00,"151.00 0.000.000.000.000.00","0.000.00 151.00",,,,,,,, +"",,,,,,,,,,0.00,151.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,151.00,151.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +Total for Contractor,Journey,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,30.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +"TC Controls & Services, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,131.50,131.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,131.50,131.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,131.50,131.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,131.50,131.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.50 +"William F. Lynch Co., Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,56.00,0.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,0.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,56.00 +SHEETMETAL WORKER,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +Total for Contractor,Journey,123.00,67.00,0.00,0.00,0.00,0.00,56.00,0.00,, +"",,,,,,,,0.00,123.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,123.00,67.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,123.00, +Total Journey Hours,"1,890.25","1,781.75",0.00,17.00,0.00,0.00,91.50,0.00,33.50,"1,856.75", +Total Apprentice Hours,210.00,138.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00,138.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,100.25","1,919.75",72.00,17.00,0.00,0.00,91.50,0.00,105.50,"1,994.75", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Commercial Air Control, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,374.50,185.00,189.50,0.00,0.00,0.00,0.00,0.00,131.50,243.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,374.50,185.00,189.50,0.00,0.00,0.00,0.00,0.00,131.50,243.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",374.50,"185.00 189.500.000.000.000.00","0.00131.50 243.00",,,,,,,, +"",,,,,,,,,,131.50,243.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,374.50,185.00,189.50,0.00,0.00,0.00,0.00,0.00,131.50,243.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +Total for Contractor,Journey,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,73.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +Manny's Plumbing & Heating Inc.,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00, +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.008.00 16.00",,,,,,,, +"",,,,,,,,,,8.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,16.00 +Renewable Energy Systems - RES,,,,,,,,,,, +LABORER,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Total for Contractor,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,27.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +PIPEFITTER & STEAMFITTER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",150.00,"150.00 0.000.000.000.000.00","0.000.00 150.00",,,,,,,, +"",,,,,,,,,0.00,150.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"Village Forge, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,44.50,33.25,11.25,0.00,0.00,0.00,0.00,0.00,0.00,44.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.50,33.25,11.25,0.00,0.00,0.00,0.00,0.00,0.00,44.50 +Total for Contractor,Journey,44.50,33.25,11.25,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,44.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.50,33.25,11.25,0.00,0.00,0.00,0.00,0.00,0.00,44.50, +Total Journey Hours,693.00,492.25,200.75,0.00,0.00,0.00,0.00,0.00,139.50,553.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,693.00,492.25,200.75,0.00,0.00,0.00,0.00,0.00,139.50,553.50, +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,0.00,3.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total Journey Hours,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1901 FC1 C Lemuel Shattuck Hospital- Anti-Ligature Upgrades Project Code: DPH1901 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",76.00,"76.00 0.000.000.000.000.00","0.000.00 76.00",,,,,,,, +"",,,,,,,,,,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +NG Environmental Contractors Inc,,,,,,,,,,, +"ASBESTOS REMOVER - PIPE / MECH. EQUIPT",Journey,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00, +"Project Name: DPH1901 FC1 C Lemuel Shattuck Hospital- Anti-Ligature Upgrades Project Code: DPH1901 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00, +Total Journey Hours,146.00,92.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,146.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,146.00,92.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,146.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Baystate Contracting Services, Inc.",,,,,,,,,,, +DEMO: WRECKING LABORER,Journey,9.50,0.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,9.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.50,0.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,9.50 +"LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER",Journey,218.50,24.00,149.50,45.00,0.00,0.00,0.00,0.00,0.00,218.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,218.50,24.00,149.50,45.00,0.00,0.00,0.00,0.00,0.00,218.50 +Total for Contractor,Journey,228.00,24.00,149.50,54.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,228.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.00,24.00,149.50,54.50,0.00,0.00,0.00,0.00,0.00,228.00 +"Lizotte Glass, Inc.",,,,,,,,,,, +GLAZIER,Journey,171.00,17.75,0.00,153.25,0.00,0.00,0.00,0.00,0.00,171.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,171.00,17.75,0.00,153.25,0.00,0.00,0.00,0.00,0.00,171.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,246.25,0.00,0.00,246.25,0.00,0.00,0.00,0.00,0.00,246.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,246.25,0.00,0.00,246.25,0.00,0.00,0.00,0.00,0.00,246.25, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,417.25,17.75,0.00,399.50,0.00,0.00,0.00,0.00,0.00,417.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,417.25,17.75,0.00,399.50,0.00,0.00,0.00,0.00,0.00,417.25 +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER: MASON TENDER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,64.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +Total Journey Hours,709.25,105.75,149.50,454.00,0.00,0.00,0.00,0.00,0.00,709.25, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,709.25,105.75,149.50,454.00,0.00,0.00,0.00,0.00,0.00,709.25, +"Project Name: DYS1901 HC1 C Goss Building-Immediate A/C-Taunton State Hospital Project Code: DYS1901 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"General Air Conditioning & Heating, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,28.00,0.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,0.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +LABORER: MULTI-TRADE TENDER,Journey,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,68.00,0.00,68.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,68.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.00,0.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +Metro Equipment Corp,,,,,,,,,,, +LABORER,Journey,155.00,75.00,40.00,40.00,0.00,0.00,0.00,0.00,0.00,155.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,155.00,75.00,40.00,40.00,0.00,0.00,0.00,0.00,0.00,155.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",155.00,"75.00 40.0040.000.000.000.00","0.000.00 155.00",,,,,,,, +"",,,,,,,,,0.00,155.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,155.00,75.00,40.00,40.00,0.00,0.00,0.00,0.00,0.00,155.00, +"Systems Contracting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1901 HC1 C Goss Building-Immediate A/C-Taunton State Hospital Project Code: DYS1901 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,231.00,83.00,108.00,40.00,0.00,0.00,0.00,0.00,0.00,231.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,231.00,83.00,108.00,40.00,0.00,0.00,0.00,0.00,0.00,231.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Banner Environmental Inc.,,,,,,,,,,, +"ASBESTOS REMOVER - PIPE / MECH. EQUIPT",Journey,127.00,118.00,0.00,9.00,0.00,0.00,0.00,0.00,39.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,127.00,118.00,0.00,9.00,0.00,0.00,0.00,0.00,39.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",127.00,"118.00 0.009.000.000.000.00","0.0039.00 88.00",,,,,,,, +"",,,,,,,,,,39.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,127.00,118.00,0.00,9.00,0.00,0.00,0.00,0.00,39.00,88.00 +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +LABORER,Journey,173.00,90.50,0.00,82.50,0.00,0.00,0.00,0.00,0.00,173.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,173.00,90.50,0.00,82.50,0.00,0.00,0.00,0.00,0.00,173.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",213.00,"130.50 0.0082.500.000.000.00","0.000.00 213.00",,,,,,,, +"",,,,,,,,,0.00,213.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,213.00,130.50,0.00,82.50,0.00,0.00,0.00,0.00,0.00,213.00, +Dagle Electrical Construction Corp.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,173.00,173.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,173.00 +"",Apprentice,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +"",A/J Ratio,0.35,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,234.00,234.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.00 +EQUIPMENT OPERATOR (Class B CDL),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,181.00 +"",Apprentice,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +"",A/J Ratio,0.34,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,242.00,242.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,242.00 +"Evermore Light & Power, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,320.00,320.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,320.00 +Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00,64.00, +A/J Ratio,0.48,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00,384.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",320.00,"320.00 0.000.000.000.000.00","0.000.00 320.00",,,,,,,, +"",,,,,,,,,0.00,320.00, +Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00,64.00, +A/J Ratio,0.48,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00,384.00, +"Fraser Engineering Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +PIPEFITTER & STEAMFITTER,Journey,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +PLUMBERS & GASFITTERS,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00 +Total for Contractor,Journey,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,127.00 +"",Apprentice,287.00,287.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,287.00 +"",A/J Ratio,2.26,2.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,414.00,414.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,414.00 +IKE Electric Inc,,,,,,,,,,, +ELECTRICIAN,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +Apprentice,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,144.00,104.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,144.00, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,104.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,144.00 +"Noyes Sheet Metal, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,41.00,25.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,41.00 +"",Apprentice,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +"",A/J Ratio,1.27,2.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,77.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,93.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",41.00,"25.00 0.000.000.000.0016.00","0.000.00 41.00",,,,,,,, +"",,,,,,,,,0.00,41.00, +"",Apprentice,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +"",A/J Ratio,1.27,2.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,77.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,93.00 +O.B. Hill Trucking & Rigging Co Inc.,,,,,,,,,,, +DRIVER,Journey,112.00,56.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,56.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,112.00 +Total for Contractor,Journey,112.00,56.00,0.00,0.00,0.00,0.00,56.00,0.00,, +"",,,,,,,,0.00,112.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,56.00,0.00,0.00,0.00,0.00,56.00,0.00,0.00,112.00, +"SSE Enterprise, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Total for Contractor,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,11.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +Total Journey Hours,"1,236.00","1,072.50",0.00,91.50,0.00,0.00,72.00,0.00,39.00,"1,197.00", +Total Apprentice Hours,592.00,552.00,0.00,40.00,0.00,0.00,0.00,0.00,88.00,504.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,828.00","1,624.50",0.00,131.50,0.00,0.00,72.00,0.00,127.00,"1,701.00", +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00 +Apprentice,34.00,0.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,34.00, +A/J Ratio,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,54.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",54.00,"54.00 0.000.000.000.000.00","0.000.00 54.00",,,,,,,, +"",,,,,,,,0.00,54.00,, +Apprentice,34.00,0.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,34.00, +A/J Ratio,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,54.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,88.00, +Total Journey Hours,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00, +Total Apprentice Hours,34.00,0.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,88.00,54.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Adams & Ruxton Construction Company,,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.00,"80.00 0.000.000.000.000.00","0.000.00 80.00",,,,,,,, +"",,,,,,,,,,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +BG Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,20.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00 +PLUMBERS & GASFITTERS,Journey,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,250.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,250.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",270.00,"250.00 20.000.000.000.000.00","0.0020.00 250.00",,,,,,,, +"",,,,,,,,,20.00,250.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,270.00,250.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00,250.00, +"Chicopee Industrial Contractors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER / GROUNDMAN CDL,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +FORK LIFT/CHERRY PICKER,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +Total for Contractor,Journey,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,37.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,631.00,575.00,56.00,0.00,0.00,0.00,0.00,0.00,136.00,495.00 +Apprentice,240.00,88.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +A/J Ratio,0.38,0.15,2.71,0.00,0.00,0.00,0.00,0.00,0.00,0.48, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,871.00,663.00,208.00,0.00,0.00,0.00,0.00,0.00,136.00,735.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",631.00,"575.00 56.000.000.000.000.00","0.00136.00 495.00",,,,,,,, +"",,,,,,,,,136.00,495.00, +Apprentice,240.00,88.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +A/J Ratio,0.38,0.15,2.71,0.00,0.00,0.00,0.00,0.00,0.00,0.48, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,871.00,663.00,208.00,0.00,0.00,0.00,0.00,0.00,136.00,735.00, +"Manafort-Precision, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,119.00,119.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,119.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,119.00,119.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,119.00 +CEMENT MASONRY/PLASTERING,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +IRONWORKER/WELDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,163.00,147.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00,147.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,163.00,147.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00,147.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",330.00,"314.00 8.008.000.000.000.00","0.0016.00 314.00",,,,,,,, +"",,,,,,,,,16.00,314.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,330.00,314.00,8.00,8.00,0.00,0.00,0.00,0.00,16.00,314.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"32.00 0.008.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,32.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,"1,388.00","1,288.00",84.00,16.00,0.00,0.00,0.00,0.00,172.00,"1,216.00", +Total Apprentice Hours,240.00,88.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,628.00","1,376.00",236.00,16.00,0.00,0.00,0.00,0.00,172.00,"1,456.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,177.00,171.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,177.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,177.00,171.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,177.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",177.00,"171.00 0.000.006.000.000.00","0.000.00 177.00",,,,,,,, +"",,,,,,,,0.00,177.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,177.00,171.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,177.00, +Total Journey Hours,177.00,171.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,177.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,177.00,171.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,177.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM2004 C MITC MP Equipment Preventive Maintenance Contract Project Code: IFM2004 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N B Kenney Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +PLUMBERS & GASFITTERS,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,33.00,, +Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +A/J Ratio,0.15,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +Total Journey Hours,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00, +Total Apprentice Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +"",Journey,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +ELEVATOR CONSTRUCTOR,A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"",Journey,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total for Contractor,A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"",Total Journey Hours,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"",Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Grand Total Hours,405.00,403.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,405.00 +"Project Name: MCA1501E EC1- Campus Wide-Energy/Water Retrofit Project Code: MCA1501E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Automated Logic Contracting Services,,,,,,,,,,, +HVAC MECHANIC,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,478.00,478.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,478.00 +"",Apprentice,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,32.00 +"",A/J Ratio,0.12,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.07 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,534.00,510.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,510.00 +Total for Contractor,Journey,478.00,478.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,478.00 +"",Apprentice,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,32.00 +"",A/J Ratio,0.12,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.07 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,534.00,510.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,510.00 +"Outkast Electrical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,64.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +A/J Ratio,0.89,0.00,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.89, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Project Name: MCA1501E EC1- Campus Wide-Energy/Water Retrofit Project Code: MCA1501E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,64.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +A/J Ratio,0.89,0.00,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.89, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +Total Journey Hours,558.00,486.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,558.00, +Total Apprentice Hours,120.00,32.00,88.00,0.00,0.00,0.00,0.00,0.00,24.00,96.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,678.00,518.00,160.00,0.00,0.00,0.00,0.00,0.00,24.00,654.00, +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Bond Brothers, Inc.",,,,,,,,,,, +CARPENTER,Journey,539.00,539.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,539.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,539.00,539.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,539.00 +LABORER,Journey,715.00,493.50,212.50,9.00,0.00,0.00,0.00,0.00,4.00,711.00 +"",Apprentice,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00,0.00 +"",A/J Ratio,0.28,0.40,0.00,0.00,0.00,0.00,0.00,0.00,49.25,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,912.00,690.50,212.50,9.00,0.00,0.00,0.00,0.00,201.00,711.00 +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,460.50,460.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,460.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.50,460.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,460.50 +Total for Contractor,Journey,"1,714.50","1,493.00",212.50,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,4.00,"1,710.50" +"",Apprentice,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00,0.00 +"",A/J Ratio,0.11,0.13,0.00,0.00,0.00,0.00,0.00,0.00,49.25,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,911.50","1,690.00",212.50,9.00,0.00,0.00,0.00,0.00,201.00,"1,710.50" +"Glynn Electric, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,76.00 +Apprentice,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50, +A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,116.50,116.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,108.50, +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,76.00 +Apprentice,32.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.50, +A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,116.50,116.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,108.50, +Total Journey Hours,"1,798.50","1,577.00",212.50,9.00,0.00,0.00,0.00,0.00,12.00,"1,786.50", +Total Apprentice Hours,229.50,229.50,0.00,0.00,0.00,0.00,0.00,0.00,197.00,32.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,028.00","1,806.50",212.50,9.00,0.00,0.00,0.00,0.00,209.00,"1,819.00", +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ENERGY INSULATION CONSERVATION, INC.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"64.00 0.008.000.000.000.00","0.000.00 72.00",,,,,,,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +CEMENT MASONRY/PLASTERING,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,41.00,8.00,0.00,8.00,25.00,0.00,0.00,0.00,0.00,41.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.00,8.00,0.00,8.00,25.00,0.00,0.00,0.00,0.00,41.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,144.00,111.00,0.00,8.00,25.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,111.00,0.00,8.00,25.00,0.00,0.00,0.00,0.00,144.00 +N B Kenney Company,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +PIPEFITTER & STEAMFITTER,Journey,336.00,336.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,336.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,336.00,336.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,336.00 +Total for Contractor,Journey,336.00,336.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,336.00 +"",Apprentice,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,504.00,504.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,504.00 +Ostrow Electric Company,,,,,,,,,,, +ELECTRICIAN,Journey,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,40.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,728.00,551.00,0.00,152.00,25.00,0.00,0.00,0.00,0.00,728.00, +Total Apprentice Hours,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,896.00,719.00,0.00,152.00,25.00,0.00,0.00,0.00,0.00,896.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +DRIVER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +LABORER,Journey,304.00,292.00,0.00,12.00,0.00,0.00,0.00,0.00,12.00,292.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,292.00,0.00,12.00,0.00,0.00,0.00,0.00,12.00,292.00 +Total for Contractor,Journey,473.00,461.00,0.00,12.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,12.00,461.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,473.00,461.00,0.00,12.00,0.00,0.00,0.00,0.00,12.00,461.00 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,91.00,11.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,91.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,91.00,11.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,91.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,91.00,11.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,91.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,91.00,11.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,91.00 +McDonald Electric Corporation,,,,,,,,,,, +ELECTRICIAN,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",Apprentice,68.00,0.00,8.00,0.00,60.00,0.00,0.00,0.00,0.00,68.00 +"",A/J Ratio,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,176.00,8.00,0.00,60.00,0.00,0.00,0.00,0.00,244.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"176.00 0.000.000.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,,,0.00,176.00 +"",Apprentice,68.00,0.00,8.00,0.00,60.00,0.00,0.00,0.00,0.00,68.00 +"",A/J Ratio,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,176.00,8.00,0.00,60.00,0.00,0.00,0.00,0.00,244.00 +"Rustic Fire Protection, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Total for Contractor,Journey,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,56.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,796.00,680.00,24.00,92.00,0.00,0.00,0.00,0.00,12.00,784.00 +Total Apprentice Hours,68.00,0.00,8.00,0.00,60.00,0.00,0.00,0.00,0.00,68.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,864.00,680.00,32.00,92.00,60.00,0.00,0.00,0.00,12.00,852.00 +"Project Name: POL1303 DC1 CM State Police Lower Basin Barracks Modernization and Expansion Project Code: POL1303 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +LABORER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +Total for Contractor,Journey,238.00,238.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,238.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,238.00,238.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,238.00 +New Quality Fence Corp,,,,,,,,,,, +FENCE & GUARD RAIL ERECTOR,Journey,32.00,16.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,16.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"16.00 0.000.000.000.0016.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,0.00,32.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,16.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,32.00, +"Soini Erosion Control, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: POL1303 DC1 CM State Police Lower Basin Barracks Modernization and Expansion Project Code: POL1303 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,0.00,12.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,282.00,266.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,282.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,282.00,266.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,282.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +HVAC (DUCTWORK),Journey,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",161.00,"161.00 0.000.000.000.000.00","0.000.00 161.00",,,,,,,, +"",,,,,,,,,,0.00,161.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",184.00,"184.00 0.000.000.000.000.00","0.000.00 184.00",,,,,,,, +"",,,,,,,,,0.00,184.00, +"",Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",A/J Ratio,0.61,0.61,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.61 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +L&L Contracting,,,,,,,,,,, +IRONWORKER/WELDER,Journey,195.50,0.00,0.00,104.00,0.00,0.00,91.50,0.00,0.00,195.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,195.50,0.00,0.00,104.00,0.00,0.00,91.50,0.00,0.00,195.50 +LABORER,Journey,111.00,0.00,0.00,107.00,0.00,0.00,4.00,0.00,0.00,111.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,0.00,0.00,107.00,0.00,0.00,4.00,0.00,0.00,111.00 +LABORER: CARPENTER TENDER,Journey,38.00,0.00,0.00,0.00,0.00,0.00,38.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,0.00,0.00,0.00,0.00,0.00,38.00,0.00,0.00,38.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,10.00,0.00,0.00,0.00,0.00,0.00,10.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,0.00,0.00,0.00,0.00,0.00,10.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,354.50,0.00,0.00,211.00,0.00,0.00,143.50,0.00,0.00,354.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,354.50,0.00,0.00,211.00,0.00,0.00,143.50,0.00,0.00,354.50 +Ostrow Electric Company,,,,,,,,,,, +ELECTRICIAN,Journey,203.00,203.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,203.00 +"",Apprentice,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,291.00,291.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",203.00,"203.00 0.000.000.000.000.00","0.000.00 203.00",,,,,,,, +"",,,,,,,,,0.00,203.00, +"",Apprentice,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,291.00,291.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Time Savers Construction Services,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,41.32,9.63,0.00,31.69,0.00,0.00,0.00,0.00,31.69,9.63 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.32,9.63,0.00,31.69,0.00,0.00,0.00,0.00,31.69,9.63, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",41.32,"9.63 0.0031.690.000.000.00","0.0031.69 9.63",,,,,,,, +"",,,,,,,,,31.69,9.63, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.32,9.63,0.00,31.69,0.00,0.00,0.00,0.00,31.69,9.63, +Total Journey Hours,959.82,573.63,0.00,242.69,0.00,0.00,143.50,0.00,31.69,928.13, +Total Apprentice Hours,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,159.82",773.63,0.00,242.69,0.00,0.00,143.50,0.00,31.69,"1,128.13", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDN1501E EC1 C Comprehensive Energy and Water Upgrades Project Code: SDN1501E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +LABORER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,10.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Journey Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +SHEETMETAL WORKER,Journey,82.00,0.00,0.00,82.00,0.00,0.00,0.00,0.00,0.00,82.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,82.00,0.00,0.00,82.00,0.00,0.00,0.00,0.00,0.00,82.00 +Total for Contractor,Journey,116.00,34.00,0.00,82.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,34.00,0.00,82.00,0.00,0.00,0.00,0.00,0.00,116.00 +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,32.25,32.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.25,32.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.25,"32.25 0.000.000.000.000.00","0.000.00 32.25",,,,,,,, +"",,,,,,,,,0.00,32.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.25,32.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.25, +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,48.00,16.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.67,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,48.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,80.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"16.00 0.000.0032.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.67,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,48.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,80.00 +Complete Labor and Staffing LLC,,,,,,,,,,, +LABORER,Journey,242.00,72.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,242.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,242.00,72.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,242.00 +Total for Contractor,Journey,242.00,72.00,0.00,170.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,242.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,242.00,72.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,242.00 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,28.70,0.00,0.00,0.00,0.00,0.00,28.70,0.00,0.00,28.70 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.70,0.00,0.00,0.00,0.00,0.00,28.70,0.00,0.00,28.70, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,28.70,0.00,0.00,0.00,0.00,0.00,28.70,0.00,0.00,28.70 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.70,0.00,0.00,0.00,0.00,0.00,28.70,0.00,0.00,28.70 +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00 +ROOFER,Journey,25.00,9.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",A/J Ratio,4.00,11.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,125.00,109.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,125.00 +Total for Contractor,Journey,186.00,170.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,186.00 +"",Apprentice,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",A/J Ratio,0.54,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,286.00,270.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,286.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Lighthouse Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,574.00,574.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,574.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,574.00,574.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,574.00 +LABORER: MASON TENDER,Journey,662.50,278.50,0.00,384.00,0.00,0.00,0.00,0.00,0.00,662.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,662.50,278.50,0.00,384.00,0.00,0.00,0.00,0.00,0.00,662.50 +Total for Contractor,Journey,"1,236.50",852.50,0.00,384.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,236.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,236.50",852.50,0.00,384.00,0.00,0.00,0.00,0.00,0.00,"1,236.50" +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +LABORER: CARPENTER TENDER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"1.00 0.000.000.000.000.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,,,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +Total for Contractor,Journey,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,39.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,185.95","1,473.25",0.00,652.00,32.00,0.00,28.70,0.00,0.00,"2,185.95" +Total Apprentice Hours,140.00,140.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,325.95","1,613.25",0.00,652.00,32.00,0.00,28.70,0.00,0.00,"2,325.95" +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,424.00,424.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00 +"",Apprentice,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,544.00,424.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,544.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",424.00,"424.00 0.000.000.000.000.00","0.000.00 424.00",,,,,,,, +"",,,,,,,,,,0.00,424.00 +"",Apprentice,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,544.00,424.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,544.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +CEMENT MASONRY/PLASTERING,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",70.00,"70.00 0.000.000.000.000.00","0.000.00 70.00",,,,,,,, +"",,,,,,,,,0.00,70.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,53.00,21.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,53.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.00,21.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,53.00 +LABORER,Journey,129.50,129.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,129.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,129.50,129.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,129.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",182.50,"150.50 0.000.0032.000.000.00","0.000.00 182.50",,,,,,,, +"",,,,,,,,0.00,182.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,182.50,150.50,0.00,0.00,32.00,0.00,0.00,0.00,0.00,182.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,676.50,644.50,0.00,0.00,32.00,0.00,0.00,0.00,0.00,676.50 +Total Apprentice Hours,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,796.50,644.50,0.00,120.00,32.00,0.00,0.00,0.00,0.00,796.50 +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,539.00,410.00,0.00,129.00,0.00,0.00,0.00,0.00,99.00,440.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,539.00,410.00,0.00,129.00,0.00,0.00,0.00,0.00,99.00,440.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",539.00,"410.00 0.00129.000.000.000.00","0.0099.00 440.00",,,,,,,, +"",,,,,,,,,,99.00,440.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,539.00,410.00,0.00,129.00,0.00,0.00,0.00,0.00,99.00,440.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +Total for Contractor,Journey,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,69.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,348.00,348.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,348.00 +Apprentice,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00,0.00, +A/J Ratio,0.36,0.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,473.00,473.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00,348.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,129.00,129.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,129.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,129.00,129.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,129.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",477.00,"477.00 0.000.000.000.000.00","0.000.00 477.00",,,,,,,, +"",,,,,,,,,,0.00,477.00 +"",Apprentice,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00,0.00 +"",A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,602.00,602.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00,477.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,896.50,896.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,896.50 +"",Apprentice,263.00,263.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,263.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,159.50","1,159.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,159.50" +Total for Contractor,Journey,896.50,896.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,896.50 +"",Apprentice,263.00,263.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,263.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,159.50","1,159.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,159.50" +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Total for Contractor,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"1,342.50","1,296.50",46.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,342.50" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,342.50","1,296.50",46.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,342.50", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,155.50,155.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,155.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,155.50,155.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,155.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,498.00","1,452.00 46.000.000.000.000.00","0.000.00 1,498.00",,,,,,,, +"",,,,,,,,,,0.00,"1,498.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,498.00","1,452.00",46.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,498.00" +"Convergint Technologies, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +Total for Contractor,Journey,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,45.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"Cyber Communications Solutions, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,23.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,23.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,23.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,23.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00 +"Dandis Contracting, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,"1,244.50",582.00,0.00,662.50,0.00,0.00,0.00,0.00,0.00,"1,244.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,244.50",582.00,0.00,662.50,0.00,0.00,0.00,0.00,0.00,"1,244.50" +PAINTER BRUSH NEW,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,360.00,320.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,360.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,320.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,360.00 +Total for Contractor,Journey,"1,244.50",582.00,0.00,662.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,244.50" +"",Apprentice,360.00,320.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,360.00 +"",A/J Ratio,0.29,0.55,0.00,0.06,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,604.50",902.00,0.00,702.50,0.00,0.00,0.00,0.00,0.00,"1,604.50" +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,295.00,295.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,295.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,295.00,295.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,295.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELEVATOR CONSTRUCTOR HELPER,Journey,47.75,47.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,47.75,47.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",342.75,"342.75 0.000.000.000.000.00","0.000.00 342.75",,,,,,,, +"",,,,,,,,,,0.00,342.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,342.75,342.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,342.75 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,466.00,466.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,466.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,466.00,466.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,466.00 +LABORER,Journey,"1,106.00","1,106.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,106.00" +Apprentice,78.00,0.00,0.00,78.00,0.00,0.00,0.00,0.00,78.00,0.00, +A/J Ratio,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,184.00","1,106.00",0.00,78.00,0.00,0.00,0.00,0.00,78.00,"1,106.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,572.00","1,572.00 0.000.000.000.000.00","0.000.00 1,572.00",,,,,,,, +"",,,,,,,,,0.00,"1,572.00", +Apprentice,78.00,0.00,0.00,78.00,0.00,0.00,0.00,0.00,78.00,0.00, +A/J Ratio,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,650.00","1,572.00",0.00,78.00,0.00,0.00,0.00,0.00,78.00,"1,572.00", +"Dow Company, Inc., The",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +EQUIPMENT OPERATOR (Class A CDL),Journey,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +LABORER,Journey,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50 +Total for Contractor,Journey,287.50,287.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,287.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,287.50,287.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,287.50 +"E. Amanti & Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +PLUMBERS & GASFITTERS,Journey,272.00,272.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,272.00 +Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +A/J Ratio,0.56,0.56,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.56, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,424.00,424.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,424.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.48,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.48 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,469.00,469.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,469.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,56.00,0.00,40.00,0.00,16.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,0.00,40.00,0.00,16.00,0.00,0.00,0.00,0.00,56.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",56.00,"0.00 40.000.0016.000.000.00","0.000.00 56.00",,,,,,,, +"",,,,,,,,,0.00,56.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,0.00,40.00,0.00,16.00,0.00,0.00,0.00,0.00,56.00 +Emanouil Landscaping,,,,,,,,,,, +LABORER,Journey,167.00,111.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,167.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,167.00,111.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,167.00 +Total for Contractor,Journey,167.00,111.00,0.00,56.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,167.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,167.00,111.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,167.00, +Empire Masonry Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER: MASON TENDER,Journey,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,48.00,40.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,40.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,48.00 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",18.50,"18.50 0.000.000.000.000.00","0.000.00 18.50",,,,,,,, +"",,,,,,,,,0.00,18.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50, +"Feeley, McAnespie",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,123.50,99.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,123.50 +"",Apprentice,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",A/J Ratio,0.45,0.55,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,178.50,154.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,178.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",123.50,"99.50 24.000.000.000.000.00","0.000.00 123.50",,,,,,,, +"",,,,,,,,,,0.00,123.50 +"",Apprentice,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",A/J Ratio,0.45,0.55,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,178.50,154.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,178.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,662.00,352.00,162.00,130.00,18.00,0.00,0.00,0.00,0.00,662.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,662.00,352.00,162.00,130.00,18.00,0.00,0.00,0.00,0.00,662.00 +Total for Contractor,Journey,662.00,352.00,162.00,130.00,18.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,662.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,662.00,352.00,162.00,130.00,18.00,0.00,0.00,0.00,0.00,662.00 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,"1,034.00",244.00,0.00,790.00,0.00,0.00,0.00,0.00,501.00,533.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,034.00",244.00,0.00,790.00,0.00,0.00,0.00,0.00,501.00,533.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,034.00",244.00,0.00,790.00,0.00,0.00,0.00,0.00,501.00,533.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,034.00",244.00,0.00,790.00,0.00,0.00,0.00,0.00,501.00,533.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +LABORER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +SPRINKLER FITTER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,144.00,128.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,144.00, +A/J Ratio,1.00,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,288.00,272.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,288.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",172.00,"172.00 0.000.000.000.000.00","0.000.00 172.00",,,,,,,, +"",,,,,,,,,0.00,172.00, +Apprentice,144.00,128.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,144.00, +A/J Ratio,0.84,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,316.00,300.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,316.00, +"Interstate Insulation, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"0.00 0.000.000.000.0020.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,761.00,761.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,761.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,761.00,761.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,761.00 +Total for Contractor,Journey,761.00,761.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,761.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,761.00,761.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,761.00 +"Lymo Construction Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00 +LABORER,Journey,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,110.00,78.00,0.00,32.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,110.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,78.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,110.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,808.00,706.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,808.00 +Apprentice,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00, +A/J Ratio,0.15,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,932.00,830.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,932.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,808.00,706.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,808.00 +"",Apprentice,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",A/J Ratio,0.15,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,932.00,830.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,932.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,136.00,88.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,88.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +PIPEFITTER & STEAMFITTER,Journey,488.00,456.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,488.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,488.00,456.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,488.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",504.00,"472.00 0.0032.000.000.000.00","0.000.00 504.00",,,,,,,, +"",,,,,,,,,0.00,504.00, +Apprentice,136.00,88.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +A/J Ratio,0.27,0.19,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,640.00,560.00,48.00,32.00,0.00,0.00,0.00,0.00,0.00,640.00, +Pro Cut Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER: MULTI-TRADE TENDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,0.00, +A/J Ratio,4.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,72.00,0.00,8.00,0.00,0.00,0.00,0.00,64.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"56.00 0.008.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,16.00, +A/J Ratio,1.25,1.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,144.00,136.00,0.00,8.00,0.00,0.00,0.00,0.00,64.00,80.00, +"Safway Services LLC, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +MECHANICS MAINTENANCE,Journey,269.00,269.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,269.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,269.00,269.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,269.00 +Total for Contractor,Journey,293.00,293.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,293.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,293.00,293.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,293.00 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,576.00,232.00,0.00,316.00,28.00,0.00,0.00,0.00,0.00,576.00 +Apprentice,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.01,0.00,0.00,0.03,0.00,0.00,0.00,0.00,0.00,0.01, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,584.00,232.00,0.00,324.00,28.00,0.00,0.00,0.00,0.00,584.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,576.00,232.00,0.00,316.00,28.00,0.00,0.00,0.00,0.00,576.00 +"",Apprentice,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.01,0.00,0.00,0.03,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,584.00,232.00,0.00,324.00,28.00,0.00,0.00,0.00,0.00,584.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,54.00,28.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,54.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,28.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,54.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",54.00,"28.00 0.0026.000.000.000.00","0.000.00 54.00",,,,,,,, +"",,,,,,,,,,0.00,54.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,28.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,54.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,26.75,26.75,0.00,0.00,0.00,0.00,0.00,0.00,26.75,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.75,26.75,0.00,0.00,0.00,0.00,0.00,0.00,26.75,0.00 +IRONWORKER/WELDER,Journey,856.50,802.50,42.50,11.50,0.00,0.00,0.00,0.00,0.00,856.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,856.50,802.50,42.50,11.50,0.00,0.00,0.00,0.00,0.00,856.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,856.50,802.50,42.50,11.50,0.00,0.00,0.00,0.00,0.00,856.50 +"",Apprentice,26.75,26.75,0.00,0.00,0.00,0.00,0.00,0.00,26.75,0.00 +"",A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,883.25,829.25,42.50,11.50,0.00,0.00,0.00,0.00,26.75,856.50 +"Valley Communications Systems, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,152.25,152.25,0.00,0.00,0.00,0.00,0.00,0.00,20.50,131.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.25,152.25,0.00,0.00,0.00,0.00,0.00,0.00,20.50,131.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",152.25,"152.25 0.000.000.000.000.00","0.0020.50 131.75",,,,,,,, +"",,,,,,,,,,20.50,131.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.25,152.25,0.00,0.00,0.00,0.00,0.00,0.00,20.50,131.75 +ver-tex construction specialties,,,,,,,,,,, +CARPENTER,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.69,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,59.00,35.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,59.00 +JOURNEYMAN LINEMAN,Journey,60.75,60.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,60.75,60.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,95.75,95.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.75 +"",Apprentice,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,119.75,95.75,0.00,24.00,0.00,0.00,0.00,0.00,0.00,119.75 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,202.00","1,114.00",0.00,88.00,0.00,0.00,0.00,0.00,0.00,"1,202.00" +"",Apprentice,318.00,270.00,0.00,48.00,0.00,0.00,0.00,0.00,24.00,294.00 +"",A/J Ratio,0.26,0.24,0.00,0.55,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,520.00","1,384.00",0.00,136.00,0.00,0.00,0.00,0.00,24.00,"1,496.00" +TELECOMMUNICATION TECHNICIAN,Journey,786.75,542.25,122.50,0.00,122.00,0.00,0.00,0.00,0.00,786.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,786.75,542.25,122.50,0.00,122.00,0.00,0.00,0.00,0.00,786.75 +Total for Contractor,Journey,"1,988.75","1,656.25",122.50,88.00,122.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,988.75" +"",Apprentice,318.00,270.00,0.00,48.00,0.00,0.00,0.00,0.00,24.00,294.00 +"",A/J Ratio,0.16,0.16,0.00,0.55,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,306.75","1,926.25",122.50,136.00,122.00,0.00,0.00,0.00,24.00,"2,282.75" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,300.00,174.00,0.00,126.00,0.00,0.00,0.00,0.00,0.00,300.00 +Apprentice,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00, +A/J Ratio,0.58,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.58, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,474.00,348.00,0.00,126.00,0.00,0.00,0.00,0.00,0.00,474.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +MARBLE & TILE FINISHERS,Journey,460.00,456.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,460.00 +"",Apprentice,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",A/J Ratio,0.02,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,468.50,464.50,0.00,4.00,0.00,0.00,0.00,0.00,0.00,468.50 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,870.50,214.50,0.00,656.00,0.00,0.00,0.00,0.00,0.00,870.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,870.50,214.50,0.00,656.00,0.00,0.00,0.00,0.00,0.00,870.50 +Total for Contractor,Journey,"1,662.50",876.50,0.00,786.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,662.50" +"",Apprentice,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +"",A/J Ratio,0.11,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,845.00","1,059.00",0.00,786.00,0.00,0.00,0.00,0.00,0.00,"1,845.00" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,347.00,347.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,347.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,347.00,347.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,347.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,347.00,347.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,347.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,347.00,347.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,347.00, +Total Journey Hours,"18,225.00","14,376.00",460.00,"3,185.00",184.00,0.00,20.00,0.00,620.50,"17,604.50", +Total Apprentice Hours,"2,180.25","1,918.25",48.00,198.00,0.00,0.00,16.00,0.00,317.75,"1,862.50", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"20,405.25","16,294.25",508.00,"3,383.00",184.00,0.00,36.00,0.00,938.25,"19,467.00", +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Contracting Specialists,,,,,,,,,,, +LABORER: MASON TENDER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"72.00 0.000.000.000.000.00","0.000.00 72.00",,,,,,,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,151.00,119.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,151.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,151.00,119.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,151.00 +LABORER,Journey,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",267.00,"235.00 0.0032.000.000.000.00","0.000.00 267.00",,,,,,,, +"",,,,,,,,,0.00,267.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,267.00,235.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,267.00, +Crocker Architectural Sheet Metal,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +SHEETMETAL WORKER,Journey,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,125.00,125.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,125.00 +Total for Contractor,Journey,191.00,191.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,191.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,191.00,191.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,191.00 +"JRJ Corporation Co., Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +LABORER: CEMENT FINISHER TENDER,Journey,103.00,0.00,0.00,103.00,0.00,0.00,0.00,0.00,0.00,103.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,103.00,0.00,0.00,103.00,0.00,0.00,0.00,0.00,0.00,103.00 +LABORER: MULTI-TRADE TENDER,Journey,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,434.00,331.00,0.00,103.00,0.00,0.00,0.00,0.00,0.00,434.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,434.00,331.00,0.00,103.00,0.00,0.00,0.00,0.00,0.00,434.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +CEMENT MASONRY/PLASTERING,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +IRONWORKER/WELDER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,80.00,8.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,8.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,80.00 +PUMP OPERATOR (CONCRETE),Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,231.50,159.50,0.00,72.00,0.00,0.00,0.00,0.00,0.00,231.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,231.50,159.50,0.00,72.00,0.00,0.00,0.00,0.00,0.00,231.50 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,236.00,196.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,236.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,236.00,196.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,236.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",236.00,"196.00 0.000.000.000.0040.00","0.000.00 236.00",,,,,,,, +"",,,,,,,,,,0.00,236.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,236.00,196.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,236.00 +Yard Works Inc.,,,,,,,,,,, +LABORER,Journey,53.50,7.00,0.00,46.50,0.00,0.00,0.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,7.00,0.00,46.50,0.00,0.00,0.00,0.00,0.00,53.50 +Total for Contractor,Journey,53.50,7.00,0.00,46.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,53.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,53.50,7.00,0.00,46.50,0.00,0.00,0.00,0.00,0.00,53.50, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,485.00","1,191.50",0.00,253.50,0.00,0.00,40.00,0.00,0.00,"1,485.00" +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,485.00","1,191.50",0.00,253.50,0.00,0.00,40.00,0.00,0.00,"1,485.00" +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.00 +Apprentice,130.00,8.00,0.00,122.00,0.00,0.00,0.00,0.00,0.00,130.00, +A/J Ratio,0.44,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,424.00,302.00,0.00,122.00,0.00,0.00,0.00,0.00,0.00,424.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",294.00,"294.00 0.000.000.000.000.00","0.000.00 294.00",,,,,,,, +"",,,,,,,,,0.00,294.00, +Apprentice,130.00,8.00,0.00,122.00,0.00,0.00,0.00,0.00,0.00,130.00, +A/J Ratio,0.44,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,424.00,302.00,0.00,122.00,0.00,0.00,0.00,0.00,0.00,424.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,41.75,41.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.75,41.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,41.75,41.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.75,41.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.75 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,556.50,556.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,556.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,556.50,556.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,556.50 +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,558.50,558.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,558.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,558.50,558.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,558.50 +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,26.50,26.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.50,26.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",26.50,"26.50 0.000.000.000.000.00","0.000.00 26.50",,,,,,,, +"",,,,,,,,,,0.00,26.50 +"",Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",A/J Ratio,0.28,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +Total for Contractor,Journey,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,149.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +MTJ Landscapes,,,,,,,,,,, +LABORER,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"SPECIALIZED EARTH MOVING EQUIP > 35 TONS",Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +IRONWORKER/WELDER,Journey,48.00,0.00,0.00,24.00,24.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,0.00,0.00,24.00,24.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,48.00,0.00,0.00,24.00,0.00,0.00,24.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,0.00,0.00,24.00,0.00,0.00,24.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",96.00,"0.00 0.0048.0024.000.0024.00","0.000.00 96.00",,,,,,,, +"",,,,,,,,,0.00,96.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,0.00,0.00,48.00,24.00,0.00,24.00,0.00,0.00,96.00, +"Stanley Roofing Company, inc",,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,620.25,307.25,0.00,313.00,0.00,0.00,0.00,0.00,0.00,620.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,620.25,307.25,0.00,313.00,0.00,0.00,0.00,0.00,0.00,620.25 +SHEETMETAL WORKER,Journey,268.50,100.00,0.00,168.50,0.00,0.00,0.00,0.00,0.00,268.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,268.50,100.00,0.00,168.50,0.00,0.00,0.00,0.00,0.00,268.50 +Total for Contractor,Journey,888.75,407.25,0.00,481.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,888.75, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,888.75,407.25,0.00,481.50,0.00,0.00,0.00,0.00,0.00,888.75 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,523.00,252.50,0.00,270.50,0.00,0.00,0.00,0.00,0.00,523.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,523.00,252.50,0.00,270.50,0.00,0.00,0.00,0.00,0.00,523.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",523.00,"252.50 0.00270.500.000.000.00","0.000.00 523.00",,,,,,,, +"",,,,,,,,0.00,523.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,523.00,252.50,0.00,270.50,0.00,0.00,0.00,0.00,0.00,523.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,657.50","1,809.50",0.00,800.00,24.00,0.00,24.00,0.00,0.00,"2,657.50" +Total Apprentice Hours,137.50,15.50,0.00,122.00,0.00,0.00,0.00,0.00,0.00,137.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,795.00","1,825.00",0.00,922.00,24.00,0.00,24.00,0.00,0.00,"2,795.00" +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,447.50,447.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,447.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,447.50,447.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,447.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,472.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,472.00 +Total for Contractor,Journey,919.50,919.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,919.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,919.50,919.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,919.50 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",118.00,"118.00 0.000.000.000.000.00","0.000.00 118.00",,,,,,,, +"",,,,,,,,,0.00,118.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +PIPEFITTER & STEAMFITTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Total for Contractor,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,39.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 0.0016.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,092.50","1,076.50",0.00,16.00,0.00,0.00,0.00,0.00,0.00,"1,092.50" +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,092.50","1,076.50",0.00,16.00,0.00,0.00,0.00,0.00,0.00,"1,092.50" +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Louis C. Allegrone, Inc.",,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,121.00,48.00,0.00,73.00,0.00,0.00,0.00,0.00,0.00,121.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,121.00,48.00,0.00,73.00,0.00,0.00,0.00,0.00,0.00,121.00, +LABORER: MASON TENDER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +Total for Contractor,Journey,179.00,106.00,0.00,73.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,0.00,179.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,179.00,106.00,0.00,73.00,0.00,0.00,0.00,0.00,0.00,179.00,, +Total Journey Hours,179.00,106.00,0.00,73.00,0.00,0.00,0.00,0.00,0.00,179.00,, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,179.00,106.00,0.00,73.00,0.00,0.00,0.00,0.00,0.00,179.00,, +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Collins Electric Co., Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"7.00 0.000.000.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,,,0.00,7.00 +"",Apprentice,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,393.00,393.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,393.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,393.00,393.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,393.00 +LABORER,Journey,656.00,504.50,0.00,151.50,0.00,0.00,0.00,0.00,143.50,512.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,656.00,504.50,0.00,151.50,0.00,0.00,0.00,0.00,143.50,512.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,049.00","897.50 0.00151.500.000.000.00","0.00143.50 905.50",,,,,,,, +"",,,,,,,,,143.50,905.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,049.00",897.50,0.00,151.50,0.00,0.00,0.00,0.00,143.50,905.50, +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,056.00",904.50,0.00,151.50,0.00,0.00,0.00,0.00,143.50,912.50 +Total Apprentice Hours,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,063.00",911.50,0.00,151.50,0.00,0.00,0.00,0.00,143.50,919.50 diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportFeb2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportFeb2019.csv new file mode 100644 index 00000000..3ef4f618 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportFeb2019.csv @@ -0,0 +1,2025 @@ +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,12.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"0.00 0.000.004.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00 +"Eastfield Glass Co,. Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,13.50,4.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,4.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,13.50 +Total for Contractor,Journey,13.50,4.50,0.00,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,4.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,13.50 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +SHEETMETAL WORKER,Journey,44.50,44.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.50,44.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.50 +Total for Contractor,Journey,68.50,68.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,68.50 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.12,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.12 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.50,76.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.50 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"7.00 0.000.000.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,,0.00,7.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"King Painting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",25.00,"0.00 0.0025.000.000.000.00","0.000.00 25.00",,,,,,,, +"",,,,,,,,,,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +MORTECH MANUFACTURING,,,,,,,,,,, +LABORER: CARPENTER TENDER,Journey,18.00,0.00,0.00,18.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,0.00,0.00,18.00,0.00,0.00,0.00,0.00,0.00,18.00 +Total for Contractor,Journey,18.00,0.00,0.00,18.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,0.00,0.00,18.00,0.00,0.00,0.00,0.00,0.00,18.00 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",470.00,"470.00 0.000.000.000.000.00","0.000.00 470.00",,,,,,,, +"",,,,,,,,,,0.00,470.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,470.00,470.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,470.00 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +Total for Contractor,Journey,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,75.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.50,75.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.50 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,13.98,11.20,0.00,0.00,0.00,0.00,0.00,2.78,0.00,13.98 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.98,11.20,0.00,0.00,0.00,0.00,0.00,2.78,0.00,13.98, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,13.98,11.20,0.00,0.00,0.00,0.00,0.00,2.78,0.00,13.98 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.98,11.20,0.00,0.00,0.00,0.00,0.00,2.78,0.00,13.98 +"Saltbox Millwork , LLC",,,,,,,,,,, +CARPENTER,Journey,83.25,83.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.25,83.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",83.25,"83.25 0.000.000.000.000.00","0.000.00 83.25",,,,,,,, +"",,,,,,,,,0.00,83.25, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.25,83.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.25 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Ultimate Construction, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,16.00,0.00,8.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,8.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"0.00 8.000.000.000.008.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,8.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Total for Contractor,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Walch & Company Inc.,,,,,,,,,,, +CARPENTER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"X-Ray Imaging Technologies, Inc",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",45.50,"45.50 0.000.000.000.000.00","0.000.00 45.50",,,,,,,, +"",,,,,,,,0.00,45.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +Total Journey Hours,952.23,861.45,8.00,68.00,4.00,0.00,8.00,2.78,0.00,952.23, +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,960.23,869.45,8.00,68.00,4.00,0.00,8.00,2.78,0.00,960.23, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1908 OM1 C Job Order Contract for General Contractor Services – Central Region Project Code: DCP1908 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",160.00,"160.00 0.000.000.000.000.00","0.000.00 160.00",,,,,,,, +"",,,,,,,,,,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,270.00,270.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,270.00,270.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.00 +LABORER,Journey,448.00,448.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,448.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,448.00,448.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,448.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",718.00,"718.00 0.000.000.000.000.00","0.000.00 718.00",,,,,,,, +"",,,,,,,,0.00,718.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,718.00,718.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,718.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,922.00,922.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,922.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,922.00,922.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,922.00 +"Project Name: DMH0902 EC1 C Taunton State Hospital Energy Project Project Code: DMH0902 EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",36.00,"36.00 0.000.000.000.000.00","0.000.00 36.00",,,,,,,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,518.00,518.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,518.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,518.00,518.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,518.00 +Total for Contractor,Journey,518.00,518.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,518.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,518.00,518.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,518.00, +Total Journey Hours,554.00,554.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,554.00,554.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +American Steel & Precast Erectors,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +IRONWORKER/WELDER,Journey,476.00,476.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,476.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,476.00,476.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,476.00 +Total for Contractor,Journey,538.00,538.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,538.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,538.00,538.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,538.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Hartin Welding,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +IRONWORKER/WELDER,Journey,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",204.00,"204.00 0.000.000.000.000.00","0.000.00 204.00",,,,,,,, +"",,,,,,,,,0.00,204.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +Total for Contractor,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,5.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50, +Total Journey Hours,763.50,763.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,763.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,763.50,763.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,763.50, +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,24.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total Journey Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +LABORER,Journey,139.00,139.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,139.00,139.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,277.00,277.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,277.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,277.00,277.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,277.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +SHEETMETAL WORKER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Total for Contractor,Journey,94.00,94.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,94.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,94.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.00 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Industrial Mechanical Insulation,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",9.00,"9.00 0.000.000.000.000.00","0.000.00 9.00",,,,,,,, +"",,,,,,,,,0.00,9.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"Lizotte Glass, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,15.75,0.00,0.00,15.75,0.00,0.00,0.00,0.00,0.00,15.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.75,0.00,0.00,15.75,0.00,0.00,0.00,0.00,0.00,15.75 +Total for Contractor,Journey,15.75,0.00,0.00,15.75,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,15.75,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.75,0.00,0.00,15.75,0.00,0.00,0.00,0.00,0.00,15.75, +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER: MASON TENDER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,28.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total Journey Hours,444.75,429.00,0.00,15.75,0.00,0.00,0.00,0.00,0.00,444.75, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,444.75,429.00,0.00,15.75,0.00,0.00,0.00,0.00,0.00,444.75, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Professional Fire Systems, Inc.",,,,,,,,,,, +"FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY",Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",34.00,"34.00 0.000.000.000.000.00","0.000.00 34.00",,,,,,,, +"",,,,,,,,0.00,34.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Journey Hours,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +LABORER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +PIPEFITTER & STEAMFITTER,Journey,77.50,77.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,77.50,77.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.50 +PLUMBERS & GASFITTERS,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +SHEETMETAL WORKER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",286.50,"286.50 0.000.000.000.000.00","0.000.00 286.50",,,,,,,, +"",,,,,,,,,0.00,286.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,286.50,286.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,286.50, +Archer Corp,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",298.00,"298.00 0.000.000.000.000.00","0.000.00 298.00",,,,,,,, +"",,,,,,,,,,0.00,298.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +MARBLE & TILE FINISHERS,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,345.50,345.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,345.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,345.50,345.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,345.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",345.50,"345.50 0.000.000.000.000.00","0.000.00 345.50",,,,,,,, +"",,,,,,,,,0.00,345.50, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00, +A/J Ratio,0.02,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,353.50,353.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,345.50, +"Bay State Building Specialties, INC",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Total for Contractor,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,528.00,528.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,528.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,398.50,256.00,0.00,0.00,0.00,0.00,142.50,0.00,0.00,398.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,398.50,256.00,0.00,0.00,0.00,0.00,142.50,0.00,0.00,398.50 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,772.00,772.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,772.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,772.00,772.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,772.00 +Total for Contractor,Journey,"1,170.50","1,028.00",0.00,0.00,0.00,0.00,142.50,0.00,, +"",,,,,,,,,,0.00,"1,170.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,170.50","1,028.00",0.00,0.00,0.00,0.00,142.50,0.00,0.00,"1,170.50" +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +INSULATOR (PIPES & TANKS),Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",67.00,"67.00 0.000.000.000.000.00","0.000.00 67.00",,,,,,,, +"",,,,,,,,,,0.00,67.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.12,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.12 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",280.00,"280.00 0.000.000.000.000.00","0.000.00 280.00",,,,,,,, +"",,,,,,,,,0.00,280.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,280.00,280.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,280.00, +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,84.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",68.00,"68.00 0.000.000.000.000.00","0.000.00 68.00",,,,,,,, +"",,,,,,,,,,0.00,68.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,84.00 +Simplex Grinnell LP,,,,,,,,,,, +ELECTRICIAN,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +Total for Contractor,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +Skyline Drywall Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH,REPAINT)",Journey,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,80.00,64.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,64.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.00,"64.00 16.000.000.000.000.00","0.000.00 80.00",,,,,,,, +"",,,,,,,,,0.00,80.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,64.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,64.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,64.00,16.00 +Total for Contractor,Journey,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,64.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,64.00,16.00, +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,158.00,56.00,21.00,81.00,0.00,0.00,0.00,0.00,0.00,158.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,158.00,56.00,21.00,81.00,0.00,0.00,0.00,0.00,0.00,158.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",158.00,"56.00 21.0081.000.000.000.00","0.000.00 158.00",,,,,,,, +"",,,,,,,,,,0.00,158.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,158.00,56.00,21.00,81.00,0.00,0.00,0.00,0.00,0.00,158.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.70,0.70,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.70 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00 +Total for Contractor,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,184.00 +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.70,0.70,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.70 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,30.00,24.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,30.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,30.00,24.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,30.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",138.00,"132.00 0.000.006.000.000.00","0.000.00 138.00",,,,,,,, +"",,,,,,,,,,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,132.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,138.00 +"Titan Roofing, Inc.",,,,,,,,,,, +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.25 +SHEETMETAL WORKER,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +Apprentice,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +A/J Ratio,0.99,0.99,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.99, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",91.25,"91.25 0.000.000.000.000.00","0.000.00 91.25",,,,,,,, +"",,,,,,,,,0.00,91.25, +Apprentice,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +A/J Ratio,0.90,0.90,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.90, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,173.25,173.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,173.25, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,718.25,598.25,0.00,120.00,0.00,0.00,0.00,0.00,0.00,718.25 +"",Apprentice,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00 +"",A/J Ratio,0.41,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,010.25",890.25,0.00,120.00,0.00,0.00,0.00,0.00,0.00,"1,010.25" +TELECOMMUNICATION TECHNICIAN,Journey,76.50,76.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.50,76.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.50 +Total for Contractor,Journey,794.75,674.75,0.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,794.75, +Apprentice,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00, +A/J Ratio,0.37,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,086.75",966.75,0.00,120.00,0.00,0.00,0.00,0.00,0.00,"1,086.75", +Total Journey Hours,"4,952.50","4,430.00",37.00,337.00,6.00,0.00,142.50,0.00,64.00,"4,888.50", +Total Apprentice Hours,582.00,582.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,574.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"5,534.50","5,012.00",37.00,337.00,6.00,0.00,142.50,0.00,72.00,"5,462.50", +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,0.00,10.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Journey Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,176.00,164.00,0.00,6.00,6.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,164.00,0.00,6.00,6.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"164.00 0.006.006.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,0.00,176.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,164.00,0.00,6.00,6.00,0.00,0.00,0.00,0.00,176.00, +Total Journey Hours,176.00,164.00,0.00,6.00,6.00,0.00,0.00,0.00,0.00,176.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,176.00,164.00,0.00,6.00,6.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,26.00,19.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,19.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +SHEETMETAL WORKER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,38.00,31.50,6.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,31.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"Mill City Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,127.75,127.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,127.75,127.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",127.75,"127.75 0.000.000.000.000.00","0.000.00 127.75",,,,,,,, +"",,,,,,,,,0.00,127.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,127.75,127.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.75, +"Thermo-Dynamics International, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00 +INSULATOR (PIPES & TANKS),Journey,242.00,59.00,80.00,103.00,0.00,0.00,0.00,0.00,0.00,242.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,242.00,59.00,80.00,103.00,0.00,0.00,0.00,0.00,0.00,242.00 +Total for Contractor,Journey,242.00,59.00,80.00,103.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,242.00, +Apprentice,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00, +A/J Ratio,0.31,1.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,316.00,133.00,80.00,103.00,0.00,0.00,0.00,0.00,0.00,316.00, +Total Journey Hours,407.75,218.25,86.50,103.00,0.00,0.00,0.00,0.00,0.00,407.75, +Total Apprentice Hours,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,481.75,292.25,86.50,103.00,0.00,0.00,0.00,0.00,0.00,481.75, +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +SPRINKLER FITTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDF1401E EC1 C Sheriff's Department Franklin Energy/Water Design/Build Project Project Code: SDF1401E EC1",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Millennium Builders, Inc.",,,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.00,"80.00 0.000.000.000.000.00","0.000.00 80.00",,,,,,,,, +"",,,,,,,,0.00,80.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00,, +Total Journey Hours,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00,, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00,, +"0.000.00 80.00", +0.00,80.00 +"Project Name: SDN1501E EC1 C Comprehensive Energy and Water Upgrades Project Code: SDN1501E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +ELECTRICIAN,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",27.00,"27.00 0.000.000.000.000.00","0.000.00 27.00",,,,,,,, +"",,,,,,,,0.00,27.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00, +Total Journey Hours,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,85.40,0.00,0.00,0.00,0.00,0.00,85.40,0.00,0.00,85.40 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,85.40,0.00,0.00,0.00,0.00,0.00,85.40,0.00,0.00,85.40 +LABORER,Journey,186.69,0.00,0.00,0.00,0.00,0.00,186.69,0.00,0.00,186.69 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,186.69,0.00,0.00,0.00,0.00,0.00,186.69,0.00,0.00,186.69 +Total for Contractor,Journey,272.09,0.00,0.00,0.00,0.00,0.00,272.09,0.00,, +"",,,,,,,,,,0.00,272.09 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,272.09,0.00,0.00,0.00,0.00,0.00,272.09,0.00,0.00,272.09 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,40.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"0.00 0.000.000.0040.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,0.00,0.00,0.00,0.00,40.00,0.00,0.00,0.00,40.00, +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,247.50,247.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.50 +"",Apprentice,90.00,90.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.00 +"",A/J Ratio,0.36,0.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.36 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,337.50,337.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,337.50 +LABORER: CARPENTER TENDER,Journey,137.50,137.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.50,137.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.50 +Total for Contractor,Journey,385.00,385.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,385.00, +Apprentice,90.00,90.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.00, +A/J Ratio,0.23,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,475.00,475.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,475.00, +Total Journey Hours,697.09,385.00,0.00,0.00,0.00,40.00,272.09,0.00,0.00,697.09, +Total Apprentice Hours,90.00,90.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,787.09,475.00,0.00,0.00,0.00,40.00,272.09,0.00,0.00,787.09, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,212.00,80.00,0.00,132.00,0.00,0.00,0.00,0.00,0.00,212.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,212.00,80.00,0.00,132.00,0.00,0.00,0.00,0.00,0.00,212.00 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,236.00,104.00,0.00,132.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,236.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,236.00,104.00,0.00,132.00,0.00,0.00,0.00,0.00,0.00,236.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Automated Building Systems,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,566.50,566.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,566.50 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.25,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,710.50,710.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,710.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",566.50,"566.50 0.000.000.000.000.00","0.000.00 566.50",,,,,,,, +"",,,,,,,,,,0.00,566.50 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.25,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,710.50,710.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,710.50 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Total for Contractor,Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"2,648.00","2,395.00",0.00,253.00,0.00,0.00,0.00,0.00,0.00,"2,648.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,648.00","2,395.00",0.00,253.00,0.00,0.00,0.00,0.00,0.00,"2,648.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,581.50,581.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,581.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,581.50,581.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,581.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","3,229.50","2,976.50 0.00253.000.000.000.00","0.000.00 3,229.50",,,,,,,, +"",,,,,,,,,,0.00,"3,229.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,229.50","2,976.50",0.00,253.00,0.00,0.00,0.00,0.00,0.00,"3,229.50" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00,0.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,170.00,111.00,0.00,59.00,0.00,0.00,0.00,0.00,0.00,170.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,170.00,111.00,0.00,59.00,0.00,0.00,0.00,0.00,0.00,170.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",209.00,"150.00 0.0059.000.000.000.00","0.0039.00 170.00",,,,,,,, +"",,,,,,,,,39.00,170.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,209.00,150.00,0.00,59.00,0.00,0.00,0.00,0.00,39.00,170.00, +Delta Beckwith Elevator,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELEVATOR CONSTRUCTOR,Journey,421.50,421.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,421.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,421.50,421.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,421.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,277.75,277.75,0.00,0.00,0.00,0.00,0.00,0.00,130.00,147.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,277.75,277.75,0.00,0.00,0.00,0.00,0.00,0.00,130.00,147.75 +Total for Contractor,Journey,699.25,699.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,130.00,569.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,699.25,699.25,0.00,0.00,0.00,0.00,0.00,0.00,130.00,569.25 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +LABORER,Journey,618.00,618.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,618.00 +Apprentice,155.00,0.00,0.00,155.00,0.00,0.00,0.00,0.00,155.00,0.00, +A/J Ratio,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,773.00,618.00,0.00,155.00,0.00,0.00,0.00,0.00,155.00,618.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,694.00,694.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,694.00 +"",Apprentice,155.00,0.00,0.00,155.00,0.00,0.00,0.00,0.00,155.00,0.00 +"",A/J Ratio,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,849.00,694.00,0.00,155.00,0.00,0.00,0.00,0.00,155.00,694.00 +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +LABORER,Journey,186.50,186.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,186.50,186.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.50 +Total for Contractor,Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +"E. Amanti & Sons, Inc",,,,,,,,,,, +LABORER,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,682.50,656.50,0.00,26.00,0.00,0.00,0.00,0.00,0.00,682.50 +"",Apprentice,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00 +"",A/J Ratio,0.24,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,845.50,819.50,0.00,26.00,0.00,0.00,0.00,0.00,0.00,845.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",703.50,"677.50 0.0026.000.000.000.00","0.000.00 703.50",,,,,,,, +"",,,,,,,,,,0.00,703.50 +"",Apprentice,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00 +"",A/J Ratio,0.23,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,866.50,840.50,0.00,26.00,0.00,0.00,0.00,0.00,0.00,866.50 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,419.00,419.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,419.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,419.00,419.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,419.00 +Total for Contractor,Journey,419.00,419.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,419.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,419.00,419.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,419.00 +"Electrical Engineering & Service Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,62.50,62.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,62.50,62.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,62.50,62.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.50,62.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,486.00,486.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,486.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,486.00,486.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,486.00 +LABORER: MASON TENDER,Journey,478.00,324.00,0.00,154.00,0.00,0.00,0.00,0.00,0.00,478.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,478.00,324.00,0.00,154.00,0.00,0.00,0.00,0.00,0.00,478.00 +Total for Contractor,Journey,964.00,810.00,0.00,154.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,964.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,964.00,810.00,0.00,154.00,0.00,0.00,0.00,0.00,0.00,964.00 +"Federal Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,194.50,194.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,194.50,194.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,56.00,40.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,40.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +IRONWORKER/WELDER,Journey,135.00,130.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,135.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,135.00,130.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,135.00 +LABORER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Total for Contractor,Journey,465.50,460.50,5.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,465.50, +"",Apprentice,56.00,40.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",A/J Ratio,0.12,0.09,3.20,0.00,0.00,0.00,0.00,0.00,0.00,0.12 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,521.50,500.50,21.00,0.00,0.00,0.00,0.00,0.00,0.00,521.50 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,424.50,373.00,0.00,51.50,0.00,0.00,0.00,0.00,0.00,424.50 +"",Apprentice,185.50,59.50,83.00,43.00,0.00,0.00,0.00,0.00,0.00,185.50 +"",A/J Ratio,0.44,0.16,0.00,0.83,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.00,432.50,83.00,94.50,0.00,0.00,0.00,0.00,0.00,610.00 +SHEETMETAL WORKER,Journey,78.00,31.00,47.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00 +Apprentice,22.00,0.00,0.00,0.00,22.00,0.00,0.00,0.00,0.00,22.00, +A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,100.00,31.00,47.00,0.00,22.00,0.00,0.00,0.00,0.00,100.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,502.50,404.00,47.00,51.50,0.00,0.00,0.00,0.00,0.00,502.50 +"",Apprentice,207.50,59.50,83.00,43.00,22.00,0.00,0.00,0.00,0.00,207.50 +"",A/J Ratio,0.41,0.15,1.77,0.83,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,710.00,463.50,130.00,94.50,22.00,0.00,0.00,0.00,0.00,710.00 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,532.00,356.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,532.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,532.00,356.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,532.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",532.00,"356.00 176.000.000.000.000.00","0.000.00 532.00",,,,,,,, +"",,,,,,,,,0.00,532.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,532.00,356.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,532.00 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,160.00,80.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,80.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,160.00 +Total for Contractor,Journey,160.00,80.00,0.00,80.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,160.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,80.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,160.00, +"H Carr & Sons, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +LABORER,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Total for Contractor,Journey,236.00,236.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,236.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,236.00,236.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,236.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +LABORER,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +SPRINKLER FITTER,Journey,334.00,162.00,0.00,0.00,0.00,0.00,172.00,0.00,0.00,334.00 +Apprentice,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00, +A/J Ratio,0.91,1.88,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.91, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,638.00,466.00,0.00,0.00,0.00,0.00,172.00,0.00,0.00,638.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,472.00,300.00,0.00,0.00,0.00,0.00,172.00,0.00,0.00,472.00 +"",Apprentice,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",A/J Ratio,0.64,1.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.64 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,776.00,604.00,0.00,0.00,0.00,0.00,172.00,0.00,0.00,776.00 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,61.00,34.00,0.00,0.00,0.00,0.00,27.00,0.00,0.00,61.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,61.00,34.00,0.00,0.00,0.00,0.00,27.00,0.00,0.00,61.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",61.00,"34.00 0.000.000.000.0027.00","0.000.00 61.00",,,,,,,, +"",,,,,,,,,0.00,61.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,61.00,34.00,0.00,0.00,0.00,0.00,27.00,0.00,0.00,61.00 +"Lymo Construction Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,679.00,541.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,679.00 +"",Apprentice,242.00,242.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,242.00 +"",A/J Ratio,0.36,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.36 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,921.00,783.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,921.00 +Total for Contractor,Journey,679.00,541.00,0.00,138.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,679.00,, +Apprentice,242.00,242.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,242.00, +A/J Ratio,0.36,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.36, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,921.00,783.00,0.00,138.00,0.00,0.00,0.00,0.00,0.00,921.00, +"Marguerite Concrete, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,81.50,81.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.50 +"",Apprentice,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,0.00 +"",A/J Ratio,0.12,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,91.50,91.50,0.00,0.00,0.00,0.00,0.00,0.00,10.00,81.50 +LABORER,Journey,64.00,56.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,56.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +PUMP OPERATOR (CONCRETE),Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Total for Contractor,Journey,153.00,145.00,8.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,153.00, +"",Apprentice,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,0.00 +"",A/J Ratio,0.07,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,163.00,155.00,8.00,0.00,0.00,0.00,0.00,0.00,10.00,153.00 +New England Deck & Floors Incorporated,,,,,,,,,,, +LABORER: CEMENT FINISHER TENDER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,104.00,8.00,0.00,96.00,0.00,0.00,0.00,0.00,8.00,96.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,8.00,0.00,96.00,0.00,0.00,0.00,0.00,8.00,96.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,240.00,144.00,0.00,96.00,0.00,0.00,0.00,0.00,8.00,232.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,144.00,0.00,96.00,0.00,0.00,0.00,0.00,8.00,232.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +PIPEFITTER & STEAMFITTER,Journey,968.00,968.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,968.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,968.00,968.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,968.00 +Total for Contractor,Journey,968.00,968.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,968.00 +"",Apprentice,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.16 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,120.00",968.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,"1,120.00" +"Safway Services LLC, Inc.",,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +MECHANICS MAINTENANCE,Journey,377.00,377.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,377.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,377.00,377.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,377.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",397.00,"397.00 0.000.000.000.000.00","0.000.00 397.00",,,,,,,, +"",,,,,,,,,,0.00,397.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,397.00,397.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,397.00 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,332.00,332.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,332.00 +"",Apprentice,290.00,0.00,141.00,149.00,0.00,0.00,0.00,0.00,0.00,290.00 +"",A/J Ratio,0.87,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.87 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,622.00,332.00,141.00,149.00,0.00,0.00,0.00,0.00,0.00,622.00 +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,66.00,0.00,0.00,66.00,0.00,0.00,0.00,0.00,0.00,66.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,66.00,0.00,0.00,66.00,0.00,0.00,0.00,0.00,0.00,66.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,430.00,364.00,0.00,66.00,0.00,0.00,0.00,0.00,0.00,430.00 +"",Apprentice,290.00,0.00,141.00,149.00,0.00,0.00,0.00,0.00,0.00,290.00 +"",A/J Ratio,0.67,0.00,0.00,2.26,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,720.00,364.00,141.00,215.00,0.00,0.00,0.00,0.00,0.00,720.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,447.50,447.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,447.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,447.50,447.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,447.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",447.50,"447.50 0.000.000.000.000.00","0.000.00 447.50",,,,,,,, +"",,,,,,,,,,0.00,447.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,447.50,447.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,447.50 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,23.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,23.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00,0.00 +IRONWORKER/WELDER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,80.00,33.00,9.00,38.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,33.00,9.00,38.00,0.00,0.00,0.00,0.00,0.00,80.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",138.00,"91.00 9.0038.000.000.000.00","0.000.00 138.00",,,,,,,, +"",,,,,,,,,,0.00,138.00 +"",Apprentice,23.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00,0.00 +"",A/J Ratio,0.17,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.00,114.00,9.00,38.00,0.00,0.00,0.00,0.00,23.00,138.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,892.00","1,607.00",117.00,168.00,0.00,0.00,0.00,0.00,0.00,"1,892.00" +"",Apprentice,"1,114.00",833.00,0.00,281.00,0.00,0.00,0.00,0.00,0.00,"1,114.00" +"",A/J Ratio,0.59,0.52,0.00,1.67,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,006.00","2,440.00",117.00,449.00,0.00,0.00,0.00,0.00,0.00,"3,006.00" +TELECOMMUNICATION TECHNICIAN,Journey,605.75,445.75,40.00,0.00,120.00,0.00,0.00,0.00,0.00,605.75 +Apprentice,99.00,99.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,99.00, +A/J Ratio,0.16,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.16, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,704.75,544.75,40.00,0.00,120.00,0.00,0.00,0.00,0.00,704.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,497.75","2,052.75 157.00168.00120.000.000.00","0.000.00 2,497.75",,,,,,,, +"",,,,,,,,,0.00,"2,497.75", +Apprentice,"1,213.00",932.00,0.00,281.00,0.00,0.00,0.00,0.00,0.00,"1,213.00", +A/J Ratio,0.49,0.45,0.00,1.67,0.00,0.00,0.00,0.00,0.00,0.49, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"3,710.75","2,984.75",157.00,449.00,120.00,0.00,0.00,0.00,0.00,"3,710.75", +"West Floor Covering, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +MARBLE & TILE FINISHERS,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,0.00,4.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,384.00,384.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,384.00 +"",Apprentice,176.00,168.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",A/J Ratio,0.46,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.46 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,560.00,552.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,560.00 +Total for Contractor,Journey,384.00,384.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,384.00,, +Apprentice,176.00,168.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,176.00, +A/J Ratio,0.46,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.46, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,560.00,552.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,560.00, +Total Journey Hours,"17,062.50","15,080.00",402.00,"1,261.50",120.00,0.00,199.00,0.00,177.00,"16,885.50", +Total Apprentice Hours,"3,135.50","2,085.50",240.00,788.00,22.00,0.00,0.00,0.00,188.00,"2,947.50", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"20,198.00","17,165.50",642.00,"2,049.50",142.00,0.00,199.00,0.00,365.00,"19,833.00", +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"E. Amanti & Sons, Inc",,,,,,,,,,, +SHEETMETAL WORKER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,0.00,3.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total Journey Hours,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,103.00,103.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,103.00 +"",A/J Ratio,2.10,2.10,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.10 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",49.00,"49.00 0.000.000.000.000.00","0.000.00 49.00",,,,,,,, +"",,,,,,,,,,0.00,49.00 +"",Apprentice,103.00,103.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,103.00 +"",A/J Ratio,2.10,2.10,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.10 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,134.50,134.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,134.50,134.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.50 +Total for Contractor,Journey,134.50,134.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,134.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,134.50,134.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.50 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +EQUIPMENT OPERATOR (Class B CDL),Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Total for Contractor,Journey,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,151.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.50 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +Total Journey Hours,464.00,464.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,464.00, +Total Apprentice Hours,103.00,103.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,103.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,567.00,567.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,567.00, diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJan2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJan2019.csv new file mode 100644 index 00000000..61202f61 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJan2019.csv @@ -0,0 +1,1892 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,101.00,7.50,0.00,93.50,0.00,0.00,0.00,0.00,0.00,101.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,101.00,7.50,0.00,93.50,0.00,0.00,0.00,0.00,0.00,101.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",101.00,"7.50 0.0093.500.000.000.00","0.000.00 101.00",,,,,,,, +"",,,,,,,,0.00,101.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,101.00,7.50,0.00,93.50,0.00,0.00,0.00,0.00,0.00,101.00, +Total Journey Hours,101.00,7.50,0.00,93.50,0.00,0.00,0.00,0.00,0.00,101.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,101.00,7.50,0.00,93.50,0.00,0.00,0.00,0.00,0.00,101.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",15.50,"15.50 0.000.000.000.000.00","0.000.00 15.50",,,,,,,, +"",,,,,,,,,,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",A/J Ratio,0.19,0.19,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.19 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +Total for Contractor,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,26.00 +"",Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",A/J Ratio,0.19,0.19,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.19 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Eastfield Glass Co,. Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,4.50,1.50,0.00,3.00,0.00,0.00,0.00,0.00,0.00,4.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.50,1.50,0.00,3.00,0.00,0.00,0.00,0.00,0.00,4.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.50,"1.50 0.003.000.000.000.00","0.000.00 4.50",,,,,,,, +"",,,,,,,,,0.00,4.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.50,1.50,0.00,3.00,0.00,0.00,0.00,0.00,0.00,4.50 +"Kapiloff's Glass, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,15.02,15.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.02 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.02,15.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.02 +Total for Contractor,Journey,15.02,15.02,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,15.02,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.02,15.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.02, +"New England Door Closer,Inc,",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +LABORER,Journey,183.00,183.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,183.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,183.00,183.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,183.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",351.00,"351.00 0.000.000.000.000.00","0.000.00 351.00",,,,,,,, +"",,,,,,,,,0.00,351.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,351.00,351.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,351.00, +Palma Inc.,,,,,,,,,,, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00 +LABORER,Journey,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +Total for Contractor,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,222.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,0.00,2.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,31.88,24.56,0.00,0.00,0.00,0.00,0.00,7.32,0.00,31.88 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.88,24.56,0.00,0.00,0.00,0.00,0.00,7.32,0.00,31.88 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",31.88,"24.56 0.000.000.000.000.00","7.320.00 31.88",,,,,,,, +"",,,,,,,,,,0.00,31.88 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.88,24.56,0.00,0.00,0.00,0.00,0.00,7.32,0.00,31.88 +"Saltbox Millwork , LLC",,,,,,,,,,, +CARPENTER,Journey,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.50 +Total for Contractor,Journey,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,104.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.50,104.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.50 +"Stem Solutions, LLC",,,,,,,,,,, +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +Total for Contractor,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,82.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,924.40,914.08,0.00,3.00,0.00,0.00,0.00,7.32,0.00,924.40 +Total Apprentice Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,929.40,919.08,0.00,3.00,0.00,0.00,0.00,7.32,0.00,929.40 +"Project Name: DCP1908 OM1 C Job Order Contract for General Contractor Services – Central Region Project Code: DCP1908 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +PIPEFITTER & STEAMFITTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,0.00,20.00, +Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: DCP1908 OM1 C Job Order Contract for General Contractor Services – Central Region Project Code: DCP1908 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +Total Apprentice Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Charles Services & Equipment,,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,0.00,4.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"United Civil, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,0.00,2.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +Total Journey Hours,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH0902 EC1 C Taunton State Hospital Energy Project Project Code: DMH0902 EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",165.00,"165.00 0.000.000.000.000.00","0.000.00 165.00",,,,,,,, +"",,,,,,,,,,0.00,165.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,551.00,503.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,551.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,551.00,503.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,551.00 +Total for Contractor,Journey,551.00,503.00,48.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,551.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,551.00,503.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,551.00, +Total Journey Hours,716.00,668.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,716.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,716.00,668.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,716.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +City Crane Corp.,,,,,,,,,,, +OPERATING ENGINEERS,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Hartin Welding,,,,,,,,,,, +IRONWORKER/WELDER,Journey,284.00,284.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,284.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,284.00,284.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,284.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,284.00,284.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,284.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,284.00,284.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,284.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.50,"10.50 0.000.000.000.000.00","0.000.00 10.50",,,,,,,, +"",,,,,,,,0.00,10.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50, +Total Journey Hours,324.50,324.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,324.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,324.50,324.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,324.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +PLUMBERS & GASFITTERS,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +SHEETMETAL WORKER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Total for Contractor,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,7.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +Total Journey Hours,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00 +PIPEFITTER & STEAMFITTER,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +Total for Contractor,Journey,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,95.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00 +LABORER,Journey,91.50,91.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,91.50,91.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.50, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +SHEETMETAL WORKER,Journey,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +Total for Contractor,Journey,143.50,143.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,143.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,143.50,143.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.50 +"Lizotte Glass, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,11.00,0.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,11.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,0.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,11.00,0.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,0.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,11.00 +"SNE Building Systems, Inc",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"7.00 0.000.000.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,,,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Witch Enterprises Inc.,,,,,,,,,,, +LABORER,Journey,40.00,14.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,14.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,40.00,14.00,0.00,26.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,14.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,479.00,442.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,479.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,479.00,442.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,479.00 +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +LABORER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +PIPEFITTER & STEAMFITTER,Journey,107.50,107.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.50,107.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.50 +PLUMBERS & GASFITTERS,Journey,37.50,37.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.50,37.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.50 +SHEETMETAL WORKER,Journey,225.50,225.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,225.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,225.50,225.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,225.50, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,396.50,396.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,396.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,396.50,396.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,396.50 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",160.00,"160.00 0.000.000.000.000.00","0.000.00 160.00",,,,,,,, +"",,,,,,,,,,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +MARBLE & TILE FINISHERS,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,497.50,497.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,497.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,497.50,497.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,497.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +MARBLE- TILE-TERRAZZO MECHANIC,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",497.50,"497.50 0.000.000.000.000.00","0.000.00 497.50",,,,,,,, +"",,,,,,,,,,0.00,497.50 +"",Apprentice,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00,32.00 +"",A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.06 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,536.50,536.50,0.00,0.00,0.00,0.00,0.00,0.00,7.00,529.50 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Total for Contractor,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,576.00,576.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,576.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,576.00,576.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,576.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,576.00,576.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,576.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,576.00,576.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,576.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,272.00,136.00,0.00,0.00,0.00,0.00,136.00,0.00,0.00,272.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,272.00,136.00,0.00,0.00,0.00,0.00,136.00,0.00,0.00,272.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,126.00,126.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,126.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,126.00,126.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,126.00 +Total for Contractor,Journey,398.00,262.00,0.00,0.00,0.00,0.00,136.00,0.00,, +"",,,,,,,,,,0.00,398.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,398.00,262.00,0.00,0.00,0.00,0.00,136.00,0.00,0.00,398.00 +Industrial Mechanical Insulation,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +PAINTER BRUSH NEW,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,200.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,216.00,216.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,216.00 +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +Skyline Drywall Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH,REPAINT)",Journey,148.00,0.00,0.00,148.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,148.00,0.00,0.00,148.00,0.00,0.00,0.00,0.00,0.00,148.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",148.00,"0.00 0.00148.000.000.000.00","0.000.00 148.00",,,,,,,, +"",,,,,,,,,0.00,148.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,148.00,0.00,0.00,148.00,0.00,0.00,0.00,0.00,0.00,148.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,106.00,103.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,103.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +Total for Contractor,Journey,106.00,103.00,3.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,106.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,106.00,103.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00, +Synergy Electrical Systems LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",116.00,"116.00 0.000.000.000.000.00","0.000.00 116.00",,,,,,,, +"",,,,,,,,,,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Titan Roofing, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,209.00,176.50,32.50,0.00,0.00,0.00,0.00,0.00,0.00,209.00 +"",Apprentice,83.00,64.00,0.00,19.00,0.00,0.00,0.00,0.00,0.00,83.00 +"",A/J Ratio,0.40,0.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.40 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,292.00,240.50,32.50,19.00,0.00,0.00,0.00,0.00,0.00,292.00 +SHEETMETAL WORKER,Journey,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +"",Apprentice,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +"",A/J Ratio,0.85,0.85,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.85 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.00 +Total for Contractor,Journey,295.00,262.50,32.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,295.00 +"",Apprentice,156.00,137.00,0.00,19.00,0.00,0.00,0.00,0.00,0.00,156.00 +"",A/J Ratio,0.53,0.52,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.53 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,451.00,399.50,32.50,19.00,0.00,0.00,0.00,0.00,0.00,451.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,772.00,655.50,0.00,116.50,0.00,0.00,0.00,0.00,0.00,772.00 +"",Apprentice,287.00,287.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,287.00 +"",A/J Ratio,0.37,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,059.00",942.50,0.00,116.50,0.00,0.00,0.00,0.00,0.00,"1,059.00" +TELECOMMUNICATION TECHNICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,780.00,663.50,0.00,116.50,0.00,0.00,0.00,0.00,0.00,780.00 +Apprentice,295.00,287.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,295.00, +A/J Ratio,0.38,0.43,0.00,0.07,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,075.00",950.50,0.00,124.50,0.00,0.00,0.00,0.00,0.00,"1,075.00", +Total Journey Hours,"4,018.00","3,582.00",35.50,264.50,0.00,0.00,136.00,0.00,0.00,"4,018.00", +Total Apprentice Hours,506.00,479.00,0.00,27.00,0.00,0.00,0.00,0.00,7.00,499.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"4,524.00","4,061.00",35.50,291.50,0.00,0.00,136.00,0.00,7.00,"4,517.00", +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,12.00,8.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,8.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"8.00 0.004.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,0.00,12.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,8.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,12.00,8.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,12.00,8.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,222.00,212.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,222.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,222.00,212.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,222.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",222.00,"212.00 0.0010.000.000.000.00","0.000.00 222.00",,,,,,,, +"",,,,,,,,0.00,222.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,222.00,212.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,222.00, +Total Journey Hours,222.00,212.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,222.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,222.00,212.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,222.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,47.50,39.50,0.00,0.00,8.00,0.00,0.00,0.00,0.00,47.50 +"",Apprentice,20.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",A/J Ratio,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.42 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.50,39.50,20.00,0.00,8.00,0.00,0.00,0.00,0.00,67.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",47.50,"39.50 0.000.008.000.000.00","0.000.00 47.50",,,,,,,, +"",,,,,,,,,,0.00,47.50 +"",Apprentice,20.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",A/J Ratio,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.42 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.50,39.50,20.00,0.00,8.00,0.00,0.00,0.00,0.00,67.50 +"DMH Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.50 +"",Apprentice,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.50 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +Total for Contractor,Journey,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,78.50 +"",Apprentice,78.50,78.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.50 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +Gleeson Powers,,,,,,,,,,, +CARPENTER,Journey,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +SHEETMETAL WORKER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"Mill City Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,168.25,168.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,168.25,168.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.25, +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,168.25,168.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.25,168.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.25 +"RJ Forbes Painting Contractor, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH,REPAINT)",Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"South Dartmouth Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,10.00,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,12.00,7.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,7.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,48.00,32.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.50,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,56.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"32.00 0.0016.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.50,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,56.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Thermo-Dynamics International, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,66.00,58.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,58.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +Total for Contractor,Journey,66.00,58.00,8.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,66.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,66.00,58.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00, +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,500.25,439.25,37.00,16.00,8.00,0.00,0.00,0.00,0.00,500.25 +Total Apprentice Hours,146.50,126.50,20.00,0.00,0.00,0.00,0.00,0.00,0.00,146.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,646.75,565.75,57.00,16.00,8.00,0.00,0.00,0.00,0.00,646.75 +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",17.00,"17.00 0.000.000.000.000.00","0.000.00 17.00",,,,,,,, +"",,,,,,,,,,0.00,17.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDF1401E EC1 C Sheriff's Department Franklin Energy/Water Design/Build Project Project Code: SDF1401E EC1",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +LK Sheetmetal,,,,,,,,,,,, +HVAC (DUCTWORK),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +SHEETMETAL WORKER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Millennium Builders, Inc.",,,,,,,,,,,, +CARPENTER,Journey,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",134.00,"134.00 0.000.000.000.000.00","0.000.00 134.00",,,,,,,,, +"",,,,,,,,,0.00,134.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00,, +"0.000.00 134.00", +0.00,134.00 +"Project Name: SDF1401E EC1 C Sheriff's Department Franklin Energy/Water Design/Build Project Project Code: SDF1401E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,134.44,0.00,0.00,0.00,0.00,0.00,134.44,0.00,0.00,134.44 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,134.44,0.00,0.00,0.00,0.00,0.00,134.44,0.00,0.00,134.44, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,231.91,0.00,0.00,0.00,0.00,0.00,231.91,0.00,0.00,231.91 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,231.91,0.00,0.00,0.00,0.00,0.00,231.91,0.00,0.00,231.91 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",366.35,"0.00 0.000.000.000.00366.35","0.000.00 366.35",,,,,,,, +"",,,,,,,,,,0.00,366.35 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,366.35,0.00,0.00,0.00,0.00,0.00,366.35,0.00,0.00,366.35 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.82,0.82,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.82 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Total for Contractor,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,44.00 +"",Apprentice,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.82,0.82,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.82 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,43.00,0.00,0.00,0.00,0.00,43.00,0.00,0.00,0.00,43.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,43.00,0.00,0.00,0.00,0.00,43.00,0.00,0.00,0.00,43.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,43.00,0.00,0.00,0.00,0.00,43.00,0.00,0.00,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,0.00,0.00,0.00,0.00,43.00,0.00,0.00,0.00,43.00 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,117.00,117.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,117.00 +"",Apprentice,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50 +"",A/J Ratio,0.34,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,156.50,156.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,156.50 +LABORER: CARPENTER TENDER,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Total for Contractor,Journey,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,161.00,, +Apprentice,39.50,39.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.50, +A/J Ratio,0.25,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.50,200.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.50, +Total Journey Hours,626.35,213.00,0.00,4.00,0.00,43.00,366.35,0.00,0.00,626.35, +Total Apprentice Hours,79.50,79.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,705.85,292.50,0.00,4.00,0.00,43.00,366.35,0.00,0.00,705.85, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.00,"0.00 0.0088.000.000.000.00","0.000.00 88.00",,,,,,,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,449.00,449.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,449.00 +"",Apprentice,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,557.00,557.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,557.00 +PIPEFITTER & STEAMFITTER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",473.00,"473.00 0.000.000.000.000.00","0.000.00 473.00",,,,,,,, +"",,,,,,,,,0.00,473.00, +Apprentice,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00, +A/J Ratio,0.23,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,581.00,581.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,581.00, +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,64.00,0.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,0.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,64.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,93.00,0.00,0.00,93.00,0.00,0.00,0.00,0.00,0.00,93.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,0.00,0.00,93.00,0.00,0.00,0.00,0.00,0.00,93.00 +IRONWORKER/WELDER,Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",568.00,"568.00 0.000.000.000.000.00","0.000.00 568.00",,,,,,,, +"",,,,,,,,,0.00,568.00, +"",Apprentice,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,725.00,568.00,0.00,157.00,0.00,0.00,0.00,0.00,0.00,725.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"2,344.50","2,160.50",0.00,184.00,0.00,0.00,0.00,0.00,0.00,"2,344.50" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,344.50","2,160.50",0.00,184.00,0.00,0.00,0.00,0.00,0.00,"2,344.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,608.50,608.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,608.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,608.50,608.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,608.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,953.00","2,769.00 0.00184.000.000.000.00","0.000.00 2,953.00",,,,,,,, +"",,,,,,,,,,0.00,"2,953.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,953.00","2,769.00",0.00,184.00,0.00,0.00,0.00,0.00,0.00,"2,953.00" +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,350.00,350.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,350.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,350.00,350.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,350.00 +ELEVATOR CONSTRUCTOR HELPER,Journey,281.25,281.25,0.00,0.00,0.00,0.00,0.00,0.00,140.00,141.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,281.25,281.25,0.00,0.00,0.00,0.00,0.00,0.00,140.00,141.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",631.25,"631.25 0.000.000.000.000.00","0.00140.00 491.25",,,,,,,, +"",,,,,,,,,140.00,491.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,631.25,631.25,0.00,0.00,0.00,0.00,0.00,0.00,140.00,491.25, +Dimeo Construction Company,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +LABORER,Journey,575.00,463.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,575.00 +"",Apprentice,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,157.00,0.00 +"",A/J Ratio,0.27,0.00,0.00,1.40,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,732.00,463.00,0.00,269.00,0.00,0.00,0.00,0.00,157.00,575.00 +Total for Contractor,Journey,695.00,583.00,0.00,112.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,695.00 +"",Apprentice,157.00,0.00,0.00,157.00,0.00,0.00,0.00,0.00,157.00,0.00 +"",A/J Ratio,0.23,0.00,0.00,1.40,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,852.00,583.00,0.00,269.00,0.00,0.00,0.00,0.00,157.00,695.00 +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,141.50,141.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,141.50,141.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.50 +LABORER,Journey,300.00,300.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,300.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,300.00,300.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,300.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,441.50,441.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,441.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,441.50,441.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,441.50 +"E. Amanti & Sons, Inc",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,960.50,805.00,16.00,139.50,0.00,0.00,0.00,0.00,0.00,960.50 +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.13,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,088.50",933.00,16.00,139.50,0.00,0.00,0.00,0.00,0.00,"1,088.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",960.50,"805.00 16.00139.500.000.000.00","0.000.00 960.50",,,,,,,, +"",,,,,,,,,0.00,960.50, +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.13,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,088.50",933.00,16.00,139.50,0.00,0.00,0.00,0.00,0.00,"1,088.50" +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,388.00,380.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,380.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,388.00,380.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,380.00 +Total for Contractor,Journey,388.00,380.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,8.00,380.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,388.00,380.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,380.00, +Empire Masonry Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,480.00,480.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,480.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,480.00,480.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,480.00 +LABORER: MASON TENDER,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +Total for Contractor,Journey,704.00,704.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,704.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,704.00,704.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,704.00 +"Federal Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +IRONWORKER/WELDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,402.00,398.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,402.00 +"",Apprentice,147.50,82.00,58.50,7.00,0.00,0.00,0.00,0.00,0.00,147.50 +"",A/J Ratio,0.37,0.21,0.00,2.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,549.50,480.50,58.50,10.50,0.00,0.00,0.00,0.00,0.00,549.50 +SHEETMETAL WORKER,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Total for Contractor,Journey,415.00,411.50,0.00,3.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,415.00 +"",Apprentice,147.50,82.00,58.50,7.00,0.00,0.00,0.00,0.00,0.00,147.50 +"",A/J Ratio,0.36,0.20,0.00,2.00,0.00,0.00,0.00,0.00,0.00,0.36 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,562.50,493.50,58.50,10.50,0.00,0.00,0.00,0.00,0.00,562.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,368.00,248.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,368.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,368.00,248.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,368.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,368.00,248.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,368.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,368.00,248.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,368.00 +"H Carr & Sons, Inc",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00 +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,146.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +LABORER,Journey,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,375.00,207.00,0.00,0.00,0.00,0.00,168.00,0.00,0.00,375.00 +"",Apprentice,259.00,259.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,259.00 +"",A/J Ratio,0.69,1.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,634.00,466.00,0.00,0.00,0.00,0.00,168.00,0.00,0.00,634.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",436.00,"268.00 0.000.000.000.00168.00","0.000.00 436.00",,,,,,,, +"",,,,,,,,,,0.00,436.00 +"",Apprentice,259.00,259.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,259.00 +"",A/J Ratio,0.59,0.97,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,695.00,527.00,0.00,0.00,0.00,0.00,168.00,0.00,0.00,695.00 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,160.00,108.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,108.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,160.00 +Total for Contractor,Journey,160.00,108.00,0.00,0.00,0.00,0.00,52.00,0.00,, +"",,,,,,,,,,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,108.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,160.00 +"Lymo Construction Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,834.50,658.50,0.00,120.00,0.00,56.00,0.00,0.00,0.00,834.50 +Apprentice,261.00,261.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.00, +A/J Ratio,0.31,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,095.50",919.50,0.00,120.00,0.00,56.00,0.00,0.00,0.00,"1,095.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,834.50,658.50,0.00,120.00,0.00,56.00,0.00,0.00,0.00,834.50 +"",Apprentice,261.00,261.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.00 +"",A/J Ratio,0.31,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,095.50",919.50,0.00,120.00,0.00,56.00,0.00,0.00,0.00,"1,095.50" +New England Deck & Floors Incorporated,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,4.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"0.00 0.004.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,4.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,130.00,18.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.00,18.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,130.00 +PIPEFITTER & STEAMFITTER,Journey,831.00,831.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,831.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,831.00,831.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,831.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,831.00,831.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,831.00 +"",Apprentice,130.00,18.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",A/J Ratio,0.16,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.16 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,961.00,849.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,961.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +LABORER,Journey,72.00,40.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,0.00 +"",A/J Ratio,1.56,2.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,152.00,0.00,32.00,0.00,0.00,0.00,0.00,112.00,72.00 +Total for Contractor,Journey,240.00,208.00,0.00,32.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,240.00 +"",Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,0.00 +"",A/J Ratio,0.47,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,352.00,320.00,0.00,32.00,0.00,0.00,0.00,0.00,112.00,240.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +MECHANICS MAINTENANCE,Journey,366.50,366.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,366.50,366.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,366.50,366.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,366.50,366.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,309.00,309.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,309.00 +"",Apprentice,100.00,0.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",A/J Ratio,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,409.00,309.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,409.00 +LABORER,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00,8.00 +Total for Contractor,Journey,348.00,348.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,31.00,317.00 +"",Apprentice,100.00,0.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",A/J Ratio,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,448.00,348.00,100.00,0.00,0.00,0.00,0.00,0.00,31.00,417.00 +"The Trinity Construction Group, LLC",,,,,,,,,,, +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,511.00,511.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,511.00 +"",Apprentice,66.50,66.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.50 +"",A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,577.50,577.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,577.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",511.00,"511.00 0.000.000.000.000.00","0.000.00 511.00",,,,,,,, +"",,,,,,,,,,0.00,511.00 +"",Apprentice,66.50,66.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.50 +"",A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,577.50,577.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,577.50 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,7.50,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,7.50,0.00 +IRONWORKER/WELDER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,82.50,48.00,0.00,34.50,0.00,0.00,0.00,0.00,0.00,82.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,82.50,48.00,0.00,34.50,0.00,0.00,0.00,0.00,0.00,82.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",210.50,"176.00 0.0034.500.000.000.00","0.000.00 210.50",,,,,,,, +"",,,,,,,,,,0.00,210.50 +"",Apprentice,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,7.50,0.00 +"",A/J Ratio,0.04,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,218.00,183.50,0.00,34.50,0.00,0.00,0.00,0.00,7.50,210.50 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,999.75","1,768.25",104.00,127.50,0.00,0.00,0.00,0.00,0.00,"1,999.75" +"",Apprentice,"1,108.00",836.00,0.00,272.00,0.00,0.00,0.00,0.00,0.00,"1,108.00" +"",A/J Ratio,0.55,0.47,0.00,2.13,0.00,0.00,0.00,0.00,0.00,0.55 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,107.75","2,604.25",104.00,399.50,0.00,0.00,0.00,0.00,0.00,"3,107.75" +TELECOMMUNICATION TECHNICIAN,Journey,702.50,550.50,72.00,0.00,80.00,0.00,0.00,0.00,0.00,702.50 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.02,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,718.50,566.50,72.00,0.00,80.00,0.00,0.00,0.00,0.00,718.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,702.25","2,318.75 176.00127.5080.000.000.00","0.000.00 2,702.25",,,,,,,, +"",,,,,,,,,0.00,"2,702.25", +Apprentice,"1,124.00",852.00,0.00,272.00,0.00,0.00,0.00,0.00,0.00,"1,124.00", +A/J Ratio,0.42,0.37,0.00,2.13,0.00,0.00,0.00,0.00,0.00,0.42, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"3,826.25","3,170.75",176.00,399.50,80.00,0.00,0.00,0.00,0.00,"3,826.25", +"Worcester Air Conditioning, LLC",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,318.00,318.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,318.00 +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,358.00,358.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,358.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",318.00,"318.00 0.000.000.000.000.00","0.000.00 318.00",,,,,,,, +"",,,,,,,,,0.00,318.00, +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,358.00,358.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,358.00, +Total Journey Hours,"15,962.00","14,433.00",312.00,861.00,80.00,56.00,220.00,0.00,179.00,"15,783.00", +Total Apprentice Hours,"2,797.50","1,934.00",158.50,705.00,0.00,0.00,0.00,0.00,276.50,"2,521.00", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"18,759.50","16,367.00",470.50,"1,566.00",80.00,56.00,220.00,0.00,455.50,"18,304.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,0.00,2.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +Total Journey Hours,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +Total Apprentice Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJuly2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJuly2019.csv new file mode 100644 index 00000000..6344d0e1 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJuly2019.csv @@ -0,0 +1,2583 @@ +"Project Name: AEP1801E UT1 C Utility Vendor Contract- DCR- Statewide Project Code: AEP1801E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Jacqueline Electric and Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +LABORER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",9.00,"9.00 0.000.000.000.000.00","0.000.00 9.00",,,,,,,, +"",,,,,,,,0.00,9.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +Total Journey Hours,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"S&F Concrete Contractors, Inc.",,,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,42.50,34.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,42.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,42.50,34.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,42.50, +EQUIPMENT OPERATOR (Class B CDL),Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +LABORER,Journey,25.50,17.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,25.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,25.50,17.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,25.50, +Total for Contractor,Journey,69.00,52.00,0.00,17.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,69.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,69.00,52.00,0.00,17.00,0.00,0.00,0.00,0.00,0.00,69.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,524.50,484.50,40.00,0.00,0.00,0.00,0.00,0.00,0.00,524.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,524.50,484.50,40.00,0.00,0.00,0.00,0.00,0.00,0.00,524.50,, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,120.50,0.00,120.50,0.00,0.00,0.00,0.00,0.00,0.00,120.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,120.50,0.00,120.50,0.00,0.00,0.00,0.00,0.00,0.00,120.50, +LABORER,Journey,"1,092.50","1,092.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,092.50", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,092.50","1,092.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,092.50", +Total for Contractor,Journey,"1,737.50","1,577.00",160.50,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,0.00,"1,737.50",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,"1,737.50","1,577.00",160.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,737.50",, +Total Journey Hours,"1,806.50","1,629.00",160.50,17.00,0.00,0.00,0.00,0.00,0.00,"1,806.50",, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,"1,806.50","1,629.00",160.50,17.00,0.00,0.00,0.00,0.00,0.00,"1,806.50",, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",21.00,"21.00 0.000.000.000.000.00","0.000.00 21.00",,,,,,,, +"",,,,,,,,,,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,16.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,16.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,48.00,16.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,16.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Clearview Cleaning , Inc.",,,,,,,,,,, +LABORER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00,6.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.006.00 6.00",,,,,,,, +"",,,,,,,,,6.00,6.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00,6.00 +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,2.00,0.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,0.00,0.00,0.00,2.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,2.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,0.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,2.00, +Crestview Construction & Trucking Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.50,"5.50 0.000.000.000.000.00","0.000.00 5.50",,,,,,,, +"",,,,,,,,,,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +Total for Contractor,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +Harris Environmental Systems,,,,,,,,,,, +CARPENTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.50,"3.50 0.000.000.000.000.00","0.000.00 3.50",,,,,,,, +"",,,,,,,,,0.00,3.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"Intelligent Signage, Inc",,,,,,,,,,, +CARPENTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,6.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"King Painting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,38.00,6.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,6.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,38.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.00,"6.50 0.0031.500.000.000.00","0.000.00 38.00",,,,,,,, +"",,,,,,,,,,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,6.50,0.00,31.50,0.00,0.00,0.00,0.00,0.00,38.00 +"Ondrick Materials & Recycling, LLC",,,,,,,,,,, +DRIVER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +EQUIPMENT OPERATOR (Class A CDL),Journey,12.50,7.50,2.50,2.50,0.00,0.00,0.00,0.00,0.00,12.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.50,7.50,2.50,2.50,0.00,0.00,0.00,0.00,0.00,12.50 +LABORER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,25.50,20.50,2.50,2.50,0.00,0.00,0.00,0.00,0.00,25.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.50,20.50,2.50,2.50,0.00,0.00,0.00,0.00,0.00,25.50 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +LABORER,Journey,311.00,311.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,311.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,311.00,311.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,311.00 +Total for Contractor,Journey,323.00,323.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,323.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,323.00,323.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,323.00 +Palma Inc.,,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,9.00,0.00,0.00,0.00,0.00,0.00,9.00,0.00,0.00,9.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,9.00,0.00,0.00,0.00,0.00,0.00,9.00,0.00,0.00,9.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,9.00,0.00,0.00,0.00,0.00,0.00,9.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,0.00,0.00,0.00,0.00,0.00,9.00,0.00,0.00,9.00 +Pioneer Landscapes,,,,,,,,,,, +LABORER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.50,"7.50 0.000.000.000.000.00","0.000.00 7.50",,,,,,,, +"",,,,,,,,,0.00,7.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +SALAMON FLOORING INC,,,,,,,,,,, +FLOORCOVERER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Total for Contractor,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,7.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,6.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"0.00 0.006.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,6.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.25 +"",Apprentice,6.25,0.00,6.25,0.00,0.00,0.00,0.00,0.00,0.00,6.25 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.50,6.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,12.50 +Total for Contractor,Journey,6.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.25 +"",Apprentice,6.25,0.00,6.25,0.00,0.00,0.00,0.00,0.00,0.00,6.25 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.50,6.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,12.50 +"Ultimate Construction, LLC",,,,,,,,,,, +CARPENTER,Journey,2.00,0.00,0.00,0.00,0.00,0.00,2.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,0.00,0.00,0.00,0.00,0.00,2.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,2.00,0.00,0.00,0.00,0.00,0.00,2.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,0.00,0.00,0.00,2.00,0.00,0.00,2.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,37.50,37.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,37.50,37.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",37.50,"37.50 0.000.000.000.000.00","0.000.00 37.50",,,,,,,, +"",,,,,,,,0.00,37.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,37.50,37.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.50, +Total Journey Hours,581.75,494.25,34.50,40.00,2.00,0.00,11.00,0.00,6.00,575.75, +Total Apprentice Hours,6.25,0.00,6.25,0.00,0.00,0.00,0.00,0.00,0.00,6.25, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,588.00,494.25,40.75,40.00,2.00,0.00,11.00,0.00,6.00,582.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"24.00 0.008.000.000.000.00","0.008.00 24.00",,,,,,,, +"",,,,,,,,8.00,24.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00, +Total Journey Hours,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM2 C Job Order Contract For General Contractor Services Project Code: DCP1907 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ONE SOURCE CONSTRUCTION, LLC",,,,,,,,,,, +CARPENTER,Journey,60.30,49.30,0.00,11.00,0.00,0.00,0.00,0.00,0.00,60.30 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.30,49.30,0.00,11.00,0.00,0.00,0.00,0.00,0.00,60.30 +ELECTRICIAN,Journey,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50 +Total for Contractor,Journey,84.80,73.80,0.00,11.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,84.80,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,84.80,73.80,0.00,11.00,0.00,0.00,0.00,0.00,0.00,84.80, +Total Journey Hours,84.80,73.80,0.00,11.00,0.00,0.00,0.00,0.00,0.00,84.80, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,84.80,73.80,0.00,11.00,0.00,0.00,0.00,0.00,0.00,84.80, +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Abatement Pro N Demo, Inc.",,,,,,,,,,, +"LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER",Journey,75.00,0.00,0.00,75.00,0.00,0.00,0.00,0.00,0.00,75.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,0.00,0.00,75.00,0.00,0.00,0.00,0.00,0.00,75.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",75.00,"0.00 0.0075.000.000.000.00","0.000.00 75.00",,,,,,,, +"",,,,,,,,0.00,75.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,0.00,0.00,75.00,0.00,0.00,0.00,0.00,0.00,75.00, +Total Journey Hours,75.00,0.00,0.00,75.00,0.00,0.00,0.00,0.00,0.00,75.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,75.00,0.00,0.00,75.00,0.00,0.00,0.00,0.00,0.00,75.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.00,"144.00 0.000.000.000.000.00","0.000.00 144.00",,,,,,,, +"",,,,,,,,,,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +LABORER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,0.00,3.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"J.C. Cannistraro, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",36.00,"36.00 0.000.000.000.000.00","0.000.00 36.00",,,,,,,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +"",A/J Ratio,0.63,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Total for Contractor,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,49.00 +"",Apprentice,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +"",A/J Ratio,0.63,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +LABORER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Total for Contractor,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,27.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +BULLDOZER/GRADER/SCRAPER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +DRIVER,Journey,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROLLER/SPREADER/MULCHING MACHINE,Journey,64.00,0.00,0.00,64.00,0.00,0.00,0.00,0.00,64.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,0.00,0.00,64.00,0.00,0.00,0.00,0.00,64.00,0.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",309.50,"245.50 0.0064.000.000.000.00","0.0064.00 245.50",,,,,,,, +"",,,,,,,,,,64.00,245.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,309.50,245.50,0.00,64.00,0.00,0.00,0.00,0.00,64.00,245.50 +Tri State Building LLC,,,,,,,,,,, +IRONWORKER/WELDER,Journey,460.00,420.00,0.00,0.00,0.00,0.00,40.00,0.00,40.00,420.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.00,420.00,0.00,0.00,0.00,0.00,40.00,0.00,40.00,420.00 +Total for Contractor,Journey,460.00,420.00,0.00,0.00,0.00,0.00,40.00,0.00,, +"",,,,,,,,,,40.00,420.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.00,420.00,0.00,0.00,0.00,0.00,40.00,0.00,40.00,420.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,154.00,154.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,154.00,154.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,626.00,618.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,626.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,626.00,618.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,626.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",780.00,"772.00 0.008.000.000.000.00","0.000.00 780.00",,,,,,,, +"",,,,,,,,,0.00,780.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,780.00,772.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,780.00, +Total Journey Hours,"1,808.50","1,696.50",0.00,72.00,0.00,0.00,40.00,0.00,104.00,"1,704.50", +Total Apprentice Hours,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,839.50","1,727.50",0.00,72.00,0.00,0.00,40.00,0.00,104.00,"1,735.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,475.50,475.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,475.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,475.50,475.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,475.50 +Total for Contractor,Journey,475.50,475.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,475.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,475.50,475.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,475.50 +"Lanco Scaffolding, Inc.",,,,,,,,,,, +CARPENTER,Journey,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,0.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,176.00,0.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,0.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",312.00,"0.00 0.00312.000.000.000.00","0.000.00 312.00",,,,,,,, +"",,,,,,,,,0.00,312.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,312.00,0.00,0.00,312.00,0.00,0.00,0.00,0.00,0.00,312.00, +Total Journey Hours,789.50,477.50,0.00,312.00,0.00,0.00,0.00,0.00,0.00,789.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,789.50,477.50,0.00,312.00,0.00,0.00,0.00,0.00,0.00,789.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Contractors Network, Inc.",,,,,,,,,,, +CARPENTER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +LABORER: CARPENTER TENDER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Systems Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,0.00,11.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ACV Concrete LLC,,,,,,,,,,, +LABORER,Journey,49.00,0.00,0.00,49.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.00,0.00,0.00,49.00,0.00,0.00,0.00,0.00,0.00,49.00 +LABORER: CARPENTER TENDER,Journey,34.00,0.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,0.00,0.00,34.00,0.00,0.00,0.00,0.00,0.00,34.00 +LABORER: MASON TENDER,Journey,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,115.00,0.00,0.00,115.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,115.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.00,0.00,0.00,115.00,0.00,0.00,0.00,0.00,0.00,115.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00 +Apprentice,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00, +A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,346.00,346.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,346.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00 +"",Apprentice,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,346.00,346.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,346.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,139.00,139.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.00 +"",Apprentice,138.50,138.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.50 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,277.50,277.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,277.50 +Total for Contractor,Journey,147.00,147.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,147.00 +"",Apprentice,138.50,138.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.50 +"",A/J Ratio,0.94,0.94,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.94 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,285.50,285.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,285.50 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,568.00,488.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,568.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,568.00,488.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,568.00 +LABORER,Journey,528.00,504.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,528.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,528.00,504.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,528.00 +Total for Contractor,Journey,"1,096.00",992.00,0.00,104.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,096.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,096.00",992.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,"1,096.00" +Door & Security Solutions LLC,,,,,,,,,,, +CARPENTER,Journey,30.72,30.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.72 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,30.72,30.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.72, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,30.72,30.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.72 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.72,30.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.72 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +DRIVER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",17.50,"17.50 0.000.000.000.000.00","0.000.00 17.50",,,,,,,, +"",,,,,,,,,0.00,17.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50, +"William F. Lynch Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +SHEETMETAL WORKER,Journey,237.00,229.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,237.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,237.00,229.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,237.00 +Total for Contractor,Journey,333.00,325.00,0.00,0.00,0.00,0.00,8.00,0.00,, +"",,,,,,,,,0.00,333.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,333.00,325.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,333.00, +Total Journey Hours,"2,217.22","1,990.22",0.00,219.00,0.00,0.00,8.00,0.00,0.00,"2,217.22", +Total Apprentice Hours,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,423.72","2,196.72",0.00,219.00,0.00,0.00,8.00,0.00,0.00,"2,423.72", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",A/J Ratio,0.31,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00 +PIPEFITTER & STEAMFITTER,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +Total for Contractor,Journey,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,174.00,, +Apprentice,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00, +A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.26, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,219.00,219.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,219.00, +Total Journey Hours,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00, +Total Apprentice Hours,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,219.00,219.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,219.00, +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,0.00,40.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.50,"3.50 0.000.000.000.000.00","0.000.00 3.50",,,,,,,, +"",,,,,,,,,,0.00,3.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"Lizotte Glass, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,8.00,4.50,0.00,0.00,3.50,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.50,0.00,0.00,3.50,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,4.50,0.00,0.00,3.50,0.00,0.00,0.00,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,4.50,0.00,0.00,3.50,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,11.50,8.00,0.00,0.00,3.50,0.00,0.00,0.00,0.00,11.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,11.50,8.00,0.00,0.00,3.50,0.00,0.00,0.00,0.00,11.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +andy ramos electric llc,,,,,,,,,,, +ELECTRICIAN,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Professional Fire Systems, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",165.00,"165.00 0.000.000.000.000.00","0.000.00 165.00",,,,,,,, +"",,,,,,,,,0.00,165.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,165.00,165.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.00, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,261.00,261.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.00 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,261.00,261.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.00 +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +SHEETMETAL WORKER,Journey,132.00,132.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,132.00,132.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +Total for Contractor,Journey,135.50,135.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,135.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,135.50,135.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,135.50 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,282.00,282.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,282.00,282.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",282.00,"282.00 0.000.000.000.000.00","0.000.00 282.00",,,,,,,, +"",,,,,,,,,0.00,282.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,282.00,282.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.00, +Authorized Services of New England,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GENERATOR/LIGHTING PLANT/HEATERS,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.50,"5.50 0.000.000.000.000.00","0.000.00 5.50",,,,,,,, +"",,,,,,,,,,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +Ayotte and King for Tile Inc.,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Bay State Building Specialties, INC",,,,,,,,,,, +CARPENTER,Journey,97.00,97.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,97.00 +Apprentice,57.00,33.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00,33.00, +A/J Ratio,0.59,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,154.00,130.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00,130.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,97.00,97.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,97.00 +"",Apprentice,57.00,33.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00,33.00 +"",A/J Ratio,0.59,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,154.00,130.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00,130.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +LABORER: CARPENTER TENDER,Journey,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,256.00,168.00,0.00,88.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,256.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,168.00,0.00,88.00,0.00,0.00,0.00,0.00,0.00,256.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,160.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,160.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,160.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",130.00,"130.00 0.000.000.000.000.00","0.000.00 130.00",,,,,,,, +"",,,,,,,,,0.00,130.00, +Apprentice,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +A/J Ratio,0.05,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +John W. Egan Company Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",101.00,"101.00 0.000.000.000.000.00","0.000.00 101.00",,,,,,,, +"",,,,,,,,,,0.00,101.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,101.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.00 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +Total for Contractor,Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,51.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +Simplex Grinnell LP,,,,,,,,,,, +ELECTRICIAN,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,248.00,224.00,0.00,24.00,0.00,0.00,0.00,0.00,56.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,224.00,0.00,24.00,0.00,0.00,0.00,0.00,56.00,192.00 +Total for Contractor,Journey,248.00,224.00,0.00,24.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,56.00,192.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,248.00,224.00,0.00,24.00,0.00,0.00,0.00,0.00,56.00,192.00, +Synergy Electrical Systems LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",14.00,"14.00 0.000.000.000.000.00","0.000.00 14.00",,,,,,,, +"",,,,,,,,,0.00,14.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +"Titan Roofing, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",Apprentice,6.50,0.00,0.00,6.50,0.00,0.00,0.00,0.00,0.00,6.50 +"",A/J Ratio,1.86,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.86 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,3.50,0.00,6.50,0.00,0.00,0.00,0.00,0.00,10.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.50,"3.50 0.000.000.000.000.00","0.000.00 3.50",,,,,,,, +"",,,,,,,,,0.00,3.50, +"",Apprentice,6.50,0.00,0.00,6.50,0.00,0.00,0.00,0.00,0.00,6.50 +"",A/J Ratio,1.86,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.86 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,3.50,0.00,6.50,0.00,0.00,0.00,0.00,0.00,10.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,335.50,335.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,335.50 +"",Apprentice,136.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,471.50,335.50,136.00,0.00,0.00,0.00,0.00,0.00,0.00,471.50 +TELECOMMUNICATION TECHNICIAN,Journey,110.50,110.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.50 +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,142.50,142.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",446.00,"446.00 0.000.000.000.000.00","0.000.00 446.00",,,,,,,, +"",,,,,,,,0.00,446.00,, +Apprentice,168.00,32.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +A/J Ratio,0.38,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,614.00,478.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,614.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,005.50","1,893.50",0.00,112.00,0.00,0.00,0.00,0.00,64.00,"1,941.50" +Total Apprentice Hours,237.50,71.00,136.00,30.50,0.00,0.00,0.00,0.00,24.00,213.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,243.00","1,964.50",136.00,142.50,0.00,0.00,0.00,0.00,88.00,"2,155.00" +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BG Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",19.00,"19.00 0.000.000.000.000.00","0.000.00 19.00",,,,,,,, +"",,,,,,,,,,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50 +Total for Contractor,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,11.00, +Apprentice,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50, +Total Journey Hours,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00, +Total Apprentice Hours,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,31.50,31.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,6.00,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,6.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"3.00 0.000.003.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,0.00,6.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,6.00, +Total Journey Hours,6.00,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,6.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,6.00,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,146.00,111.00,0.00,3.00,32.00,0.00,0.00,0.00,0.00,146.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,111.00,0.00,3.00,32.00,0.00,0.00,0.00,0.00,146.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",146.00,"111.00 0.003.0032.000.000.00","0.000.00 146.00",,,,,,,, +"",,,,,,,,0.00,146.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,111.00,0.00,3.00,32.00,0.00,0.00,0.00,0.00,146.00, +Total Journey Hours,146.00,111.00,0.00,3.00,32.00,0.00,0.00,0.00,0.00,146.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,146.00,111.00,0.00,3.00,32.00,0.00,0.00,0.00,0.00,146.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,0.00,5.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Journey Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,25.25,25.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.25 +"",Apprentice,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",A/J Ratio,0.59,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.25,40.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",25.25,"25.25 0.000.000.000.000.00","0.000.00 25.25",,,,,,,, +"",,,,,,,,,,0.00,25.25 +"",Apprentice,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",A/J Ratio,0.59,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.25,40.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.25 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,10.79,0.00,0.00,0.00,0.00,0.00,10.79,0.00,0.00,10.79 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.79,0.00,0.00,0.00,0.00,0.00,10.79,0.00,0.00,10.79 +LABORER,Journey,14.29,0.00,0.00,0.00,0.00,0.00,14.29,0.00,0.00,14.29 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,14.29,0.00,0.00,0.00,0.00,0.00,14.29,0.00,0.00,14.29, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",25.08,"0.00 0.000.000.000.0025.08","0.000.00 25.08",,,,,,,, +"",,,,,,,,,0.00,25.08, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.08,0.00,0.00,0.00,0.00,0.00,25.08,0.00,0.00,25.08, +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.50 +ROOFER,Journey,56.00,28.00,0.00,28.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,28.00,0.00,28.00,0.00,0.00,0.00,0.00,0.00,56.00 +Total for Contractor,Journey,65.50,37.50,0.00,28.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,65.50 +"",Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",A/J Ratio,0.43,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.50,65.50,0.00,28.00,0.00,0.00,0.00,0.00,0.00,93.50 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +A/J Ratio,0.48,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.48, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",A/J Ratio,0.48,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.48 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CAISSON & UNDERPINNING LABORER,Journey,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,16.00 +CARPENTER,Journey,25.32,25.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.32 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.32,25.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.32 +Total for Contractor,Journey,41.32,25.32,0.00,0.00,0.00,0.00,0.00,16.00,, +"",,,,,,,,,,0.00,41.32 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.32,25.32,0.00,0.00,0.00,0.00,0.00,16.00,0.00,41.32 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,443.50,443.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,443.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,443.50,443.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,443.50, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,138.00,115.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,115.00,0.00,23.00,0.00,0.00,0.00,0.00,0.00,138.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER: CARPENTER TENDER,Journey,273.50,273.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,265.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,273.50,273.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,265.50 +LABORER: CEMENT FINISHER TENDER,Journey,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",937.00,"914.00 0.0023.000.000.000.00","0.008.00 929.00",,,,,,,, +"",,,,,,,,,8.00,929.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,937.00,914.00,0.00,23.00,0.00,0.00,0.00,0.00,8.00,929.00, +Total Journey Hours,"1,138.15","1,046.07",0.00,51.00,0.00,0.00,25.08,16.00,8.00,"1,130.15", +Total Apprentice Hours,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,202.15","1,110.07",0.00,51.00,0.00,0.00,25.08,16.00,8.00,"1,194.15", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,124.00,4.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,4.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,124.00 +LABORER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Total for Contractor,Journey,188.00,68.00,0.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,188.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,188.00,68.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,188.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,0.00,48.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +Automated Building Systems,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,519.50,519.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,519.50 +"",Apprentice,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,646.50,646.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,646.50 +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,523.50,523.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,523.50 +"",Apprentice,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +"",A/J Ratio,0.24,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,650.50,650.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,650.50 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,426.00,426.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,426.00 +Apprentice,343.00,138.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,343.00, +A/J Ratio,0.81,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.81, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,769.00,564.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,769.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",426.00,"426.00 0.000.000.000.000.00","0.000.00 426.00",,,,,,,, +"",,,,,,,,,0.00,426.00, +Apprentice,343.00,138.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,343.00, +A/J Ratio,0.81,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.81, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,769.00,564.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,769.00, +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +IRONWORKER/WELDER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",312.00,"312.00 0.000.000.000.000.00","0.000.00 312.00",,,,,,,, +"",,,,,,,,,0.00,312.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00, +Clifford & Galvin Contracting,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,"1,749.50","1,584.50",0.00,165.00,0.00,0.00,0.00,0.00,0.00,"1,749.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,749.50","1,584.50",0.00,165.00,0.00,0.00,0.00,0.00,0.00,"1,749.50" +LABORER,Journey,294.50,294.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,294.50,294.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.50 +Total for Contractor,Journey,"2,044.00","1,879.00",0.00,165.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,"2,044.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,044.00","1,879.00",0.00,165.00,0.00,0.00,0.00,0.00,0.00,"2,044.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,16.00,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,16.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,308.00,135.00,0.00,125.00,48.00,0.00,0.00,0.00,0.00,308.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,308.00,135.00,0.00,125.00,48.00,0.00,0.00,0.00,0.00,308.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,348.00,167.00,0.00,125.00,56.00,0.00,0.00,0.00,24.00,324.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,348.00,167.00,0.00,125.00,56.00,0.00,0.00,0.00,24.00,324.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,234.25,234.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,234.25,234.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.25 +ELEVATOR CONSTRUCTOR HELPER,Journey,259.25,259.25,0.00,0.00,0.00,0.00,0.00,0.00,24.00,235.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,259.25,259.25,0.00,0.00,0.00,0.00,0.00,0.00,24.00,235.25 +Total for Contractor,Journey,493.50,493.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,24.00,469.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,493.50,493.50,0.00,0.00,0.00,0.00,0.00,0.00,24.00,469.50 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,783.50,783.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,783.50 +"",Apprentice,161.00,0.00,0.00,161.00,0.00,0.00,0.00,0.00,161.00,0.00 +"",A/J Ratio,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,944.50,783.50,0.00,161.00,0.00,0.00,0.00,0.00,161.00,783.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,011.50","1,011.50 0.000.000.000.000.00","0.000.00 1,011.50",,,,,,,, +"",,,,,,,,,,0.00,"1,011.50" +"",Apprentice,161.00,0.00,0.00,161.00,0.00,0.00,0.00,0.00,161.00,0.00 +"",A/J Ratio,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,172.50","1,011.50",0.00,161.00,0.00,0.00,0.00,0.00,161.00,"1,011.50" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,161.50,161.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,161.50,161.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,161.50 +LABORER,Journey,371.50,307.50,0.00,64.00,0.00,0.00,0.00,0.00,64.00,307.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,371.50,307.50,0.00,64.00,0.00,0.00,0.00,0.00,64.00,307.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",533.00,"469.00 0.0064.000.000.000.00","0.0064.00 469.00",,,,,,,, +"",,,,,,,,,64.00,469.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,533.00,469.00,0.00,64.00,0.00,0.00,0.00,0.00,64.00,469.00, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",Apprentice,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.91,0.91,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.91 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,286.00,286.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,286.00 +Total for Contractor,Journey,158.00,158.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,158.00 +"",Apprentice,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",A/J Ratio,0.86,0.86,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.86 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",240.00,"240.00 0.000.000.000.000.00","0.000.00 240.00",,,,,,,, +"",,,,,,,,,0.00,240.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +"Electrical Engineering & Service Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Emanouil Landscaping,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",168.00,"168.00 0.000.000.000.000.00","0.000.00 168.00",,,,,,,, +"",,,,,,,,,0.00,168.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +ESCS INC,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.00,"38.00 0.000.000.000.000.00","0.000.00 38.00",,,,,,,, +"",,,,,,,,,,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,193.00,193.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,193.00 +"",Apprentice,26.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",A/J Ratio,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.00,193.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,219.00 +Total for Contractor,Journey,193.00,193.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,193.00 +"",Apprentice,26.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",A/J Ratio,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.00,193.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,219.00 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,336.00,296.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,336.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,336.00,296.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,336.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,336.00,296.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,336.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,336.00,296.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,336.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +SPRINKLER FITTER,Journey,167.00,167.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,167.00 +"",Apprentice,178.50,178.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.50 +"",A/J Ratio,1.07,1.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.07 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,345.50,345.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,345.50 +Total for Contractor,Journey,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,215.00 +"",Apprentice,178.50,178.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.50 +"",A/J Ratio,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,393.50,393.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,393.50 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,0.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,7.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,881.00,881.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,881.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,881.00,881.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,881.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",881.00,"881.00 0.000.000.000.000.00","0.000.00 881.00",,,,,,,, +"",,,,,,,,,0.00,881.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,881.00,881.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,881.00 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.00 +"",A/J Ratio,0.71,0.71,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.71 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,341.00,341.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,341.00 +Total for Contractor,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,200.00,, +Apprentice,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.00, +A/J Ratio,0.71,0.71,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.71, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,341.00,341.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,341.00, +"Marguerite Concrete, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +LABORER,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +Total for Contractor,Journey,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,92.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +New England Deck & Floors Incorporated,,,,,,,,,,, +LABORER: CEMENT FINISHER TENDER,Journey,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,360.00,212.00,0.00,148.00,0.00,0.00,0.00,0.00,108.00,252.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,360.00,212.00,0.00,148.00,0.00,0.00,0.00,0.00,108.00,252.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,508.00,360.00,0.00,148.00,0.00,0.00,0.00,0.00,108.00,400.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,508.00,360.00,0.00,148.00,0.00,0.00,0.00,0.00,108.00,400.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,259.00,259.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,259.00 +"",Apprentice,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,331.00,259.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",259.00,"259.00 0.000.000.000.000.00","0.000.00 259.00",,,,,,,, +"",,,,,,,,,,0.00,259.00 +"",Apprentice,72.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,331.00,259.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,152.00,0.00,112.00,40.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,0.00,112.00,40.00,0.00,0.00,0.00,0.00,0.00,152.00 +PIPEFITTER & STEAMFITTER,Journey,348.00,348.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,348.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,348.00,348.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,348.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,348.00,348.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,348.00 +"",Apprentice,152.00,0.00,112.00,40.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,500.00,348.00,112.00,40.00,0.00,0.00,0.00,0.00,0.00,500.00 +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +MECHANICS MAINTENANCE,Journey,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50 +Total for Contractor,Journey,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,206.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,206.50,206.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.50, +"Tavares, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,306.00,293.00,0.00,13.00,0.00,0.00,0.00,0.00,0.00,306.00 +"",Apprentice,96.00,0.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",A/J Ratio,0.31,0.00,0.00,7.38,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,402.00,293.00,0.00,109.00,0.00,0.00,0.00,0.00,0.00,402.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",306.00,"293.00 0.0013.000.000.000.00","0.000.00 306.00",,,,,,,, +"",,,,,,,,,,0.00,306.00 +"",Apprentice,96.00,0.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",A/J Ratio,0.31,0.00,0.00,7.38,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,402.00,293.00,0.00,109.00,0.00,0.00,0.00,0.00,0.00,402.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +LABORER,Journey,52.00,36.50,15.50,0.00,0.00,0.00,0.00,0.00,17.00,35.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,36.50,15.50,0.00,0.00,0.00,0.00,0.00,17.00,35.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",107.00,"91.50 15.500.000.000.000.00","0.0017.00 90.00",,,,,,,, +"",,,,,,,,,17.00,90.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,107.00,91.50,15.50,0.00,0.00,0.00,0.00,0.00,17.00,90.00, +"Valley Communications Systems, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +TELECOMMUNICATION TECHNICIAN,Journey,72.50,72.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.50,72.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.50,"72.50 0.000.000.000.000.00","0.000.00 72.50",,,,,,,, +"",,,,,,,,,,0.00,72.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.50,72.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.50 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,309.00","1,143.00",0.00,166.00,0.00,0.00,0.00,0.00,0.00,"1,309.00" +"",Apprentice,850.00,393.50,0.00,456.50,0.00,0.00,0.00,0.00,151.00,699.00 +"",A/J Ratio,0.65,0.34,0.00,2.75,0.00,0.00,0.00,0.00,0.00,0.53 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,159.00","1,536.50",0.00,622.50,0.00,0.00,0.00,0.00,151.00,"2,008.00" +TELECOMMUNICATION TECHNICIAN,Journey,683.00,434.00,0.00,111.00,138.00,0.00,0.00,0.00,0.00,683.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,683.00,434.00,0.00,111.00,138.00,0.00,0.00,0.00,0.00,683.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,992.00","1,577.00 0.00277.00138.000.000.00","0.000.00 1,992.00",,,,,,,, +"",,,,,,,,,0.00,"1,992.00", +Apprentice,850.00,393.50,0.00,456.50,0.00,0.00,0.00,0.00,151.00,699.00, +A/J Ratio,0.43,0.25,0.00,1.65,0.00,0.00,0.00,0.00,0.00,0.35, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,842.00","1,970.50",0.00,733.50,138.00,0.00,0.00,0.00,151.00,"2,691.00", +"West Floor Covering, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FLOORCOVERER,Journey,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +MARBLE & TILE FINISHERS,Journey,482.00,205.00,0.00,277.00,0.00,0.00,0.00,0.00,0.00,482.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.03,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,498.00,221.00,0.00,277.00,0.00,0.00,0.00,0.00,0.00,498.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,794.50,621.50,0.00,173.00,0.00,0.00,0.00,0.00,0.00,794.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,794.50,621.50,0.00,173.00,0.00,0.00,0.00,0.00,0.00,794.50 +Total for Contractor,Journey,"1,300.50",826.50,0.00,474.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,300.50" +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.01,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,316.50",842.50,0.00,474.00,0.00,0.00,0.00,0.00,0.00,"1,316.50" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +Total Journey Hours,"13,887.00","12,244.50",15.50,"1,426.00",194.00,0.00,7.00,0.00,237.00,"13,650.00", +Total Apprentice Hours,"2,298.50","1,130.00",415.00,753.50,0.00,0.00,0.00,0.00,312.00,"1,986.50", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"16,185.50","13,374.50",430.50,"2,179.50",194.00,0.00,7.00,0.00,549.00,"15,636.50", +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,310.00,196.00,0.00,114.00,0.00,0.00,0.00,0.00,0.00,310.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,310.00,196.00,0.00,114.00,0.00,0.00,0.00,0.00,0.00,310.00 +LABORER,Journey,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +Total for Contractor,Journey,376.00,262.00,0.00,114.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,376.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,376.00,262.00,0.00,114.00,0.00,0.00,0.00,0.00,0.00,376.00 +Crocker Architectural Sheet Metal,,,,,,,,,,, +SHEETMETAL WORKER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,0.00,6.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +TRAC Builders Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +LABORER,Journey,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +Total for Contractor,Journey,360.00,256.00,0.00,104.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,360.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,256.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,360.00 +Yard Works Inc.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,32.50,16.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.50,16.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.50, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,48.50,16.50,0.00,32.00,0.00,0.00,0.00,0.00,0.00,48.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.50,16.50,0.00,32.00,0.00,0.00,0.00,0.00,0.00,48.50, +Total Journey Hours,790.50,540.50,0.00,250.00,0.00,0.00,0.00,0.00,0.00,790.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,790.50,540.50,0.00,250.00,0.00,0.00,0.00,0.00,0.00,790.50, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.00 +"",Apprentice,102.00,0.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,102.00 +"",A/J Ratio,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,142.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,244.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",142.00,"142.00 0.000.000.000.000.00","0.000.00 142.00",,,,,,,, +"",,,,,,,,,,0.00,142.00 +"",Apprentice,102.00,0.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,102.00 +"",A/J Ratio,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,142.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,244.00 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00,104.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00,104.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00,104.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,57.50,57.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,57.50,57.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",57.50,"57.50 0.000.000.000.000.00","0.000.00 57.50",,,,,,,, +"",,,,,,,,,,0.00,57.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,57.50,57.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,309.00,309.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,309.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,309.00,309.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,309.00 +LABORER,Journey,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,65.00,65.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,65.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,374.00,374.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,374.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,374.00,374.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,374.00 +Kenney Masonry,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +LABORER: MASON TENDER,Journey,131.00,131.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,131.00,131.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.00 +Total for Contractor,Journey,293.00,293.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,293.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,293.00,293.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,293.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,34.00,31.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,31.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",110.00,"107.00 0.003.000.000.000.00","0.000.00 110.00",,,,,,,, +"",,,,,,,,,,0.00,110.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,107.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,110.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,8.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,8.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,89.50,89.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.50,89.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",89.50,"89.50 0.000.000.000.000.00","0.000.00 89.50",,,,,,,, +"",,,,,,,,,0.00,89.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.50,89.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.50 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,261.75,162.00,0.00,99.75,0.00,0.00,0.00,0.00,0.00,261.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,261.75,162.00,0.00,99.75,0.00,0.00,0.00,0.00,0.00,261.75 +Total for Contractor,Journey,261.75,162.00,0.00,99.75,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,261.75,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,261.75,162.00,0.00,99.75,0.00,0.00,0.00,0.00,0.00,261.75, +Zap Electric,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",120.00,"120.00 0.000.000.000.000.00","0.000.00 120.00",,,,,,,, +"",,,,,,,,,0.00,120.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +Total Journey Hours,"1,640.75","1,514.00",0.00,118.75,0.00,0.00,8.00,0.00,33.00,"1,607.75", +Total Apprentice Hours,102.00,0.00,0.00,102.00,0.00,0.00,0.00,0.00,0.00,102.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,742.75","1,514.00",0.00,220.75,0.00,0.00,8.00,0.00,33.00,"1,709.75", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,197.50,197.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,197.50,197.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,191.00,191.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,191.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,191.00,191.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,191.00 +Total for Contractor,Journey,388.50,388.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,388.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,388.50,388.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,388.50 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,151.00,151.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,151.00,151.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",151.00,"151.00 0.000.000.000.000.00","0.000.00 151.00",,,,,,,, +"",,,,,,,,,0.00,151.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,151.00,151.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.00, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,0.00,3.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total Journey Hours,542.50,542.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,542.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,542.50,542.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,542.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJune2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJune2019.csv new file mode 100644 index 00000000..9e8c62d5 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportJune2019.csv @@ -0,0 +1,2901 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,29.00,7.00,0.00,22.00,0.00,0.00,0.00,0.00,0.00,29.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.00,7.00,0.00,22.00,0.00,0.00,0.00,0.00,0.00,29.00 +LABORER,Journey,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +Total for Contractor,Journey,72.00,50.00,0.00,22.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,50.00,0.00,22.00,0.00,0.00,0.00,0.00,0.00,72.00 +Rise Engineering,,,,,,,,,,, +GLAZIER,Journey,107.00,0.00,0.00,107.00,0.00,0.00,0.00,0.00,0.00,107.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,107.00,0.00,0.00,107.00,0.00,0.00,0.00,0.00,0.00,107.00, +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,96.00,0.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,96.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,0.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,96.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",203.00,"0.00 0.00203.000.000.000.00","0.000.00 203.00",,,,,,,, +"",,,,,,,,,0.00,203.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,203.00,0.00,0.00,203.00,0.00,0.00,0.00,0.00,0.00,203.00, +Total Journey Hours,275.00,50.00,0.00,225.00,0.00,0.00,0.00,0.00,0.00,275.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,275.00,50.00,0.00,225.00,0.00,0.00,0.00,0.00,0.00,275.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Astro Crane Service,,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,,, +"",,,,,,,,,,0.00,2.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +Chet's Welding Inc.,,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total for Contractor,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"E. Amanti & Sons, Inc",,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Apprentice,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00,, +"0.000.00 2.00", +0.00,2.00 +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,139.00,139.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,139.00,139.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.00, +PLUMBERS & GASFITTERS,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00, +Total for Contractor,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,0.00,222.00,, +"",Apprentice,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"",A/J Ratio,0.01,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,225.00,225.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,225.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,165.50,165.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,165.50,165.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.50, +BACKHOE/FRONT-END LOADER,Journey,667.00,635.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,667.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,667.00,635.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,667.00, +LABORER,Journey,"1,329.00","1,329.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,329.00", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,"1,329.00","1,329.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,329.00",, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Total for Contractor,Journey,"2,161.50","2,129.50",32.00,0.00,0.00,0.00,0.00,0.00,0.00,"2,161.50", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"2,161.50","2,129.50",32.00,0.00,0.00,0.00,0.00,0.00,0.00,"2,161.50", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,98.50,89.50,9.00,0.00,0.00,0.00,0.00,0.00,0.00,98.50, +Apprentice,74.50,31.00,43.50,0.00,0.00,0.00,0.00,0.00,0.00,74.50,, +A/J Ratio,0.76,0.35,4.83,0.00,0.00,0.00,0.00,0.00,0.00,0.76,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,173.00,120.50,52.50,0.00,0.00,0.00,0.00,0.00,0.00,173.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",98.50,"89.50 9.000.000.000.000.00","0.000.00 98.50",,,,,,,,, +"",,,,,,,,0.00,98.50,,, +Apprentice,74.50,31.00,43.50,0.00,0.00,0.00,0.00,0.00,0.00,74.50,, +A/J Ratio,0.76,0.35,4.83,0.00,0.00,0.00,0.00,0.00,0.00,0.76,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,173.00,120.50,52.50,0.00,0.00,0.00,0.00,0.00,0.00,173.00,, +Total Journey Hours,"2,487.00","2,446.00",41.00,0.00,0.00,0.00,0.00,0.00,0.00,"2,487.00",, +Total Apprentice Hours,77.50,34.00,43.50,0.00,0.00,0.00,0.00,0.00,0.00,77.50,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,"2,564.50","2,480.00",84.50,0.00,0.00,0.00,0.00,0.00,0.00,"2,564.50",, +"0.000.00 98.50", +0.00,98.50 +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",13.00,"13.00 0.000.000.000.000.00","0.000.00 13.00",,,,,,,, +"",,,,,,,,,,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.00,62.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,62.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Clearview Cleaning , Inc.",,,,,,,,,,, +LABORER,Journey,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00,72.00 +Total for Contractor,Journey,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,21.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00,72.00 +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,39.50,34.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,39.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.50,34.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,39.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,39.50,34.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,39.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.50,34.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,39.50 +Crestview Construction & Trucking Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +DRIVER / GROUNDMAN CDL,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +LABORER,Journey,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",53.50,"53.50 0.000.000.000.000.00","0.000.00 53.50",,,,,,,, +"",,,,,,,,,0.00,53.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50, +"General Mechanical Contractors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +SHEETMETAL WORKER,Journey,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,27.00,27.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.00 +Total for Contractor,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +Harris Environmental Systems,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +PIPEFITTER & STEAMFITTER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +"",Apprentice,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",A/J Ratio,0.59,0.59,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.59 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.50,"4.50 0.000.000.000.000.00","0.000.00 4.50",,,,,,,, +"",,,,,,,,,0.00,4.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +"Intelligent Signage, Inc",,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"King Painting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,144.50,8.00,0.00,136.50,0.00,0.00,0.00,0.00,0.00,144.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.50,8.00,0.00,136.50,0.00,0.00,0.00,0.00,0.00,144.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.50,"8.00 0.00136.500.000.000.00","0.000.00 144.50",,,,,,,, +"",,,,,,,,,,0.00,144.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.50,8.00,0.00,136.50,0.00,0.00,0.00,0.00,0.00,144.50 +New England Floor & Wall Corp.,,,,,,,,,,, +LABORER,Journey,68.50,53.50,0.00,15.00,0.00,0.00,0.00,0.00,0.00,68.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.50,53.50,0.00,15.00,0.00,0.00,0.00,0.00,0.00,68.50 +Total for Contractor,Journey,68.50,53.50,0.00,15.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,68.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.50,53.50,0.00,15.00,0.00,0.00,0.00,0.00,0.00,68.50 +"Ondrick Materials & Recycling, LLC",,,,,,,,,,, +ASPHALT RAKER,Journey,9.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,9.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,30.75,19.00,0.00,11.75,0.00,0.00,0.00,0.00,5.50,25.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.75,19.00,0.00,11.75,0.00,0.00,0.00,0.00,5.50,25.25 +EQUIPMENT OPERATOR (Class A CDL),Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +LABORER,Journey,57.50,51.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,57.50,51.25,6.25,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +Total for Contractor,Journey,123.25,96.25,15.25,11.75,0.00,0.00,0.00,0.00,, +"",,,,,,,,,5.50,117.75, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,123.25,96.25,15.25,11.75,0.00,0.00,0.00,0.00,5.50,117.75 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +LABORER,Journey,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,380.00,380.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,380.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,380.00,380.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,380.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,24.90,17.40,0.00,0.00,0.00,0.00,0.00,7.50,0.00,24.90 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.90,17.40,0.00,0.00,0.00,0.00,0.00,7.50,0.00,24.90 +"PAINTER / TAPER (BRUSH, NEW)",Journey,12.70,0.00,0.00,0.00,0.00,0.00,0.00,12.70,0.00,12.70 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.70,0.00,0.00,0.00,0.00,0.00,0.00,12.70,0.00,12.70 +Total for Contractor,Journey,37.60,17.40,0.00,0.00,0.00,0.00,0.00,20.20,, +"",,,,,,,,,,0.00,37.60 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.60,17.40,0.00,0.00,0.00,0.00,0.00,20.20,0.00,37.60 +Pioneer Landscapes,,,,,,,,,,, +LABORER,Journey,95.75,95.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,95.75,95.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.75, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,95.75,95.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,95.75,95.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.75 +SALAMON FLOORING INC,,,,,,,,,,, +FLOORCOVERER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,52.00,48.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,52.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,52.00,48.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,52.00 +Total for Contractor,Journey,52.00,48.00,0.00,4.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,52.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,48.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,52.00, +Synergy Electrical Systems LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +"",Apprentice,16.50,11.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50 +"",A/J Ratio,0.94,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.94 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,29.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Total for Contractor,Journey,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,17.50 +"",Apprentice,16.50,11.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50 +"",A/J Ratio,0.94,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.94 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,29.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"Ultimate Construction, LLC",,,,,,,,,,, +CARPENTER,Journey,53.50,34.50,0.00,0.00,0.00,0.00,19.00,0.00,0.00,53.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,53.50,34.50,0.00,0.00,0.00,0.00,19.00,0.00,0.00,53.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,53.50,34.50,0.00,0.00,0.00,0.00,19.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,34.50,0.00,0.00,0.00,0.00,19.00,0.00,0.00,53.50 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,52.00,52.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.15,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",52.00,"52.00 0.000.000.000.000.00","0.000.00 52.00",,,,,,,, +"",,,,,,,,,,0.00,52.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.15,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +Walch & Company Inc.,,,,,,,,,,, +CARPENTER,Journey,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,15.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.50 +LABORER: CARPENTER TENDER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.50 +"Whitehawk Construction Services, Inc.",,,,,,,,,,, +CARPENTER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,0.00,64.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +Total Journey Hours,"1,504.60","1,277.40",15.25,167.25,5.50,0.00,19.00,20.20,26.50,"1,478.10", +Total Apprentice Hours,58.50,53.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,58.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,563.10","1,330.90",20.25,167.25,5.50,0.00,19.00,20.20,26.50,"1,536.60", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J & S Concrete Pumping and Grouting, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,4.00,2.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,2.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,20.00,14.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,14.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,20.00 +Total for Contractor,Journey,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,24.00 +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,114.00,114.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.00 +CEMENT MASONRY/PLASTERING,Journey,5.50,0.00,0.00,5.50,0.00,0.00,0.00,0.00,0.00,5.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.50,0.00,0.00,5.50,0.00,0.00,0.00,0.00,0.00,5.50, +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +HOISTING ENGINEER/CRANES/GRADALLS,Journey,28.00,12.00,0.00,4.00,12.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,12.00,0.00,4.00,12.00,0.00,0.00,0.00,0.00,28.00 +IRONWORKER/WELDER,Journey,16.50,7.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,16.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.50,7.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,16.50 +LABORER,Journey,184.50,72.50,0.00,90.00,22.00,0.00,0.00,0.00,0.00,184.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.50,72.50,0.00,90.00,22.00,0.00,0.00,0.00,0.00,184.50 +Total for Contractor,Journey,348.50,206.00,0.00,108.50,34.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,348.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,348.50,206.00,0.00,108.50,34.00,0.00,0.00,0.00,0.00,348.50, +Total Journey Hours,372.50,222.00,0.00,116.50,34.00,0.00,0.00,0.00,0.00,372.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,372.50,222.00,0.00,116.50,34.00,0.00,0.00,0.00,0.00,372.50, +"Project Name: DCP1907 OM2 C Job Order Contract For General Contractor Services Project Code: DCP1907 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ONE SOURCE CONSTRUCTION, LLC",,,,,,,,,,, +CARPENTER,Journey,42.90,19.30,0.00,23.60,0.00,0.00,0.00,0.00,0.00,42.90 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.90,19.30,0.00,23.60,0.00,0.00,0.00,0.00,0.00,42.90 +ELECTRICIAN,Journey,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,53.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.50 +Total for Contractor,Journey,96.40,72.80,0.00,23.60,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,96.40,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.40,72.80,0.00,23.60,0.00,0.00,0.00,0.00,0.00,96.40, +Total Journey Hours,96.40,72.80,0.00,23.60,0.00,0.00,0.00,0.00,0.00,96.40, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,96.40,72.80,0.00,23.60,0.00,0.00,0.00,0.00,0.00,96.40, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/PLASTER/CEMENT MASON,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00,8.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00,8.00 +BRICK/STONE/ARTIFICIAL MASONRY,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00,8.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,24.00,8.00,16.00,0.00,0.00,0.00,0.00,8.00,40.00 +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",200.00,"200.00 0.000.000.000.000.00","0.000.00 200.00",,,,,,,, +"",,,,,,,,,0.00,200.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,230.00,147.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,230.00 +"",Apprentice,32.00,0.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,262.00,147.00,83.00,0.00,32.00,0.00,0.00,0.00,0.00,262.00 +Total for Contractor,Journey,230.00,147.00,83.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,230.00 +"",Apprentice,32.00,0.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,262.00,147.00,83.00,0.00,32.00,0.00,0.00,0.00,0.00,262.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +Apprentice,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +"",Apprentice,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +"",A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +CEMENT MASONRY/PLASTERING,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +IRONWORKER/WELDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,83.00,46.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,83.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,83.00,46.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,83.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,178.00,141.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,178.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,178.00,141.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,178.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +DRIVER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +Total for Contractor,Journey,214.00,214.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,214.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,214.00,214.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,214.00 +Tri State Building LLC,,,,,,,,,,, +IRONWORKER/WELDER,Journey,204.00,196.00,0.00,0.00,0.00,0.00,8.00,0.00,11.00,193.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,196.00,0.00,0.00,0.00,0.00,8.00,0.00,11.00,193.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,204.00,196.00,0.00,0.00,0.00,0.00,8.00,0.00,11.00,193.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,196.00,0.00,0.00,0.00,0.00,8.00,0.00,11.00,193.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +LABORER,Journey,780.00,780.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,780.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,780.00,780.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,780.00 +Total for Contractor,Journey,980.00,980.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,980.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,980.00,980.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,980.00, +Total Journey Hours,"2,138.00","1,994.00",83.00,53.00,0.00,0.00,8.00,0.00,11.00,"2,127.00", +Total Apprentice Hours,130.00,90.00,8.00,0.00,32.00,0.00,0.00,0.00,8.00,122.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,268.00","2,084.00",91.00,53.00,32.00,0.00,8.00,0.00,19.00,"2,249.00", +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,331.00,331.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,331.00,331.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00 +Total for Contractor,Journey,331.00,331.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,331.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,331.00,331.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00 +"Lanco Scaffolding, Inc.",,,,,,,,,,, +CARPENTER,Journey,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,112.00,0.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,112.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,0.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,112.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",216.00,"0.00 0.00216.000.000.000.00","0.000.00 216.00",,,,,,,, +"",,,,,,,,,0.00,216.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,216.00,0.00,0.00,216.00,0.00,0.00,0.00,0.00,0.00,216.00, +Total Journey Hours,555.00,339.00,0.00,216.00,0.00,0.00,0.00,0.00,0.00,555.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,555.00,339.00,0.00,216.00,0.00,0.00,0.00,0.00,0.00,555.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ACV Concrete LLC,,,,,,,,,,, +CARPENTER,Journey,44.00,0.00,0.00,44.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,0.00,0.00,44.00,0.00,0.00,0.00,0.00,0.00,44.00 +LABORER,Journey,267.00,0.00,0.00,267.00,0.00,0.00,0.00,0.00,0.00,267.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,267.00,0.00,0.00,267.00,0.00,0.00,0.00,0.00,0.00,267.00 +LABORER: CARPENTER TENDER,Journey,139.00,0.00,0.00,139.00,0.00,0.00,0.00,0.00,0.00,139.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,139.00,0.00,0.00,139.00,0.00,0.00,0.00,0.00,0.00,139.00 +LABORER: CEMENT FINISHER TENDER,Journey,36.00,0.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,0.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,36.00 +LABORER: MASON TENDER,Journey,74.00,0.00,0.00,74.00,0.00,0.00,0.00,0.00,0.00,74.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,74.00,0.00,0.00,74.00,0.00,0.00,0.00,0.00,0.00,74.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,560.00,0.00,0.00,560.00,0.00,0.00,0.00,0.00,0.00,560.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,560.00,0.00,0.00,560.00,0.00,0.00,0.00,0.00,0.00,560.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",360.00,"360.00 0.000.000.000.000.00","0.000.00 360.00",,,,,,,, +"",,,,,,,,,0.00,360.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,384.00,384.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,384.00 +Total for Contractor,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,192.00,, +Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,384.00,384.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,384.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +SPRINKLER FITTER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.00,"88.00 0.000.000.000.000.00","0.000.00 88.00",,,,,,,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,168.00,160.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,160.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,168.00 +LABORER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",336.00,"328.00 0.008.000.000.000.00","0.000.00 336.00",,,,,,,, +"",,,,,,,,,0.00,336.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,336.00,328.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,336.00, +Door & Security Solutions LLC,,,,,,,,,,, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,33.36,33.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.36 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.36,33.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.36 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",33.36,"33.36 0.000.000.000.000.00","0.000.00 33.36",,,,,,,, +"",,,,,,,,,,0.00,33.36 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.36,33.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.36 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,209.25,209.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,209.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,209.25,209.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,209.25 +DRIVER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +LABORER,Journey,159.25,159.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,159.25,159.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,374.50,374.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,374.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,374.50,374.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,374.50 +"TC Controls & Services, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,2.75,2.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.75,2.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.75,"2.75 0.000.000.000.000.00","0.000.00 2.75",,,,,,,, +"",,,,,,,,,,0.00,2.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.75,2.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.75 +"William F. Lynch Co., Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +SHEETMETAL WORKER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,192.00,176.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,192.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,192.00,176.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,192.00, +Total Journey Hours,"2,138.61","1,554.61",0.00,568.00,0.00,0.00,16.00,0.00,0.00,"2,138.61", +Total Apprentice Hours,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,330.61","1,746.61",0.00,568.00,0.00,0.00,16.00,0.00,0.00,"2,330.61", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,0.00,40.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +LABORER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.50,"3.50 0.000.000.000.000.00","0.000.00 3.50",,,,,,,, +"",,,,,,,,,0.00,3.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50, +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,102.50,102.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.50,102.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.50 +LABORER: MASON TENDER,Journey,50.50,50.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.50,50.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.50 +Total for Contractor,Journey,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,153.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00, +Total Journey Hours,166.50,166.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,166.50,166.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.50, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +andy ramos electric llc,,,,,,,,,,, +ELECTRICIAN,Journey,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +LABORER,Journey,102.50,102.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.50,102.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.50 +Total for Contractor,Journey,202.50,202.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,202.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,202.50,202.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.50 +"Professional Fire Systems, Inc.",,,,,,,,,,, +"FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY",Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +SPRINKLER FITTER,Journey,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.00, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00, +Total Journey Hours,500.50,500.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,500.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,500.50,500.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,500.50, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +PLUMBERS & GASFITTERS,Journey,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.00 +SHEETMETAL WORKER,Journey,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +Total for Contractor,Journey,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,294.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,294.00,294.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,294.00 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00 +Authorized Services of New England,,,,,,,,,,, +GENERATOR/LIGHTING PLANT/HEATERS,Journey,9.25,9.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.25,9.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",9.25,"9.25 0.000.000.000.000.00","0.000.00 9.25",,,,,,,, +"",,,,,,,,,0.00,9.25, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.25,9.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.25 +"Bay State Building Specialties, INC",,,,,,,,,,, +CARPENTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,72.00,, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +"Blue Construction, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +LABORER: CARPENTER TENDER,Journey,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +Total for Contractor,Journey,304.00,200.00,0.00,104.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,200.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,381.00,381.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,381.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,381.00,381.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,381.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",381.00,"381.00 0.000.000.000.000.00","0.000.00 381.00",,,,,,,, +"",,,,,,,,,0.00,381.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,381.00,381.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,381.00, +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,71.50,71.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,71.50,71.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.50 +Total for Contractor,Journey,71.50,71.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,71.50 +"",Apprentice,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.50,81.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.50 +"Cyber Communications Solutions, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"32.00 0.000.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,0.00,32.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +John W. Egan Company Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,448.00,448.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,448.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,448.00,448.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,448.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",448.00,"448.00 0.000.000.000.000.00","0.000.00 448.00",,,,,,,, +"",,,,,,,,,,0.00,448.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,448.00,448.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,448.00 +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Simplex Grinnell LP,,,,,,,,,,, +ELECTRICIAN,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FIRE ALARM REPAIR / MAINTENANCE,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +Total for Contractor,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,694.00,583.00,0.00,111.00,0.00,0.00,0.00,0.00,217.00,477.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,694.00,583.00,0.00,111.00,0.00,0.00,0.00,0.00,217.00,477.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,694.00,583.00,0.00,111.00,0.00,0.00,0.00,0.00,217.00,477.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,694.00,583.00,0.00,111.00,0.00,0.00,0.00,0.00,217.00,477.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",58.00,"58.00 0.000.000.000.000.00","0.000.00 58.00",,,,,,,, +"",,,,,,,,,,0.00,58.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +LABORER,Journey,69.00,53.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,69.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,69.00,53.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,69.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,104.00,88.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,88.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,104.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",14.00,"14.00 0.000.000.000.000.00","0.000.00 14.00",,,,,,,, +"",,,,,,,,,,0.00,14.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,787.25,787.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,787.25 +"",Apprentice,224.00,32.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",A/J Ratio,0.28,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,011.25",819.25,192.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,011.25" +Total for Contractor,Journey,787.25,787.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,787.25, +Apprentice,224.00,32.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00, +A/J Ratio,0.28,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,011.25",819.25,192.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,011.25", +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"3,467.00","3,236.00",0.00,231.00,0.00,0.00,0.00,0.00,217.00,"3,250.00" +Total Apprentice Hours,270.00,78.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,270.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"3,737.00","3,314.00",192.00,231.00,0.00,0.00,0.00,0.00,217.00,"3,520.00" +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,12.00,6.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,6.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"6.00 0.006.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,0.00,12.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,6.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,12.00,6.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,12.00,6.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,200.00,147.00,0.00,14.00,39.00,0.00,0.00,0.00,0.00,200.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,147.00,0.00,14.00,39.00,0.00,0.00,0.00,0.00,200.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",200.00,"147.00 0.0014.0039.000.000.00","0.000.00 200.00",,,,,,,, +"",,,,,,,,0.00,200.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,147.00,0.00,14.00,39.00,0.00,0.00,0.00,0.00,200.00, +Total Journey Hours,200.00,147.00,0.00,14.00,39.00,0.00,0.00,0.00,0.00,200.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,200.00,147.00,0.00,14.00,39.00,0.00,0.00,0.00,0.00,200.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: NEC1601 HC1 C Northern Essex Community College Lawrence Campus Dimitry Exterior Improvements Project Code: NEC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,20.00,0.00,0.00,4.00,0.00,0.00,0.00,16.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,0.00,0.00,4.00,0.00,0.00,0.00,16.00,0.00,20.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"0.00 0.004.000.000.000.00","16.000.00 20.00",,,,,,,, +"",,,,,,,,0.00,20.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,0.00,0.00,4.00,0.00,0.00,0.00,16.00,0.00,20.00, +Total Journey Hours,20.00,0.00,0.00,4.00,0.00,0.00,0.00,16.00,0.00,20.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,20.00,0.00,0.00,4.00,0.00,0.00,0.00,16.00,0.00,20.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: POL1702 FC1 C State Police New Braintree Boiler Modifications and Replacement Project Code: POL1702 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +SHEETMETAL WORKER,Journey,6.00,0.00,0.00,0.00,0.00,0.00,6.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,0.00,0.00,0.00,0.00,0.00,6.00,0.00,0.00,6.00 +Total for Contractor,Journey,21.00,15.00,0.00,0.00,0.00,0.00,6.00,0.00,, +"",,,,,,,,0.00,21.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,15.00,0.00,0.00,0.00,0.00,6.00,0.00,0.00,21.00, +Total Journey Hours,21.00,15.00,0.00,0.00,0.00,0.00,6.00,0.00,0.00,21.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,21.00,15.00,0.00,0.00,0.00,0.00,6.00,0.00,0.00,21.00, +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,0.00,12.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,164.00,164.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,164.00 +"",Apprentice,64.25,64.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.25 +"",A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.25,228.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",164.00,"164.00 0.000.000.000.000.00","0.000.00 164.00",,,,,,,, +"",,,,,,,,,,0.00,164.00 +"",Apprentice,64.25,64.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.25 +"",A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.25,228.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.25 +B&B Lightning Protection,,,,,,,,,,, +ELECTRICIAN,Journey,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.50 +Total for Contractor,Journey,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,2.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.50 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,133.55,0.00,0.00,0.00,0.00,0.00,133.55,0.00,0.00,133.55 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,133.55,0.00,0.00,0.00,0.00,0.00,133.55,0.00,0.00,133.55, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,138.59,0.00,0.00,0.00,0.00,0.00,138.59,0.00,0.00,138.59 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.59,0.00,0.00,0.00,0.00,0.00,138.59,0.00,0.00,138.59 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",272.14,"0.00 0.000.000.000.00272.14","0.000.00 272.14",,,,,,,, +"",,,,,,,,,,0.00,272.14 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,272.14,0.00,0.00,0.00,0.00,0.00,272.14,0.00,0.00,272.14 +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +ROOFER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Total for Contractor,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.62,0.62,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.62, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.62,0.62,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.62 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.00,"7.00 0.000.000.000.000.00","0.000.00 7.00",,,,,,,, +"",,,,,,,,,,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,508.50,508.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,508.50 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.05,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,532.50,532.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,532.50 +LABORER: CARPENTER TENDER,Journey,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,242.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,250.00,250.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,242.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,758.50,758.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,750.50 +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,782.50,782.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,774.50, +Total Journey Hours,"1,237.64",965.50,0.00,0.00,0.00,0.00,272.14,0.00,8.00,"1,229.64", +Total Apprentice Hours,104.25,104.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.25, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,341.89","1,069.75",0.00,0.00,0.00,0.00,272.14,0.00,8.00,"1,333.89", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,149.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,0.00,149.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,149.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,0.00,149.00 +LABORER,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Total for Contractor,Journey,170.00,21.00,0.00,149.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,170.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,170.00,21.00,0.00,149.00,0.00,0.00,0.00,0.00,0.00,170.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Armani Restoration, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +BRICK/STONE/ARTIFICIAL MASONRY,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,703.00,703.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,703.00 +"",Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",A/J Ratio,0.27,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,895.00,895.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,895.00 +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",711.00,"711.00 0.000.000.000.000.00","0.000.00 711.00",,,,,,,, +"",,,,,,,,,0.00,711.00, +Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +A/J Ratio,0.27,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,903.00,903.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,903.00, +Baron Industries,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ADS/SUBMERSIBLE PILOT,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",96.00,"96.00 0.000.000.000.000.00","0.000.00 96.00",,,,,,,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,601.00,601.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,601.00 +"",Apprentice,434.50,389.50,45.00,0.00,0.00,0.00,0.00,0.00,0.00,434.50 +"",A/J Ratio,0.72,0.65,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,035.50",990.50,45.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,035.50" +Total for Contractor,Journey,601.00,601.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,601.00 +"",Apprentice,434.50,389.50,45.00,0.00,0.00,0.00,0.00,0.00,0.00,434.50 +"",A/J Ratio,0.72,0.65,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,035.50",990.50,45.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,035.50" +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +IRONWORKER/WELDER,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +Total for Contractor,Journey,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,256.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"1,823.00","1,631.00",0.00,192.00,0.00,0.00,0.00,0.00,0.00,"1,823.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,823.00","1,631.00",0.00,192.00,0.00,0.00,0.00,0.00,0.00,"1,823.00", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,436.00,436.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,436.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,436.00,436.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,436.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,259.00","2,067.00 0.00192.000.000.000.00","0.000.00 2,259.00",,,,,,,, +"",,,,,,,,,,0.00,"2,259.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,259.00","2,067.00",0.00,192.00,0.00,0.00,0.00,0.00,0.00,"2,259.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,102.00,102.00,0.00,0.00,0.00,0.00,0.00,0.00,94.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,102.00,0.00,0.00,0.00,0.00,0.00,0.00,94.00,8.00 +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,46.00,24.00,0.00,4.00,18.00,0.00,0.00,0.00,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,24.00,0.00,4.00,18.00,0.00,0.00,0.00,0.00,46.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,545.00,218.00,0.00,307.00,20.00,0.00,0.00,0.00,0.00,545.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,545.00,218.00,0.00,307.00,20.00,0.00,0.00,0.00,0.00,545.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,693.00,344.00,0.00,311.00,38.00,0.00,0.00,0.00,94.00,599.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,693.00,344.00,0.00,311.00,38.00,0.00,0.00,0.00,94.00,599.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,234.50,234.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,234.50,234.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,135.25,135.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,135.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,135.25,135.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,135.25 +Total for Contractor,Journey,369.75,369.75,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,369.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,369.75,369.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,369.75 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,"1,095.50","1,095.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,095.50" +"",Apprentice,224.00,0.00,0.00,224.00,0.00,0.00,0.00,0.00,224.00,0.00 +"",A/J Ratio,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,319.50","1,095.50",0.00,224.00,0.00,0.00,0.00,0.00,224.00,"1,095.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,271.50","1,271.50 0.000.000.000.000.00","0.000.00 1,271.50",,,,,,,, +"",,,,,,,,,,0.00,"1,271.50" +"",Apprentice,224.00,0.00,0.00,224.00,0.00,0.00,0.00,0.00,224.00,0.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,495.50","1,271.50",0.00,224.00,0.00,0.00,0.00,0.00,224.00,"1,271.50" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00 +LABORER,Journey,299.50,299.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,299.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,299.50,299.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,299.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",462.50,"462.50 0.000.000.000.000.00","0.000.00 462.50",,,,,,,, +"",,,,,,,,,0.00,462.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,462.50,462.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,462.50, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,249.00,249.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,249.00 +"",Apprentice,165.50,165.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.50 +"",A/J Ratio,0.66,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,414.50,414.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,414.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",249.00,"249.00 0.000.000.000.000.00","0.000.00 249.00",,,,,,,, +"",,,,,,,,,,0.00,249.00 +"",Apprentice,165.50,165.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,165.50 +"",A/J Ratio,0.66,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,414.50,414.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,414.50 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,606.50,383.50,0.00,0.00,223.00,0.00,0.00,0.00,0.00,606.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,606.50,383.50,0.00,0.00,223.00,0.00,0.00,0.00,0.00,606.50 +Total for Contractor,Journey,606.50,383.50,0.00,0.00,223.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,606.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,606.50,383.50,0.00,0.00,223.00,0.00,0.00,0.00,0.00,606.50 +Emanouil Landscaping,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,304.00,288.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,288.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",472.00,"456.00 0.0016.000.000.000.00","0.000.00 472.00",,,,,,,, +"",,,,,,,,,,0.00,472.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,472.00,456.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,472.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,311.50,311.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,311.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,311.50,311.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,311.50 +LABORER: MASON TENDER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",503.50,"503.50 0.000.000.000.000.00","0.000.00 503.50",,,,,,,, +"",,,,,,,,,0.00,503.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,503.50,503.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,503.50, +"Federal Concrete, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,119.00,119.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,119.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,119.00,119.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,119.00 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,670.00,526.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,670.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,670.00,526.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,670.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",670.00,"526.00 144.000.000.000.000.00","0.000.00 670.00",,,,,,,, +"",,,,,,,,,0.00,670.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,670.00,526.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,670.00, +Front Line Inc,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,208.00,88.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,88.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,208.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",208.00,"88.00 0.00120.000.000.000.00","0.000.00 208.00",,,,,,,, +"",,,,,,,,,,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,88.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,208.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +LABORER,Journey,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50 +SPRINKLER FITTER,Journey,289.50,282.50,0.00,0.00,0.00,0.00,7.00,0.00,0.00,289.50 +Apprentice,260.50,230.00,0.00,0.00,0.00,0.00,30.50,0.00,0.00,260.50, +A/J Ratio,0.90,0.81,0.00,0.00,0.00,0.00,4.36,0.00,0.00,0.90, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,550.00,512.50,0.00,0.00,0.00,0.00,37.50,0.00,0.00,550.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,319.00,312.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,319.00 +"",Apprentice,260.50,230.00,0.00,0.00,0.00,0.00,30.50,0.00,0.00,260.50 +"",A/J Ratio,0.82,0.74,0.00,0.00,0.00,0.00,4.36,0.00,0.00,0.82 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,579.50,542.00,0.00,0.00,0.00,0.00,37.50,0.00,0.00,579.50 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,28.00,21.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,21.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,28.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",28.00,"21.00 0.000.000.000.007.00","0.000.00 28.00",,,,,,,, +"",,,,,,,,,0.00,28.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,21.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,28.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,"1,340.00","1,340.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,340.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,340.00","1,340.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,340.00" +Total for Contractor,Journey,"1,340.00","1,340.00",0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,"1,340.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,340.00","1,340.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,340.00", +Longden Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,412.00,412.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,412.00 +"",Apprentice,144.00,112.00,0.00,0.00,32.00,0.00,0.00,0.00,32.00,112.00 +"",A/J Ratio,0.35,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,556.00,524.00,0.00,0.00,32.00,0.00,0.00,0.00,32.00,524.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",412.00,"412.00 0.000.000.000.000.00","0.000.00 412.00",,,,,,,, +"",,,,,,,,,0.00,412.00, +"",Apprentice,144.00,112.00,0.00,0.00,32.00,0.00,0.00,0.00,32.00,112.00 +"",A/J Ratio,0.35,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,556.00,524.00,0.00,0.00,32.00,0.00,0.00,0.00,32.00,524.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +CEMENT MASONRY/PLASTERING,Journey,93.50,93.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.50,93.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.50 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.50,2.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.50 +IRONWORKER/WELDER,Journey,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,193.50,169.50,8.00,16.00,0.00,0.00,0.00,0.00,0.00,193.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,193.50,169.50,8.00,16.00,0.00,0.00,0.00,0.00,0.00,193.50 +PUMP OPERATOR (CONCRETE),Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +Total for Contractor,Journey,566.00,542.00,8.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,566.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,566.00,542.00,8.00,16.00,0.00,0.00,0.00,0.00,0.00,566.00 +New England Deck & Floors Incorporated,,,,,,,,,,, +LABORER: CEMENT FINISHER TENDER,Journey,178.00,178.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,178.00,178.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,590.00,389.00,0.00,201.00,0.00,0.00,0.00,0.00,148.00,442.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,590.00,389.00,0.00,201.00,0.00,0.00,0.00,0.00,148.00,442.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,768.00,567.00,0.00,201.00,0.00,0.00,0.00,0.00,148.00,620.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,768.00,567.00,0.00,201.00,0.00,0.00,0.00,0.00,148.00,620.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",208.00,"208.00 0.000.000.000.000.00","0.000.00 208.00",,,,,,,, +"",,,,,,,,,,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,384.00,0.00,192.00,192.00,0.00,0.00,0.00,0.00,0.00,384.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,384.00,0.00,192.00,192.00,0.00,0.00,0.00,0.00,0.00,384.00 +PIPEFITTER & STEAMFITTER,Journey,948.00,948.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,948.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,948.00,948.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,948.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,948.00,948.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,948.00 +"",Apprentice,384.00,0.00,192.00,192.00,0.00,0.00,0.00,0.00,0.00,384.00 +"",A/J Ratio,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,332.00",948.00,192.00,192.00,0.00,0.00,0.00,0.00,0.00,"1,332.00" +"Safway Services LLC, Inc.",,,,,,,,,,, +MECHANICS MAINTENANCE,Journey,260.50,260.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.50,260.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",260.50,"260.50 0.000.000.000.000.00","0.000.00 260.50",,,,,,,, +"",,,,,,,,,,0.00,260.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.50,260.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,538.00,458.00,39.00,41.00,0.00,0.00,0.00,0.00,0.00,538.00 +"",Apprentice,160.00,0.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.30,0.00,0.00,3.90,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,698.00,458.00,39.00,201.00,0.00,0.00,0.00,0.00,0.00,698.00 +LABORER,Journey,72.00,40.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,72.00,40.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,72.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,610.00,498.00,39.00,73.00,0.00,0.00,0.00,0.00,0.00,610.00 +"",Apprentice,160.00,0.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.26,0.00,0.00,2.19,0.00,0.00,0.00,0.00,0.00,0.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,770.00,498.00,39.00,233.00,0.00,0.00,0.00,0.00,0.00,770.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,59.00,59.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,59.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,59.00,59.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,59.00 +LABORER,Journey,30.00,15.00,15.00,0.00,0.00,0.00,0.00,0.00,30.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,15.00,15.00,0.00,0.00,0.00,0.00,0.00,30.00,0.00 +Total for Contractor,Journey,89.00,74.00,15.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,30.00,59.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.00,74.00,15.00,0.00,0.00,0.00,0.00,0.00,30.00,59.00 +ver-tex construction specialties,,,,,,,,,,, +JOURNEYMAN LINEMAN,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,738.50","1,544.50",0.00,194.00,0.00,0.00,0.00,0.00,0.00,"1,738.50" +"",Apprentice,"1,154.00",587.50,0.00,400.00,166.50,0.00,0.00,0.00,0.00,"1,154.00" +"",A/J Ratio,0.66,0.38,0.00,2.06,0.00,0.00,0.00,0.00,0.00,0.66 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,892.50","2,132.00",0.00,594.00,166.50,0.00,0.00,0.00,0.00,"2,892.50" +TELECOMMUNICATION TECHNICIAN,Journey,"1,084.50",789.50,46.50,74.50,174.00,0.00,0.00,0.00,0.00,"1,084.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,084.50",789.50,46.50,74.50,174.00,0.00,0.00,0.00,0.00,"1,084.50" +Total for Contractor,Journey,"2,823.00","2,334.00",46.50,268.50,174.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"2,823.00" +"",Apprentice,"1,154.00",587.50,0.00,400.00,166.50,0.00,0.00,0.00,0.00,"1,154.00" +"",A/J Ratio,0.41,0.25,0.00,1.49,0.96,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,977.00","2,921.50",46.50,668.50,340.50,0.00,0.00,0.00,0.00,"3,977.00" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,39.50,23.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,39.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.50,23.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,39.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +MARBLE & TILE FINISHERS,Journey,286.00,112.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,286.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.03,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,294.00,120.00,0.00,174.00,0.00,0.00,0.00,0.00,0.00,294.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,383.50,303.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,383.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,383.50,303.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,383.50 +Total for Contractor,Journey,709.00,439.00,0.00,270.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,709.00, +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.01,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,717.00,447.00,0.00,270.00,0.00,0.00,0.00,0.00,0.00,717.00 +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,370.00,370.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,370.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,370.00,370.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,370.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",370.00,"370.00 0.000.000.000.000.00","0.000.00 370.00",,,,,,,, +"",,,,,,,,0.00,370.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,370.00,370.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,370.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"19,478.25","17,160.25",252.50,"1,616.50",435.00,0.00,14.00,0.00,272.00,"19,206.25" +Total Apprentice Hours,"3,126.50","1,684.50",237.00,976.00,198.50,0.00,30.50,0.00,256.00,"2,870.50" +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"22,604.75","18,844.75",489.50,"2,592.50",633.50,0.00,44.50,0.00,528.00,"22,076.75" +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,223.50,207.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,223.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,223.50,207.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,223.50 +LABORER,Journey,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +Total for Contractor,Journey,354.00,338.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,354.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,354.00,338.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,354.00 +Crocker Architectural Sheet Metal,,,,,,,,,,, +ROOFER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +SHEETMETAL WORKER,Journey,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +LABORER,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,224.00,208.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,208.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,224.00 +Veterans Scaffold,,,,,,,,,,, +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Yard Works Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,30.50,0.00,0.00,30.50,0.00,0.00,0.00,0.00,0.00,30.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.50,0.00,0.00,30.50,0.00,0.00,0.00,0.00,0.00,30.50 +LABORER,Journey,15.75,7.75,0.00,8.00,0.00,0.00,0.00,0.00,0.00,15.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.75,7.75,0.00,8.00,0.00,0.00,0.00,0.00,0.00,15.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,46.25,7.75,0.00,38.50,0.00,0.00,0.00,0.00,0.00,46.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,46.25,7.75,0.00,38.50,0.00,0.00,0.00,0.00,0.00,46.25, +Total Journey Hours,691.75,621.25,0.00,70.50,0.00,0.00,0.00,0.00,0.00,691.75, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,691.75,621.25,0.00,70.50,0.00,0.00,0.00,0.00,0.00,691.75, +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +WoodCraft Designers & Builders LLC,,,,,,,,,,, +CARPENTER,Journey,1.00,0.00,0.00,0.00,0.00,0.00,1.00,0.00,0.00,1.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,0.00,0.00,0.00,0.00,0.00,1.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"0.00 0.000.000.000.001.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,0.00,1.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,0.00,0.00,0.00,0.00,0.00,1.00,0.00,0.00,1.00, +Total Journey Hours,1.00,0.00,0.00,0.00,0.00,0.00,1.00,0.00,0.00,1.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,1.00,0.00,0.00,0.00,0.00,0.00,1.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +LABORER,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +Apprentice,78.00,0.00,0.00,78.00,0.00,0.00,0.00,0.00,0.00,78.00, +A/J Ratio,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,196.00,118.00,0.00,78.00,0.00,0.00,0.00,0.00,0.00,196.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",118.00,"118.00 0.000.000.000.000.00","0.000.00 118.00",,,,,,,, +"",,,,,,,,,0.00,118.00, +Apprentice,78.00,0.00,0.00,78.00,0.00,0.00,0.00,0.00,0.00,78.00, +A/J Ratio,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,196.00,118.00,0.00,78.00,0.00,0.00,0.00,0.00,0.00,196.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.00,"112.00 0.000.000.000.000.00","0.000.00 112.00",,,,,,,, +"",,,,,,,,,,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,453.00,453.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,453.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,453.00,453.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,453.00 +LABORER,Journey,57.50,57.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,57.50,57.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,57.50 +Total for Contractor,Journey,510.50,510.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,510.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,510.50,510.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,510.50 +Kenney Masonry,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,321.50,321.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,321.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,321.50,321.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,321.50, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER: MASON TENDER,Journey,175.50,175.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,175.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,175.50,175.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,175.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",497.00,"497.00 0.000.000.000.000.00","0.000.00 497.00",,,,,,,, +"",,,,,,,,,,0.00,497.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,497.00,497.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,497.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,38.50,38.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,38.50,38.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",46.50,"46.50 0.000.000.000.000.00","0.000.00 46.50",,,,,,,, +"",,,,,,,,,0.00,46.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,46.50,46.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.50, +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,16.00 +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,12.00,0.00,0.00,0.00,0.00,0.00,12.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,0.00,0.00,0.00,0.00,0.00,12.00,0.00,0.00,12.00 +Total for Contractor,Journey,28.00,0.00,0.00,0.00,0.00,0.00,28.00,0.00,, +"",,,,,,,,,,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,0.00,0.00,0.00,0.00,0.00,28.00,0.00,0.00,28.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,75.00,27.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,75.00 +Apprentice,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +A/J Ratio,0.33,0.93,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,100.00,52.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,100.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",75.00,"27.00 0.0048.000.000.000.00","0.000.00 75.00",,,,,,,, +"",,,,,,,,,0.00,75.00, +Apprentice,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +A/J Ratio,0.33,0.93,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,100.00,52.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,100.00, +"Stanley Roofing Company, inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ROOFER,Journey,293.25,148.25,0.00,145.00,0.00,0.00,0.00,0.00,0.00,293.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,293.25,148.25,0.00,145.00,0.00,0.00,0.00,0.00,0.00,293.25 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",293.25,"148.25 0.00145.000.000.000.00","0.000.00 293.25",,,,,,,, +"",,,,,,,,,0.00,293.25, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,293.25,148.25,0.00,145.00,0.00,0.00,0.00,0.00,0.00,293.25 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",Apprentice,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,170.00,170.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,170.00 +Total for Contractor,Journey,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,157.00,, +Apprentice,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,170.00,170.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,170.00, +Total Journey Hours,"1,891.75","1,670.75",0.00,193.00,0.00,0.00,28.00,0.00,0.00,"1,891.75", +Total Apprentice Hours,116.00,38.00,0.00,78.00,0.00,0.00,0.00,0.00,0.00,116.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,007.75","1,708.75",0.00,271.00,0.00,0.00,28.00,0.00,0.00,"2,007.75", +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,287.00,287.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,287.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,287.00,287.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,287.00 +ELEVATOR CONSTRUCTOR HELPER,Journey,380.00,380.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,380.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,380.00,380.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,380.00 +Total for Contractor,Journey,667.00,667.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,667.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,667.00,667.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,667.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,417.00,409.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,417.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,417.00,409.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,417.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",417.00,"409.00 8.000.000.000.000.00","0.000.00 417.00",,,,,,,, +"",,,,,,,,,0.00,417.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,417.00,409.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,417.00, +Atlantic Coast Dismantling LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"0.00 0.0020.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PIPEFITTER & STEAMFITTER,Journey,158.00,86.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,158.00,86.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,192.00,120.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,120.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,112.00,32.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,112.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,32.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,112.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.00,"32.00 0.0080.000.000.000.00","0.000.00 112.00",,,,,,,, +"",,,,,,,,0.00,112.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,32.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,112.00, +Total Journey Hours,"1,408.00","1,228.00",80.00,100.00,0.00,0.00,0.00,0.00,0.00,"1,408.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,408.00","1,228.00",80.00,100.00,0.00,0.00,0.00,0.00,0.00,"1,408.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMarch2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMarch2019.csv new file mode 100644 index 00000000..a478ea30 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMarch2019.csv @@ -0,0 +1,2425 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Rise Engineering,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,50.50,0.00,0.00,50.50,0.00,0.00,0.00,0.00,0.00,50.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.50,0.00,0.00,50.50,0.00,0.00,0.00,0.00,0.00,50.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",50.50,"0.00 0.0050.500.000.000.00","0.000.00 50.50",,,,,,,, +"",,,,,,,,0.00,50.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.50,0.00,0.00,50.50,0.00,0.00,0.00,0.00,0.00,50.50, +Total Journey Hours,50.50,0.00,0.00,50.50,0.00,0.00,0.00,0.00,0.00,50.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,50.50,0.00,0.00,50.50,0.00,0.00,0.00,0.00,0.00,50.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"E. Amanti & Sons, Inc",,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,,, +"",,,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,305.00,305.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,305.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,305.00,305.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,305.00, +LABORER,Journey,365.50,357.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,365.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,365.50,357.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,365.50,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",670.50,"662.50 0.008.000.000.000.00","0.000.00 670.50",,,,,,,,, +"",,,,,,,,,0.00,670.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,670.50,662.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,670.50,, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"0.000.00 16.00", +0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"0.000.00 670.50", +0.00,670.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +ELECTRICIAN,Journey,60.00,54.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00, +Apprentice,42.50,0.00,42.50,0.00,0.00,0.00,0.00,0.00,0.00,42.50,, +A/J Ratio,0.71,0.00,7.08,0.00,0.00,0.00,0.00,0.00,0.00,0.71,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,102.50,54.00,48.50,0.00,0.00,0.00,0.00,0.00,0.00,102.50,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",60.00,"54.00 6.000.000.000.000.00","0.000.00 60.00",,,,,,,,, +"",,,,,,,,,0.00,60.00,, +Apprentice,42.50,0.00,42.50,0.00,0.00,0.00,0.00,0.00,0.00,42.50,, +A/J Ratio,0.71,0.00,7.08,0.00,0.00,0.00,0.00,0.00,0.00,0.71,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,102.50,54.00,48.50,0.00,0.00,0.00,0.00,0.00,0.00,102.50,, +Total Journey Hours,746.50,732.50,6.00,8.00,0.00,0.00,0.00,0.00,0.00,746.50,, +Total Apprentice Hours,42.50,0.00,42.50,0.00,0.00,0.00,0.00,0.00,0.00,42.50,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,789.00,732.50,48.50,8.00,0.00,0.00,0.00,0.00,0.00,789.00,, +"0.000.00 60.00", +0.00,60.00 +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,47.00,47.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,47.00,47.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",47.00,"47.00 0.000.000.000.000.00","0.000.00 47.00",,,,,,,, +"",,,,,,,,,,0.00,47.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,47.00,47.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",A/J Ratio,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +Total for Contractor,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,14.00 +"",Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",A/J Ratio,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Commonwealth Guardrail, Inc.",,,,,,,,,,, +LABORER,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",35.00,"35.00 0.000.000.000.000.00","0.000.00 35.00",,,,,,,, +"",,,,,,,,,0.00,35.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"Donnegan Systems, Inc",,,,,,,,,,, +CARPENTER,Journey,34.50,11.50,11.50,11.50,0.00,0.00,0.00,0.00,0.00,34.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.50,11.50,11.50,11.50,0.00,0.00,0.00,0.00,0.00,34.50 +Total for Contractor,Journey,34.50,11.50,11.50,11.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,34.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.50,11.50,11.50,11.50,0.00,0.00,0.00,0.00,0.00,34.50, +"Eastfield Glass Co,. Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,130.00,65.00,0.00,65.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.00,65.00,0.00,65.00,0.00,0.00,0.00,0.00,0.00,130.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",130.00,"65.00 0.0065.000.000.000.00","0.000.00 130.00",,,,,,,, +"",,,,,,,,,,0.00,130.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.00,65.00,0.00,65.00,0.00,0.00,0.00,0.00,0.00,130.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +SHEETMETAL WORKER,Journey,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.50,"24.50 0.000.000.000.000.00","0.000.00 24.50",,,,,,,, +"",,,,,,,,,0.00,24.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50, +"HVACR Service Contractors, Inc",,,,,,,,,,, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +HVAC MECHANIC,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"King Painting, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +Total for Contractor,Journey,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,0.00,0.00,25.00,0.00,0.00,0.00,0.00,0.00,25.00 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,394.50,394.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,394.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,394.50,394.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,394.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",641.50,"641.50 0.000.000.000.000.00","0.000.00 641.50",,,,,,,, +"",,,,,,,,,,0.00,641.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,641.50,641.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,641.50 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,26.57,18.40,0.00,0.00,0.00,0.00,0.00,8.17,0.00,26.57 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,26.57,18.40,0.00,0.00,0.00,0.00,0.00,8.17,0.00,26.57, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,4.07,0.00,0.00,0.00,0.00,0.00,0.00,4.07,0.00,4.07 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.07,0.00,0.00,0.00,0.00,0.00,0.00,4.07,0.00,4.07 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",30.64,"18.40 0.000.000.000.000.00","12.240.00 30.64",,,,,,,, +"",,,,,,,,,,0.00,30.64 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.64,18.40,0.00,0.00,0.00,0.00,0.00,12.24,0.00,30.64 +"Saltbox Millwork , LLC",,,,,,,,,,, +CARPENTER,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Total for Contractor,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"Stem Solutions, LLC",,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,233.50,106.50,8.00,119.00,0.00,0.00,0.00,0.00,0.00,233.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,233.50,106.50,8.00,119.00,0.00,0.00,0.00,0.00,0.00,233.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",233.50,"106.50 8.00119.000.000.000.00","0.000.00 233.50",,,,,,,, +"",,,,,,,,,0.00,233.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,233.50,106.50,8.00,119.00,0.00,0.00,0.00,0.00,0.00,233.50 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,5.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Ultimate Construction, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,192.00,0.00,88.00,0.00,0.00,0.00,104.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,0.00,88.00,0.00,0.00,0.00,104.00,0.00,0.00,192.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",192.00,"0.00 88.000.000.000.00104.00","0.000.00 192.00",,,,,,,, +"",,,,,,,,,,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,0.00,88.00,0.00,0.00,0.00,104.00,0.00,0.00,192.00 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,60.50,60.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.50,60.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.50 +Total for Contractor,Journey,60.50,60.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,60.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.50,60.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.50 +"Wilkem Scientific, Ltd.",,,,,,,,,,, +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"X-Ray Imaging Technologies, Inc",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",45.50,"45.50 0.000.000.000.000.00","0.000.00 45.50",,,,,,,, +"",,,,,,,,0.00,45.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +Total Journey Hours,"1,620.64","1,176.40",107.50,220.50,0.00,0.00,104.00,12.24,0.00,"1,620.64", +Total Apprentice Hours,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,641.64","1,197.40",107.50,220.50,0.00,0.00,104.00,12.24,0.00,"1,641.64", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",41.00,"41.00 0.000.000.000.000.00","0.000.00 41.00",,,,,,,, +"",,,,,,,,0.00,41.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +Total Journey Hours,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +AAA ROYAL CONSTRUCTION LLC,,,,,,,,,,, +CARPENTER,Journey,42.00,0.00,0.00,42.00,0.00,0.00,0.00,0.00,0.00,42.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,0.00,0.00,42.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",42.00,"0.00 0.0042.000.000.000.00","0.000.00 42.00",,,,,,,, +"",,,,,,,,0.00,42.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,0.00,0.00,42.00,0.00,0.00,0.00,0.00,0.00,42.00, +Total Journey Hours,42.00,0.00,0.00,42.00,0.00,0.00,0.00,0.00,0.00,42.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,42.00,0.00,0.00,42.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,215.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,215.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",215.00,"215.00 0.000.000.000.000.00","0.000.00 215.00",,,,,,,, +"",,,,,,,,,,0.00,215.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,215.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00 +Total for Contractor,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,39.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,"1,505.00","1,505.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,505.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,505.00","1,505.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,505.00", +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,330.00,330.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,330.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,330.00,330.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,330.00 +LABORER,Journey,800.50,605.00,0.00,195.50,0.00,0.00,0.00,0.00,0.00,800.50 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.03,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,824.50,629.00,0.00,195.50,0.00,0.00,0.00,0.00,0.00,824.50 +Total for Contractor,Journey,"2,635.50","2,440.00",0.00,195.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"2,635.50" +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.01,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,659.50","2,464.00",0.00,195.50,0.00,0.00,0.00,0.00,0.00,"2,659.50" +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +DRIVER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +LABORER,Journey,628.00,628.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,628.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,628.00,628.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,628.00 +Total for Contractor,Journey,828.00,828.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,828.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,828.00,828.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,828.00, +Total Journey Hours,"3,925.50","3,730.00",0.00,195.50,0.00,0.00,0.00,0.00,0.00,"3,925.50", +Total Apprentice Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,949.50","3,754.00",0.00,195.50,0.00,0.00,0.00,0.00,0.00,"3,949.50", +"Project Name: DMH0902 EC1 C Taunton State Hospital Energy Project Project Code: DMH0902 EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +A&A Window Products Inc.,,,,,,,,,,, +GLAZIER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,84.50,79.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,84.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.50,79.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,84.50 +Total for Contractor,Journey,84.50,79.50,5.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,84.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.50,79.50,5.00,0.00,0.00,0.00,0.00,0.00,0.00,84.50 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,643.50,643.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,643.50,643.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.50, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,643.50,643.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,643.50,643.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,643.50, +Total Journey Hours,732.00,727.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,732.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,732.00,727.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,732.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",83.00,"83.00 0.000.000.000.000.00","0.000.00 83.00",,,,,,,, +"",,,,,,,,,,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,196.00,196.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,196.00 +"",Apprentice,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",A/J Ratio,0.77,0.77,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.77 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,346.00,346.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,346.00 +Total for Contractor,Journey,196.00,196.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,196.00 +"",Apprentice,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",A/J Ratio,0.77,0.77,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.77 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,346.00,346.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,346.00 +Debrino Caulking Associates Inc.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,132.00,132.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +"",Apprentice,41.50,0.00,41.50,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +"",A/J Ratio,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,173.50,132.00,41.50,0.00,0.00,0.00,0.00,0.00,0.00,173.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",132.00,"132.00 0.000.000.000.000.00","0.000.00 132.00",,,,,,,, +"",,,,,,,,,0.00,132.00, +"",Apprentice,41.50,0.00,41.50,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +"",A/J Ratio,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,173.50,132.00,41.50,0.00,0.00,0.00,0.00,0.00,0.00,173.50 +Hartin Welding,,,,,,,,,,, +IRONWORKER/WELDER,Journey,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +Total for Contractor,Journey,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,93.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00, +Nashoba Paving,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,197.75,197.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,197.75,197.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.75 +DRIVER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,102.25,102.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.25,102.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,102.25 +Total for Contractor,Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"William F. Lynch Co., Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00, +Total Journey Hours,900.00,884.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,900.00, +Total Apprentice Hours,191.50,150.00,41.50,0.00,0.00,0.00,0.00,0.00,0.00,191.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,091.50","1,034.00",41.50,16.00,0.00,0.00,0.00,0.00,0.00,"1,091.50", +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +PLUMBERS & GASFITTERS,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +SHEETMETAL WORKER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +Total for Contractor,Journey,59.00,59.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,59.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,59.00,59.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,59.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +Total Journey Hours,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,172.50,172.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,172.50,172.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.50 +LABORER,Journey,172.50,172.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,172.50,172.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.50 +Total for Contractor,Journey,345.00,345.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,345.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,345.00,345.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,345.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +PLUMBERS & GASFITTERS,Journey,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50, +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",66.00,"66.00 0.000.000.000.000.00","0.000.00 66.00",,,,,,,, +"",,,,,,,,,,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"HVACR Service Contractors, Inc",,,,,,,,,,, +HVAC MECHANIC,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Industrial Mechanical Insulation,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,25.00,17.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,21.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.00,17.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,21.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,25.00,17.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,21.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,17.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,21.50 +"SNE Building Systems, Inc",,,,,,,,,,, +"TELEDATA WIREMAN/INSTALLER/TECHNICIAN",Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,0.00,5.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Journey Hours,445.00,437.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,441.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,445.00,437.00,0.00,8.00,0.00,0.00,0.00,0.00,3.50,441.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Professional Fire Systems, Inc.",,,,,,,,,,, +"FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY",Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,0.00,5.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Journey Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +PLUMBERS & GASFITTERS,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +SHEETMETAL WORKER,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +Total for Contractor,Journey,390.00,390.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,390.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,390.00,390.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,390.00 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,546.00,546.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,546.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,546.00,546.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,546.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",546.00,"546.00 0.000.000.000.000.00","0.000.00 546.00",,,,,,,, +"",,,,,,,,,0.00,546.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,546.00,546.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,546.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Total for Contractor,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,200.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,600.00,584.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,600.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,600.00,584.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,600.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",600.00,"584.00 0.000.000.000.0016.00","0.000.00 600.00",,,,,,,, +"",,,,,,,,,,0.00,600.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,600.00,584.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,600.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,542.50,342.50,0.00,0.00,0.00,0.00,200.00,0.00,0.00,542.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,542.50,342.50,0.00,0.00,0.00,0.00,200.00,0.00,0.00,542.50 +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,494.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,494.00,494.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,494.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,036.50",836.50,0.00,0.00,0.00,0.00,200.00,0.00,0.00,"1,036.50" +"",Apprentice,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",A/J Ratio,0.05,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,087.50",887.50,0.00,0.00,0.00,0.00,200.00,0.00,0.00,"1,087.50" +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +INSULATOR (PIPES & TANKS),Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,16.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,48.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,79.00,79.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.81,0.81,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.81 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",79.00,"79.00 0.000.000.000.000.00","0.000.00 79.00",,,,,,,, +"",,,,,,,,,,0.00,79.00 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",A/J Ratio,0.81,0.81,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.81 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +MTJ Landscapes,,,,,,,,,,, +LABORER,Journey,83.75,50.75,0.00,33.00,0.00,0.00,0.00,0.00,0.00,83.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.75,50.75,0.00,33.00,0.00,0.00,0.00,0.00,0.00,83.75 +LABORER: MULTI-TRADE TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"SPECIALIZED EARTH MOVING EQUIP < 35 TONS",Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",106.75,"73.75 0.0033.000.000.000.00","0.000.00 106.75",,,,,,,, +"",,,,,,,,,,0.00,106.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.75,73.75,0.00,33.00,0.00,0.00,0.00,0.00,0.00,106.75 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +Total for Contractor,Journey,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +Simplex Grinnell LP,,,,,,,,,,, +ELECTRICIAN,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,55.00,47.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,47.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",55.00,"47.00 8.000.000.000.000.00","0.000.00 55.00",,,,,,,, +"",,,,,,,,,0.00,55.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,47.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,159.50,37.00,53.00,69.50,0.00,0.00,0.00,0.00,0.00,159.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,159.50,37.00,53.00,69.50,0.00,0.00,0.00,0.00,0.00,159.50 +Total for Contractor,Journey,159.50,37.00,53.00,69.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,159.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,159.50,37.00,53.00,69.50,0.00,0.00,0.00,0.00,0.00,159.50, +Synergy Electrical Systems LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",26.00,"26.00 0.000.000.000.000.00","0.000.00 26.00",,,,,,,, +"",,,,,,,,,,0.00,26.00 +"",Apprentice,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",A/J Ratio,0.08,0.08,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +LABORER,Journey,103.00,103.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,103.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,103.00,103.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,103.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",136.00,"136.00 0.000.000.000.000.00","0.000.00 136.00",,,,,,,, +"",,,,,,,,,0.00,136.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Titan Roofing, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,45.00,0.00,0.00,45.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",A/J Ratio,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,149.00,104.00,0.00,45.00,0.00,0.00,0.00,0.00,0.00,149.00 +SHEETMETAL WORKER,Journey,153.00,153.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,153.00 +"",Apprentice,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",A/J Ratio,1.15,1.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,329.00,329.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,329.00 +Total for Contractor,Journey,257.00,257.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,257.00, +"",Apprentice,221.00,176.00,0.00,45.00,0.00,0.00,0.00,0.00,0.00,221.00 +"",A/J Ratio,0.86,0.68,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.86 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,478.00,433.00,0.00,45.00,0.00,0.00,0.00,0.00,0.00,478.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,265.00,265.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,265.00 +Apprentice,208.00,128.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00, +A/J Ratio,0.78,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.78, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,473.00,393.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,473.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",265.00,"265.00 0.000.000.000.000.00","0.000.00 265.00",,,,,,,, +"",,,,,,,,0.00,265.00,, +Apprentice,208.00,128.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00, +A/J Ratio,0.78,0.48,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.78, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,473.00,393.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,473.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"4,558.25","4,178.75",61.00,102.50,0.00,0.00,216.00,0.00,0.00,"4,558.25" +Total Apprentice Hours,578.00,421.00,80.00,77.00,0.00,0.00,0.00,0.00,0.00,578.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"5,136.25","4,599.75",141.00,179.50,0.00,0.00,216.00,0.00,0.00,"5,136.25" +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,191.00,167.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,191.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,191.00,167.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,191.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",191.00,"167.00 0.0024.000.000.000.00","0.000.00 191.00",,,,,,,, +"",,,,,,,,0.00,191.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,191.00,167.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,191.00, +Total Journey Hours,191.00,167.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,191.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,191.00,167.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,191.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: POL1702 FC1 C State Police New Braintree Boiler Modifications and Replacement Project Code: POL1702 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,20.00,11.00,8.00,0.00,0.00,1.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,11.00,8.00,0.00,0.00,1.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"11.00 8.000.000.001.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,11.00,8.00,0.00,0.00,1.00,0.00,0.00,0.00,20.00 +"Mill City Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +Total for Contractor,Journey,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,121.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,121.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +"Thermo-Dynamics International, Inc.",,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +INSULATOR (PIPES & TANKS),Journey,244.00,108.00,48.00,88.00,0.00,0.00,0.00,0.00,0.00,244.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,244.00,108.00,48.00,88.00,0.00,0.00,0.00,0.00,0.00,244.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",244.00,"108.00 48.0088.000.000.000.00","0.000.00 244.00",,,,,,,, +"",,,,,,,,,0.00,244.00, +Apprentice,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +A/J Ratio,0.39,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,340.00,204.00,48.00,88.00,0.00,0.00,0.00,0.00,0.00,340.00, +Total Journey Hours,385.00,240.00,56.00,88.00,0.00,1.00,0.00,0.00,0.00,385.00, +Total Apprentice Hours,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,481.00,336.00,56.00,88.00,0.00,1.00,0.00,0.00,0.00,481.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,0.00,10.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Journey Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDF1401E EC1 C Sheriff's Department Franklin Energy/Water Design/Build Project Project Code: SDF1401E EC1",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Millennium Builders, Inc.",,,,,,,,,,,, +CARPENTER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,,, +"",,,,,,,,0.00,10.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,, +Total Journey Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,, +"0.000.00 10.00", +0.00,10.00 +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.44,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",9.00,"9.00 0.000.000.000.000.00","0.000.00 9.00",,,,,,,, +"",,,,,,,,,,0.00,9.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.44,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,24.00,20.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,20.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,24.00,20.00,0.00,4.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,20.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,24.00 +Complete Labor and Staffing LLC,,,,,,,,,,, +LABORER,Journey,219.00,56.00,0.00,163.00,0.00,0.00,0.00,0.00,0.00,219.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,219.00,56.00,0.00,163.00,0.00,0.00,0.00,0.00,0.00,219.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,219.00,56.00,0.00,163.00,0.00,0.00,0.00,0.00,0.00,219.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.00,56.00,0.00,163.00,0.00,0.00,0.00,0.00,0.00,219.00 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +DRIVER,Journey,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",44.50,"44.50 0.000.000.000.000.00","0.000.00 44.50",,,,,,,, +"",,,,,,,,,0.00,44.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.50,44.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.50 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +LABORER: CARPENTER TENDER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",282.50,"282.50 0.000.000.000.000.00","0.000.00 282.50",,,,,,,, +"",,,,,,,,0.00,282.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,282.50,282.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,282.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,582.00,415.00,0.00,167.00,0.00,0.00,0.00,0.00,0.00,582.00 +Total Apprentice Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,586.00,419.00,0.00,167.00,0.00,0.00,0.00,0.00,0.00,586.00 +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,320.00,160.00,0.00,152.00,0.00,0.00,0.00,8.00,0.00,320.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,320.00,160.00,0.00,152.00,0.00,0.00,0.00,8.00,0.00,320.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",320.00,"160.00 0.00152.000.000.000.00","8.000.00 320.00",,,,,,,, +"",,,,,,,,,,0.00,320.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,320.00,160.00,0.00,152.00,0.00,0.00,0.00,8.00,0.00,320.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,691.50,691.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,691.50 +Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +A/J Ratio,0.23,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,851.50,851.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,851.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,691.50,691.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,691.50 +"",Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.23,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.23 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,851.50,851.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,851.50 +Baron Industries,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",200.00,"200.00 0.000.000.000.000.00","0.000.00 200.00",,,,,,,, +"",,,,,,,,,0.00,200.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Bird Master,,,,,,,,,,, +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,32.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,232.00,192.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",192.00,"192.00 0.000.000.000.000.00","0.000.00 192.00",,,,,,,, +"",,,,,,,,,,0.00,192.00 +"",Apprentice,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,232.00,192.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"4,151.00","3,448.50",0.00,702.50,0.00,0.00,0.00,0.00,0.00,"4,151.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"4,151.00","3,448.50",0.00,702.50,0.00,0.00,0.00,0.00,0.00,"4,151.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,"1,016.00","1,016.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,016.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,016.00","1,016.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,016.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","5,167.00","4,464.50 0.00702.500.000.000.00","0.000.00 5,167.00",,,,,,,, +"",,,,,,,,,,0.00,"5,167.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"5,167.00","4,464.50",0.00,702.50,0.00,0.00,0.00,0.00,0.00,"5,167.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER,Journey,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00,0.00 +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,128.00,110.00,0.00,18.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,110.00,0.00,18.00,0.00,0.00,0.00,0.00,0.00,128.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,125.00,69.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,125.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,125.00,69.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,125.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,330.00,256.00,0.00,74.00,0.00,0.00,0.00,0.00,77.00,253.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,330.00,256.00,0.00,74.00,0.00,0.00,0.00,0.00,77.00,253.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,298.25,298.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,298.25,298.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.25 +ELEVATOR CONSTRUCTOR HELPER,Journey,279.00,279.00,0.00,0.00,0.00,0.00,0.00,0.00,123.50,155.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,279.00,279.00,0.00,0.00,0.00,0.00,0.00,0.00,123.50,155.50 +Total for Contractor,Journey,577.25,577.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,123.50,453.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,577.25,577.25,0.00,0.00,0.00,0.00,0.00,0.00,123.50,453.75 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,827.00,827.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,827.00 +"",Apprentice,225.00,0.00,0.00,225.00,0.00,0.00,0.00,0.00,225.00,0.00 +"",A/J Ratio,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,052.00",827.00,0.00,225.00,0.00,0.00,0.00,0.00,225.00,827.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,031.00","1,031.00 0.000.000.000.000.00","0.000.00 1,031.00",,,,,,,, +"",,,,,,,,,,0.00,"1,031.00" +"",Apprentice,225.00,0.00,0.00,225.00,0.00,0.00,0.00,0.00,225.00,0.00 +"",A/J Ratio,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,256.00","1,031.00",0.00,225.00,0.00,0.00,0.00,0.00,225.00,"1,031.00" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +LABORER,Journey,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,134.00,134.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,134.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",180.00,"180.00 0.000.000.000.000.00","0.000.00 180.00",,,,,,,, +"",,,,,,,,,0.00,180.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PLUMBERS & GASFITTERS,Journey,727.00,727.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,727.00 +"",Apprentice,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,917.00,917.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,917.00 +Total for Contractor,Journey,743.00,743.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,743.00 +"",Apprentice,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,933.00,933.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,933.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +INSULATOR (PIPES & TANKS),Journey,541.00,525.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,541.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,541.00,525.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,541.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,579.00,563.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,579.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,579.00,563.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,579.00 +"Electrical Engineering & Service Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,573.00,573.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,573.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,573.00,573.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,573.00 +LABORER: MASON TENDER,Journey,432.00,376.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,432.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,432.00,376.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,432.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,005.00",949.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,"1,005.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,005.00",949.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,"1,005.00" +"Federal Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,290.00,290.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,290.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,290.00,290.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,290.00 +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",490.00,"490.00 0.000.000.000.000.00","0.000.00 490.00",,,,,,,, +"",,,,,,,,,0.00,490.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,490.00,490.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,490.00, +"Feeley, McAnespie",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,125.00,93.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,125.00 +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.32,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,165.00,133.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,165.00 +SHEETMETAL WORKER,Journey,236.00,93.50,142.50,0.00,0.00,0.00,0.00,0.00,0.00,236.00 +"",Apprentice,134.50,0.00,0.00,0.00,134.50,0.00,0.00,0.00,0.00,134.50 +"",A/J Ratio,0.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.57 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,370.50,93.50,142.50,0.00,134.50,0.00,0.00,0.00,0.00,370.50 +Total for Contractor,Journey,361.00,186.50,142.50,32.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,361.00 +"",Apprentice,174.50,40.00,0.00,0.00,134.50,0.00,0.00,0.00,0.00,174.50 +"",A/J Ratio,0.48,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.48 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,535.50,226.50,142.50,32.00,134.50,0.00,0.00,0.00,0.00,535.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,"1,010.50",778.50,232.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,010.50" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,010.50",778.50,232.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,010.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,010.50","778.50 232.000.000.000.000.00","0.000.00 1,010.50",,,,,,,, +"",,,,,,,,,0.00,"1,010.50", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,010.50",778.50,232.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,010.50", +"H Carr & Sons, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,408.00,408.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,408.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,408.00,408.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,408.00 +LABORER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Total for Contractor,Journey,568.00,568.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,568.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,568.00,568.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,568.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +LABORER,Journey,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,215.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,215.00,215.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,215.00 +SPRINKLER FITTER,Journey,482.00,263.00,0.00,0.00,0.00,0.00,219.00,0.00,0.00,482.00 +Apprentice,467.00,467.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,467.00, +A/J Ratio,0.97,1.78,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.97, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,949.00,730.00,0.00,0.00,0.00,0.00,219.00,0.00,0.00,949.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,704.00,485.00,0.00,0.00,0.00,0.00,219.00,0.00,0.00,704.00 +"",Apprentice,467.00,467.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,467.00 +"",A/J Ratio,0.66,0.96,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,171.00",952.00,0.00,0.00,0.00,0.00,219.00,0.00,0.00,"1,171.00" +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,38.00,25.00,0.00,0.00,0.00,0.00,13.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,25.00,0.00,0.00,0.00,0.00,13.00,0.00,0.00,38.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.00,"25.00 0.000.000.000.0013.00","0.000.00 38.00",,,,,,,, +"",,,,,,,,,0.00,38.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,25.00,0.00,0.00,0.00,0.00,13.00,0.00,0.00,38.00 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,32.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Lymo Construction Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,425.00,377.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,425.00 +"",Apprentice,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +"",A/J Ratio,0.35,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,574.00,526.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,574.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",425.00,"377.00 0.0048.000.000.000.00","0.000.00 425.00",,,,,,,, +"",,,,,,,,,0.00,425.00, +"",Apprentice,149.00,149.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,149.00 +"",A/J Ratio,0.35,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,574.00,526.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,574.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,210.00,194.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,210.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,210.00,194.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,210.00 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +LABORER,Journey,102.50,54.50,0.00,48.00,0.00,0.00,0.00,0.00,0.00,102.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.50,54.50,0.00,48.00,0.00,0.00,0.00,0.00,0.00,102.50 +PUMP OPERATOR (CONCRETE),Journey,25.50,25.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.50,25.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,343.50,279.50,0.00,64.00,0.00,0.00,0.00,0.00,0.00,343.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,343.50,279.50,0.00,64.00,0.00,0.00,0.00,0.00,0.00,343.50 +New England Deck & Floors Incorporated,,,,,,,,,,, +LABORER: CEMENT FINISHER TENDER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,128.00,40.00,0.00,88.00,0.00,0.00,0.00,0.00,40.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,40.00,0.00,88.00,0.00,0.00,0.00,0.00,40.00,88.00 +Total for Contractor,Journey,216.00,128.00,0.00,88.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,40.00,176.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,216.00,128.00,0.00,88.00,0.00,0.00,0.00,0.00,40.00,176.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,240.00,40.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,240.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,240.00,40.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,240.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,"1,117.00","1,117.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,117.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,117.00","1,117.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,117.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,117.00","1,117.00 0.000.000.000.000.00","0.000.00 1,117.00",,,,,,,, +"",,,,,,,,,,0.00,"1,117.00" +"",Apprentice,240.00,40.00,0.00,200.00,0.00,0.00,0.00,0.00,0.00,240.00 +"",A/J Ratio,0.21,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,357.00","1,157.00",0.00,200.00,0.00,0.00,0.00,0.00,0.00,"1,357.00" +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +MECHANICS MAINTENANCE,Journey,508.50,508.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,508.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,508.50,508.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,508.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",554.50,"554.50 0.000.000.000.000.00","0.000.00 554.50",,,,,,,, +"",,,,,,,,,0.00,554.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,554.50,554.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.50, +South Shore Pipeline,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,384.00,384.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,384.00 +"",Apprentice,340.00,0.00,172.00,168.00,0.00,0.00,0.00,0.00,0.00,340.00 +"",A/J Ratio,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,724.00,384.00,172.00,168.00,0.00,0.00,0.00,0.00,0.00,724.00 +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,402.00,386.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,402.00 +"",Apprentice,340.00,0.00,172.00,168.00,0.00,0.00,0.00,0.00,0.00,340.00 +"",A/J Ratio,0.85,0.00,0.00,10.50,0.00,0.00,0.00,0.00,0.00,0.85 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,742.00,386.00,172.00,184.00,0.00,0.00,0.00,0.00,0.00,742.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,291.00,291.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,291.00,291.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",291.00,"291.00 0.000.000.000.000.00","0.000.00 291.00",,,,,,,, +"",,,,,,,,,,0.00,291.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,291.00,291.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00,0.00 +IRONWORKER/WELDER,Journey,101.50,101.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,101.50,101.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,101.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,79.00,12.50,19.50,47.00,0.00,0.00,0.00,0.00,0.00,79.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,79.00,12.50,19.50,47.00,0.00,0.00,0.00,0.00,0.00,79.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",180.50,"114.00 19.5047.000.000.000.00","0.000.00 180.50",,,,,,,, +"",,,,,,,,,,0.00,180.50 +"",Apprentice,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00,0.00 +"",A/J Ratio,0.22,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.50,153.00,19.50,47.00,0.00,0.00,0.00,0.00,39.00,180.50 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"3,547.50","2,951.50",160.00,436.00,0.00,0.00,0.00,0.00,0.00,"3,547.50" +"",Apprentice,"1,567.00","1,191.50",0.00,375.50,0.00,0.00,0.00,0.00,0.00,"1,567.00" +"",A/J Ratio,0.44,0.40,0.00,0.86,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"5,114.50","4,143.00",160.00,811.50,0.00,0.00,0.00,0.00,0.00,"5,114.50" +TELECOMMUNICATION TECHNICIAN,Journey,777.00,553.00,24.00,0.00,200.00,0.00,0.00,0.00,0.00,777.00 +Apprentice,420.50,420.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,420.50, +A/J Ratio,0.54,0.76,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,197.50",973.50,24.00,0.00,200.00,0.00,0.00,0.00,0.00,"1,197.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","4,324.50","3,504.50 184.00436.00200.000.000.00","0.000.00 4,324.50",,,,,,,, +"",,,,,,,,,0.00,"4,324.50", +Apprentice,"1,987.50","1,612.00",0.00,375.50,0.00,0.00,0.00,0.00,0.00,"1,987.50", +A/J Ratio,0.46,0.46,0.00,0.86,0.00,0.00,0.00,0.00,0.00,0.46, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"6,312.00","5,116.50",184.00,811.50,200.00,0.00,0.00,0.00,0.00,"6,312.00", +"West Floor Covering, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +MARBLE & TILE FINISHERS,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,704.00,704.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,704.00 +"",Apprentice,232.00,208.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,232.00 +"",A/J Ratio,0.33,0.30,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,936.00,912.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,936.00 +Total for Contractor,Journey,704.00,704.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,704.00,, +Apprentice,232.00,208.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,232.00, +A/J Ratio,0.33,0.30,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,936.00,912.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,936.00, +Total Journey Hours,"22,997.25","20,247.75",578.00,"1,715.50",216.00,0.00,232.00,8.00,240.50,"22,756.75", +Total Apprentice Hours,"4,260.00","2,905.00",212.00,"1,008.50",134.50,0.00,0.00,0.00,264.00,"3,996.00", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"27,257.25","23,152.75",790.00,"2,724.00",350.50,0.00,232.00,8.00,504.50,"26,752.75", +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +WoodCraft Designers & Builders LLC,,,,,,,,,,, +CARPENTER,Journey,13.00,5.75,0.00,0.00,0.00,0.00,7.25,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,5.75,0.00,0.00,0.00,0.00,7.25,0.00,0.00,13.00 +Total for Contractor,Journey,13.00,5.75,0.00,0.00,0.00,0.00,7.25,0.00,, +"",,,,,,,,,0.00,13.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,5.75,0.00,0.00,0.00,0.00,7.25,0.00,0.00,13.00, +Total Journey Hours,21.00,13.75,0.00,0.00,0.00,0.00,7.25,0.00,0.00,21.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,21.00,13.75,0.00,0.00,0.00,0.00,7.25,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,98.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,98.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",49.00,"49.00 0.000.000.000.000.00","0.000.00 49.00",,,,,,,, +"",,,,,,,,,,0.00,49.00 +"",Apprentice,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,98.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,98.00 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +Total for Contractor,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",200.00,"200.00 0.000.000.000.000.00","0.000.00 200.00",,,,,,,, +"",,,,,,,,,0.00,200.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Zap Electric,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,358.50,358.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,358.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,358.50,358.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,358.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",358.50,"358.50 0.000.000.000.000.00","0.000.00 358.50",,,,,,,, +"",,,,,,,,,0.00,358.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,358.50,358.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,358.50, +Total Journey Hours,816.50,816.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,816.50, +Total Apprentice Hours,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,865.50,865.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,865.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMay2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMay2019.csv new file mode 100644 index 00000000..ef1fcc03 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportMay2019.csv @@ -0,0 +1,2947 @@ +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"1.00 0.000.000.000.000.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,0.00,1.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +Total Journey Hours,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Celco Construction Corp.,,,,,,,,,,,, +DEMO: CONCRETE CUTTER/SAWYER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,,, +"",,,,,,,,,,0.00,4.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Chet's Welding Inc.,,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +Total for Contractor,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,3.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"E. Amanti & Sons, Inc",,,,,,,,,,,, +LABORER,Journey,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00,, +"0.000.00 4.00", +0.00,4.00 +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +PLUMBERS & GASFITTERS,Journey,126.00,126.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,126.00, +"",Apprentice,90.50,90.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.50, +"",A/J Ratio,0.72,0.72,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,216.50,216.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,216.50, +Total for Contractor,Journey,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,0.00,180.00,, +"",Apprentice,90.50,90.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,90.50, +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,270.50,270.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,270.50, +W.L. French Excavating Corp.,,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,163.00,163.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,163.00, +BACKHOE/FRONT-END LOADER,Journey,315.00,315.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,315.00,315.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.00, +LABORER,Journey,919.00,844.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,919.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,919.00,844.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,919.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Total for Contractor,Journey,"1,397.00","1,322.00",75.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,397.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,397.00","1,322.00",75.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,397.00", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,152.50,122.00,6.00,24.50,0.00,0.00,0.00,0.00,0.00,152.50, +Apprentice,124.50,24.00,100.50,0.00,0.00,0.00,0.00,0.00,0.00,124.50,, +A/J Ratio,0.82,0.20,16.75,0.00,0.00,0.00,0.00,0.00,0.00,0.82,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,277.00,146.00,106.50,24.50,0.00,0.00,0.00,0.00,0.00,277.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",152.50,"122.00 6.0024.500.000.000.00","0.000.00 152.50",,,,,,,,, +"",,,,,,,,0.00,152.50,,, +Apprentice,124.50,24.00,100.50,0.00,0.00,0.00,0.00,0.00,0.00,124.50,, +A/J Ratio,0.82,0.20,16.75,0.00,0.00,0.00,0.00,0.00,0.00,0.82,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,277.00,146.00,106.50,24.50,0.00,0.00,0.00,0.00,0.00,277.00,, +Total Journey Hours,"1,736.50","1,631.00",81.00,24.50,0.00,0.00,0.00,0.00,0.00,"1,736.50",, +Total Apprentice Hours,215.00,114.50,100.50,0.00,0.00,0.00,0.00,0.00,0.00,215.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,"1,951.50","1,745.50",181.50,24.50,0.00,0.00,0.00,0.00,0.00,"1,951.50",, +"0.000.00 152.50", +0.00,152.50 +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Avid Ironworks, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +Total for Contractor,Journey,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,29.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +Ayotte and King for Tile Inc.,,,,,,,,,,, +FLOORCOVERER,Journey,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +Apprentice,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00, +A/J Ratio,0.74,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.74, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +"",Apprentice,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",A/J Ratio,0.74,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.74 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +Champagne Drywall Inc,,,,,,,,,,, +CARPENTER,Journey,68.00,0.00,0.00,68.00,0.00,0.00,0.00,0.00,0.00,68.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.00,0.00,0.00,68.00,0.00,0.00,0.00,0.00,0.00,68.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",68.00,"0.00 0.0068.000.000.000.00","0.000.00 68.00",,,,,,,, +"",,,,,,,,,0.00,68.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.00,0.00,0.00,68.00,0.00,0.00,0.00,0.00,0.00,68.00 +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Total for Contractor,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,1.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +Crestview Construction & Trucking Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,43.50,43.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.50,43.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.50 +DRIVER / GROUNDMAN CDL,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +LABORER,Journey,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +Total for Contractor,Journey,107.50,107.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,107.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.50,107.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.50 +"Donnegan Systems, Inc",,,,,,,,,,, +CARPENTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Eastfield Glass Co,. Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,28.00,14.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,14.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,28.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",28.00,"14.00 0.0014.000.000.000.00","0.000.00 28.00",,,,,,,, +"",,,,,,,,,,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,14.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,28.00 +"General Mechanical Contractors, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +SHEETMETAL WORKER,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,34.50,34.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.50,34.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.50 +Harris Environmental Systems,,,,,,,,,,, +CARPENTER,Journey,598.00,598.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,598.00 +"",Apprentice,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",A/J Ratio,0.17,0.17,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.17 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,698.00,698.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,698.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +PIPEFITTER & STEAMFITTER,Journey,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,150.00,150.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",748.00,"748.00 0.000.000.000.000.00","0.000.00 748.00",,,,,,,, +"",,,,,,,,,0.00,748.00, +Apprentice,206.00,206.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.00, +A/J Ratio,0.28,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,954.00,954.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,954.00, +"King Painting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,94.00,0.00,0.00,94.00,0.00,0.00,0.00,0.00,0.00,94.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,0.00,0.00,94.00,0.00,0.00,0.00,0.00,0.00,94.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",94.00,"0.00 0.0094.000.000.000.00","0.000.00 94.00",,,,,,,, +"",,,,,,,,,,0.00,94.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,0.00,0.00,94.00,0.00,0.00,0.00,0.00,0.00,94.00 +MORTECH MANUFACTURING,,,,,,,,,,, +LABORER: CARPENTER TENDER,Journey,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"New England Interior Specialties, Inc.",,,,,,,,,,, +CARPENTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Ondrick Materials & Recycling, LLC",,,,,,,,,,, +ASPHALT RAKER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +DRIVER,Journey,6.50,2.75,0.00,3.75,0.00,0.00,0.00,0.00,0.00,6.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.50,2.75,0.00,3.75,0.00,0.00,0.00,0.00,0.00,6.50 +EQUIPMENT OPERATOR (Class A CDL),Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +LABORER,Journey,24.00,14.25,9.75,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,14.25,9.75,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,55.50,42.00,9.75,3.75,0.00,0.00,0.00,0.00,0.00,55.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.50,42.00,9.75,3.75,0.00,0.00,0.00,0.00,0.00,55.50 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,203.00,203.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,203.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,203.00,203.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,203.00 +LABORER,Journey,335.50,335.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,335.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,335.50,335.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,335.50 +Total for Contractor,Journey,538.50,538.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,538.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,538.50,538.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,538.50 +Palma Inc.,,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Pioneer Landscapes,,,,,,,,,,, +LABORER,Journey,56.75,56.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.75,56.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.75 +Total for Contractor,Journey,56.75,56.75,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,56.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.75,56.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.75 +Ryan Medical Equipment,,,,,,,,,,, +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +SALAMON FLOORING INC,,,,,,,,,,, +FLOORCOVERER,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +LABORER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Stem Solutions, LLC",,,,,,,,,,, +CARPENTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,84.00,35.00,8.00,41.00,0.00,0.00,0.00,0.00,0.00,84.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,35.00,8.00,41.00,0.00,0.00,0.00,0.00,0.00,84.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",84.00,"35.00 8.0041.000.000.000.00","0.000.00 84.00",,,,,,,, +"",,,,,,,,,0.00,84.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,35.00,8.00,41.00,0.00,0.00,0.00,0.00,0.00,84.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,8.00,, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Titan Roofing, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",Apprentice,3.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.50,"3.50 0.000.000.000.000.00","0.000.00 3.50",,,,,,,, +"",,,,,,,,,,0.00,3.50 +"",Apprentice,3.50,0.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +"",A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +"Ultimate Construction, LLC",,,,,,,,,,, +CARPENTER,Journey,37.50,29.50,0.00,0.00,0.00,0.00,8.00,0.00,0.00,37.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.50,29.50,0.00,0.00,0.00,0.00,8.00,0.00,0.00,37.50 +Total for Contractor,Journey,37.50,29.50,0.00,0.00,0.00,0.00,8.00,0.00,, +"",,,,,,,,,,0.00,37.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.50,29.50,0.00,0.00,0.00,0.00,8.00,0.00,0.00,37.50 +"Universal Electric Company, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Walch & Company Inc.,,,,,,,,,,, +CARPENTER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Whitehawk Construction Services, Inc.",,,,,,,,,,, +CARPENTER,Journey,315.50,315.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,315.50,315.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.50 +Total for Contractor,Journey,315.50,315.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,315.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,315.50,315.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.50, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,555.75","2,261.25",17.75,268.75,0.00,0.00,8.00,0.00,0.00,"2,555.75" +Total Apprentice Hours,262.50,259.00,3.50,0.00,0.00,0.00,0.00,0.00,0.00,262.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,818.25","2,520.25",21.25,268.75,0.00,0.00,8.00,0.00,0.00,"2,818.25" +"Project Name: DCP1712 OM2 C Job Order Contract Central Region Project Code: DCP1712 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Gibson Roofs, Inc.",,,,,,,,,,, +ROOFER,Journey,145.50,97.50,32.00,16.00,0.00,0.00,0.00,0.00,0.00,145.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,145.50,97.50,32.00,16.00,0.00,0.00,0.00,0.00,0.00,145.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",145.50,"97.50 32.0016.000.000.000.00","0.000.00 145.50",,,,,,,, +"",,,,,,,,,,0.00,145.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,145.50,97.50,32.00,16.00,0.00,0.00,0.00,0.00,0.00,145.50 +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +LABORER,Journey,26.00,21.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,26.00,21.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",54.00,"49.00 5.000.000.000.000.00","0.000.00 54.00",,,,,,,, +"",,,,,,,,,0.00,54.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,54.00,49.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00, +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,199.50,146.50,37.00,16.00,0.00,0.00,0.00,0.00,0.00,199.50 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,199.50,146.50,37.00,16.00,0.00,0.00,0.00,0.00,0.00,199.50 +"Project Name: DCP1908 OM1 C Job Order Contract for General Contractor Services – Central Region Project Code: DCP1908 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Charles Services & Equipment,,,,,,,,,,, +LABORER,Journey,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",124.00,"124.00 0.000.000.000.000.00","0.000.00 124.00",,,,,,,, +"",,,,,,,,,,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +LABORER,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",74.00,"74.00 0.000.000.000.000.00","0.000.00 74.00",,,,,,,, +"",,,,,,,,,0.00,74.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,74.00,74.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,74.00, +"J.C. Cannistraro, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00 +"",Apprentice,24.00,0.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,70.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,94.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",70.00,"70.00 0.000.000.000.000.00","0.000.00 70.00",,,,,,,, +"",,,,,,,,,,0.00,70.00 +"",Apprentice,24.00,0.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,70.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,94.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,37.00,8.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,37.00 +"",A/J Ratio,0.58,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.58 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,72.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,101.00 +Total for Contractor,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,64.00 +"",Apprentice,37.00,8.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,37.00 +"",A/J Ratio,0.58,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.58 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,101.00,72.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,101.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +DRIVER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +Total for Contractor,Journey,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,174.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,174.00,174.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,628.00,628.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,628.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,628.00,628.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,628.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",788.00,"788.00 0.000.000.000.000.00","0.000.00 788.00",,,,,,,, +"",,,,,,,,,0.00,788.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,788.00,788.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,788.00, +Total Journey Hours,"1,318.00","1,318.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,318.00", +Total Apprentice Hours,61.00,8.00,0.00,0.00,53.00,0.00,0.00,0.00,0.00,61.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,379.00","1,326.00",0.00,0.00,53.00,0.00,0.00,0.00,0.00,"1,379.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",18.00,"18.00 0.000.000.000.000.00","0.000.00 18.00",,,,,,,, +"",,,,,,,,,,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,261.50,261.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,261.50,261.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.50 +Total for Contractor,Journey,261.50,261.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,261.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,261.50,261.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,261.50, +Total Journey Hours,279.50,279.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,279.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,279.50,279.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,279.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ACV Concrete LLC,,,,,,,,,,, +LABORER,Journey,72.00,0.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,0.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00 +LABORER: CARPENTER TENDER,Journey,48.00,0.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,0.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,48.00 +Total for Contractor,Journey,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,0.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,120.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.00,"112.00 0.000.000.000.000.00","0.000.00 112.00",,,,,,,, +"",,,,,,,,,0.00,112.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +Araujo Bro Plumbing Inc,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",Apprentice,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,314.00,314.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,314.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",157.00,"157.00 0.000.000.000.000.00","0.000.00 157.00",,,,,,,, +"",,,,,,,,,,0.00,157.00 +"",Apprentice,157.00,157.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,157.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,314.00,314.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,314.00 +Atlantic Contracting & Specialties,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Central Mass Crane Service Inc.,,,,,,,,,,, +OPERATING ENGINEERS,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00 +"",Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",A/J Ratio,0.15,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,209.00,209.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,209.00 +SHEETMETAL WORKER,Journey,13.00,6.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,6.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Total for Contractor,Journey,194.00,187.50,6.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,194.00 +"",Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",A/J Ratio,0.14,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.00,215.50,6.50,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +"Greenfield Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",30.00,"30.00 0.000.000.000.000.00","0.000.00 30.00",,,,,,,, +"",,,,,,,,,,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,166.00,166.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,166.00,166.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,166.00 +DRIVER,Journey,6.75,6.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.75,6.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.75 +LABORER,Journey,140.25,140.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,140.25,140.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,313.00,313.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,313.00 +"William F. Lynch Co., Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",58.00,"58.00 0.000.000.000.000.00","0.000.00 58.00",,,,,,,, +"",,,,,,,,0.00,58.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00, +Total Journey Hours,999.00,872.50,6.50,120.00,0.00,0.00,0.00,0.00,0.00,999.00, +Total Apprentice Hours,185.00,185.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,185.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,184.00","1,057.50",6.50,120.00,0.00,0.00,0.00,0.00,0.00,"1,184.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,68.50,68.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.50,68.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.50 +LABORER,Journey,68.50,68.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,68.50,68.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.50 +Total for Contractor,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,137.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +"Baystate Contracting Services, Inc.",,,,,,,,,,, +"LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER",Journey,75.00,25.00,0.00,50.00,0.00,0.00,0.00,0.00,0.00,75.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,25.00,0.00,50.00,0.00,0.00,0.00,0.00,0.00,75.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",75.00,"25.00 0.0050.000.000.000.00","0.000.00 75.00",,,,,,,, +"",,,,,,,,,0.00,75.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,25.00,0.00,50.00,0.00,0.00,0.00,0.00,0.00,75.00, +"General Mechanical Contractors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,,,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Lizotte Glass, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,21.50,13.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,21.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.50,13.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,21.50 +Total for Contractor,Journey,21.50,13.00,0.00,8.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,21.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.50,13.00,0.00,8.50,0.00,0.00,0.00,0.00,0.00,21.50 +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: MASON TENDER,Journey,56.50,56.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.50,56.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.50,"144.50 0.000.000.000.000.00","0.000.00 144.50",,,,,,,, +"",,,,,,,,,0.00,144.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,144.50,144.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.50, +Total Journey Hours,383.00,324.50,0.00,58.50,0.00,0.00,0.00,0.00,0.00,383.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,383.00,324.50,0.00,58.50,0.00,0.00,0.00,0.00,0.00,383.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +andy ramos electric llc,,,,,,,,,,, +ELECTRICIAN,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +LABORER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Total for Contractor,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Dagle Electrical Construction Corp.,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Professional Fire Systems, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY",Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",25.00,"25.00 0.000.000.000.000.00","0.000.00 25.00",,,,,,,, +"",,,,,,,,,0.00,25.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00, +Total Journey Hours,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00, +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PLUMBERS & GASFITTERS,Journey,135.00,135.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,135.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,135.00,135.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,135.00 +SHEETMETAL WORKER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,175.00,175.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,175.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,175.00,175.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,175.00 +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,254.00,254.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,254.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,254.00,254.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,254.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,254.00,254.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,254.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,254.00,254.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,254.00 +Ayotte and King for Tile Inc.,,,,,,,,,,, +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",180.00,"180.00 0.000.000.000.000.00","0.000.00 180.00",,,,,,,, +"",,,,,,,,,,0.00,180.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +LABORER: CARPENTER TENDER,Journey,80.00,0.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,0.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,192.00,112.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,112.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,192.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +"",Apprentice,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",A/J Ratio,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.00,440.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,460.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",440.00,"440.00 0.000.000.000.000.00","0.000.00 440.00",,,,,,,, +"",,,,,,,,,,0.00,440.00 +"",Apprentice,20.00,0.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",A/J Ratio,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,460.00,440.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,460.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,29.00,29.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.00 +"",A/J Ratio,0.45,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,366.00,366.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,366.00,366.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",366.00,"366.00 0.000.000.000.000.00","0.000.00 366.00",,,,,,,, +"",,,,,,,,,0.00,366.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,366.00,366.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,366.00 +"K&M Fire Protection Services, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.44,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,79.00,79.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00 +Total for Contractor,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,55.00,, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.44,0.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.44, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,79.00,79.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00, +MTJ Landscapes,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00 +"SPECIALIZED EARTH MOVING EQUIP < 35 TONS",Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,44.00,36.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.00,36.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,44.00 +Performance Testing and Balancing,,,,,,,,,,, +HVAC (TESTING AND BALANCING - AIR),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +SOS Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"64.00 0.008.000.000.000.00","0.000.00 72.00",,,,,,,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,64.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,147.00,147.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,147.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,147.00,147.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,147.00 +LABORER: MASON TENDER,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",229.00,"229.00 0.000.000.000.000.00","0.000.00 229.00",,,,,,,, +"",,,,,,,,,0.00,229.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,229.00,229.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,229.00, +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,123.00,43.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,123.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,123.00,43.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,123.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",123.00,"43.00 0.0080.000.000.000.00","0.000.00 123.00",,,,,,,, +"",,,,,,,,,,0.00,123.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,123.00,43.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,123.00 +Synergy Electrical Systems LLC,,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,121.00,73.00,0.00,0.00,48.00,0.00,0.00,0.00,0.00,121.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,121.00,73.00,0.00,0.00,48.00,0.00,0.00,0.00,0.00,121.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,280.00,226.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,280.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,280.00,226.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,280.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",401.00,"299.00 0.0054.0048.000.000.00","0.000.00 401.00",,,,,,,, +"",,,,,,,,,,0.00,401.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,401.00,299.00,0.00,54.00,48.00,0.00,0.00,0.00,0.00,401.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,92.25,92.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.25 +"",Apprentice,49.75,8.00,16.75,25.00,0.00,0.00,0.00,0.00,0.00,49.75 +"",A/J Ratio,0.54,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,142.00,100.25,16.75,25.00,0.00,0.00,0.00,0.00,0.00,142.00 +SHEETMETAL WORKER,Journey,217.50,217.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,217.50 +Apprentice,144.50,144.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.50, +A/J Ratio,0.66,0.66,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.66, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,362.00,362.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,362.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",309.75,"309.75 0.000.000.000.000.00","0.000.00 309.75",,,,,,,, +"",,,,,,,,,0.00,309.75, +Apprentice,194.25,152.50,16.75,25.00,0.00,0.00,0.00,0.00,0.00,194.25, +A/J Ratio,0.63,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,504.00,462.25,16.75,25.00,0.00,0.00,0.00,0.00,0.00,504.00, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,545.25,545.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,545.25 +"",Apprentice,160.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,705.25,545.25,160.00,0.00,0.00,0.00,0.00,0.00,0.00,705.25 +TELECOMMUNICATION TECHNICIAN,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,585.25,585.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,585.25, +Apprentice,160.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +A/J Ratio,0.27,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,745.25,585.25,160.00,0.00,0.00,0.00,0.00,0.00,0.00,745.25, +Total Journey Hours,"3,514.00","3,236.00",0.00,230.00,48.00,0.00,0.00,0.00,0.00,"3,514.00", +Total Apprentice Hours,435.25,213.50,176.75,45.00,0.00,0.00,0.00,0.00,0.00,435.25, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,949.25","3,449.50",176.75,275.00,48.00,0.00,0.00,0.00,0.00,"3,949.25", +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,144.00,91.00,0.00,18.00,35.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,144.00,91.00,0.00,18.00,35.00,0.00,0.00,0.00,0.00,144.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.00,"91.00 0.0018.0035.000.000.00","0.000.00 144.00",,,,,,,, +"",,,,,,,,0.00,144.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,144.00,91.00,0.00,18.00,35.00,0.00,0.00,0.00,0.00,144.00, +Total Journey Hours,144.00,91.00,0.00,18.00,35.00,0.00,0.00,0.00,0.00,144.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,144.00,91.00,0.00,18.00,35.00,0.00,0.00,0.00,0.00,144.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: NEC1601 HC1 C Northern Essex Community College Lawrence Campus Dimitry Exterior Improvements Project Code: NEC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,45.00,29.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,45.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.00,29.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,45.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",45.00,"29.00 0.000.000.000.000.00","16.000.00 45.00",,,,,,,, +"",,,,,,,,0.00,45.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.00,29.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,45.00, +Total Journey Hours,45.00,29.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,45.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,45.00,29.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00,45.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: POL1702 FC1 C State Police New Braintree Boiler Modifications and Replacement Project Code: POL1702 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PIPEFITTER & STEAMFITTER,Journey,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00 +Total for Contractor,Journey,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,31.00,, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.26, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +Total Journey Hours,31.00,31.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,31.00, +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +"Project Name: QCC1601 HC1 C HVAC Upgrades to Surprenant Hall Quinsigamond Community College Project Code: QCC1601 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.50,"7.50 0.000.000.000.000.00","0.000.00 7.50",,,,,,,, +"",,,,,,,,0.00,7.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +Total Journey Hours,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",0.00,"0.00 0.000.000.000.000.00","0.000.00 0.00",,,,,,,, +"",,,,,,,,,,0.00,0.00 +"",Apprentice,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total Journey Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +Total Apprentice Hours,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,142.50,142.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.50 +"",Apprentice,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +"",A/J Ratio,0.54,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.50,219.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,219.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",142.50,"142.50 0.000.000.000.000.00","0.000.00 142.50",,,,,,,, +"",,,,,,,,,,0.00,142.50 +"",Apprentice,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +"",A/J Ratio,0.54,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.50,219.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,219.50 +B&B Lightning Protection,,,,,,,,,,, +ELECTRICIAN,Journey,17.75,11.50,6.25,0.00,0.00,0.00,0.00,0.00,0.00,17.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.75,11.50,6.25,0.00,0.00,0.00,0.00,0.00,0.00,17.75 +Total for Contractor,Journey,17.75,11.50,6.25,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,17.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.75,11.50,6.25,0.00,0.00,0.00,0.00,0.00,0.00,17.75 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,185.39,0.00,0.00,0.00,0.00,0.00,185.39,0.00,0.00,185.39 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,185.39,0.00,0.00,0.00,0.00,0.00,185.39,0.00,0.00,185.39, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,185.18,0.00,0.00,0.00,0.00,0.00,185.18,0.00,0.00,185.18 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,185.18,0.00,0.00,0.00,0.00,0.00,185.18,0.00,0.00,185.18 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",370.57,"0.00 0.000.000.000.00370.57","0.000.00 370.57",,,,,,,, +"",,,,,,,,,,0.00,370.57 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,370.57,0.00,0.00,0.00,0.00,0.00,370.57,0.00,0.00,370.57 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.00 +"",Apprentice,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +Total for Contractor,Journey,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,159.00 +"",Apprentice,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,45.50,45.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",67.00,"67.00 0.000.000.000.000.00","0.000.00 67.00",,,,,,,, +"",,,,,,,,,0.00,67.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +"",Apprentice,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",A/J Ratio,0.84,0.84,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.50,106.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.50 +LABORER: CARPENTER TENDER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",106.00,"106.00 0.000.000.000.000.00","0.000.00 106.00",,,,,,,, +"",,,,,,,,0.00,106.00,, +Apprentice,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50, +A/J Ratio,0.46,0.46,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.46, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,154.50,154.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,862.82,486.00,6.25,0.00,0.00,0.00,370.57,0.00,0.00,862.82 +Total Apprentice Hours,194.50,194.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,057.32",680.50,6.25,0.00,0.00,0.00,370.57,0.00,0.00,"1,057.32" +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,112.00,8.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,8.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,112.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.00,"8.00 0.00104.000.000.000.00","0.000.00 112.00",,,,,,,, +"",,,,,,,,,,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,8.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,112.00 +"Action Steel, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +Total for Contractor,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,467.00,467.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,467.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,619.00,619.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,619.00 +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,483.00,483.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,483.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.31,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,635.00,635.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,635.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,511.00,511.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,511.00 +Apprentice,549.50,252.00,156.00,141.50,0.00,0.00,0.00,0.00,63.00,486.50, +A/J Ratio,1.08,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.95, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,060.50",763.00,156.00,141.50,0.00,0.00,0.00,0.00,63.00,997.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,511.00,511.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,511.00 +"",Apprentice,549.50,252.00,156.00,141.50,0.00,0.00,0.00,0.00,63.00,486.50 +"",A/J Ratio,1.08,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.95 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,060.50",763.00,156.00,141.50,0.00,0.00,0.00,0.00,63.00,997.50 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +IRONWORKER/WELDER,Journey,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Total for Contractor,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,296.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"2,717.00","2,445.00",0.00,272.00,0.00,0.00,0.00,0.00,0.00,"2,717.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,717.00","2,445.00",0.00,272.00,0.00,0.00,0.00,0.00,0.00,"2,717.00", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,832.00,832.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,832.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,832.00,832.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,832.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","3,549.00","3,277.00 0.00272.000.000.000.00","0.000.00 3,549.00",,,,,,,, +"",,,,,,,,,0.00,"3,549.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,549.00","3,277.00",0.00,272.00,0.00,0.00,0.00,0.00,0.00,"3,549.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +LABORER: MULTI-TRADE TENDER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,0.00 +"PAINTER (SPRAY OR SANDBLAST, NEW)",Journey,98.00,14.00,0.00,78.00,6.00,0.00,0.00,0.00,0.00,98.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,14.00,0.00,78.00,6.00,0.00,0.00,0.00,0.00,98.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,380.00,160.00,0.00,144.00,76.00,0.00,0.00,0.00,0.00,380.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,380.00,160.00,0.00,144.00,76.00,0.00,0.00,0.00,0.00,380.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,558.00,254.00,0.00,222.00,82.00,0.00,0.00,0.00,80.00,478.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,558.00,254.00,0.00,222.00,82.00,0.00,0.00,0.00,80.00,478.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,214.50,214.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,214.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,214.50,214.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,214.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,184.50,184.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,176.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.50,184.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,176.50 +Total for Contractor,Journey,399.00,399.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,8.00,391.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,399.00,399.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,391.00 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,769.50,769.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,769.50 +"",Apprentice,169.00,0.00,0.00,169.00,0.00,0.00,0.00,0.00,169.00,0.00 +"",A/J Ratio,0.22,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,938.50,769.50,0.00,169.00,0.00,0.00,0.00,0.00,169.00,769.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",921.50,"921.50 0.000.000.000.000.00","0.000.00 921.50",,,,,,,, +"",,,,,,,,,,0.00,921.50 +"",Apprentice,169.00,0.00,0.00,169.00,0.00,0.00,0.00,0.00,169.00,0.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,090.50",921.50,0.00,169.00,0.00,0.00,0.00,0.00,169.00,921.50 +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,175.50,175.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,175.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,175.50,175.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,175.50 +LABORER,Journey,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",492.50,"492.50 0.000.000.000.000.00","0.000.00 492.50",,,,,,,, +"",,,,,,,,,0.00,492.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,492.50,492.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,492.50, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +PLUMBERS & GASFITTERS,Journey,572.00,508.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,572.00 +"",Apprentice,79.00,79.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00 +"",A/J Ratio,0.14,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,651.00,587.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,651.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",572.00,"508.00 64.000.000.000.000.00","0.000.00 572.00",,,,,,,, +"",,,,,,,,,,0.00,572.00 +"",Apprentice,79.00,79.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00 +"",A/J Ratio,0.14,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,651.00,587.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,651.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +INSULATOR (PIPES & TANKS),Journey,660.50,476.50,0.00,0.00,184.00,0.00,0.00,0.00,0.00,660.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,660.50,476.50,0.00,0.00,184.00,0.00,0.00,0.00,0.00,660.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",684.50,"500.50 0.000.00184.000.000.00","0.000.00 684.50",,,,,,,, +"",,,,,,,,,0.00,684.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,684.50,500.50,0.00,0.00,184.00,0.00,0.00,0.00,0.00,684.50, +Emanouil Landscaping,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +LABORER,Journey,48.00,32.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,32.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,48.00 +Total for Contractor,Journey,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,64.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,80.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,516.00,516.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,516.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,516.00,516.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,516.00 +LABORER: MASON TENDER,Journey,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,876.00,876.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,876.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,876.00,876.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,876.00 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,,,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"Federal Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.00,45.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,45.00 +LABORER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,41.00,24.50,16.50,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +"",Apprentice,24.50,24.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.50 +"",A/J Ratio,0.60,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.60 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,65.50,49.00,16.50,0.00,0.00,0.00,0.00,0.00,0.00,65.50 +SHEETMETAL WORKER,Journey,51.00,25.50,25.50,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",Apprentice,8.00,0.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.16 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,59.00,25.50,25.50,0.00,8.00,0.00,0.00,0.00,0.00,59.00 +Total for Contractor,Journey,92.00,50.00,42.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,92.00 +"",Apprentice,32.50,24.50,0.00,0.00,8.00,0.00,0.00,0.00,0.00,32.50 +"",A/J Ratio,0.35,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.50,74.50,42.00,0.00,8.00,0.00,0.00,0.00,0.00,124.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,678.50,486.50,184.00,8.00,0.00,0.00,0.00,0.00,0.00,678.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,678.50,486.50,184.00,8.00,0.00,0.00,0.00,0.00,0.00,678.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,678.50,486.50,184.00,8.00,0.00,0.00,0.00,0.00,0.00,678.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,678.50,486.50,184.00,8.00,0.00,0.00,0.00,0.00,0.00,678.50 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,141.00,93.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,141.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,141.00,93.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,141.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",141.00,"93.00 0.0048.000.000.000.00","0.000.00 141.00",,,,,,,, +"",,,,,,,,,,0.00,141.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,141.00,93.00,0.00,48.00,0.00,0.00,0.00,0.00,0.00,141.00 +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +LABORER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +SPRINKLER FITTER,Journey,182.00,182.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.00 +Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +A/J Ratio,0.88,0.88,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.88, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,342.00,342.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,342.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,326.00,326.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,326.00 +"",Apprentice,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +"",A/J Ratio,0.49,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.49 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,486.00,486.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,486.00 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,54.00,34.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,54.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,34.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,54.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",54.00,"34.00 0.000.000.000.0020.00","0.000.00 54.00",,,,,,,, +"",,,,,,,,,0.00,54.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,34.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,54.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,610.50,610.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,610.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.50,610.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,610.50 +Total for Contractor,Journey,610.50,610.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,610.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,610.50,610.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,610.50, +Longden Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,212.00,212.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,212.00 +"",Apprentice,112.00,0.00,0.00,0.00,112.00,0.00,0.00,0.00,112.00,0.00 +"",A/J Ratio,0.53,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,324.00,212.00,0.00,0.00,112.00,0.00,0.00,0.00,112.00,212.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",212.00,"212.00 0.000.000.000.000.00","0.000.00 212.00",,,,,,,, +"",,,,,,,,,,0.00,212.00 +"",Apprentice,112.00,0.00,0.00,0.00,112.00,0.00,0.00,0.00,112.00,0.00 +"",A/J Ratio,0.53,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,324.00,212.00,0.00,0.00,112.00,0.00,0.00,0.00,112.00,212.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"32.00 0.008.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,32.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,40.00, +New England Deck & Floors Incorporated,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: CEMENT FINISHER TENDER,Journey,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,593.00,377.00,0.00,216.00,0.00,0.00,0.00,0.00,144.00,449.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,593.00,377.00,0.00,216.00,0.00,0.00,0.00,0.00,144.00,449.00 +Total for Contractor,Journey,795.00,579.00,0.00,216.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,144.00,651.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,795.00,579.00,0.00,216.00,0.00,0.00,0.00,0.00,144.00,651.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",160.00,"160.00 0.000.000.000.000.00","0.000.00 160.00",,,,,,,, +"",,,,,,,,,0.00,160.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +Patrick J. Kennedy & Sons,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,352.00,120.00,120.00,112.00,0.00,0.00,0.00,0.00,0.00,352.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,352.00,120.00,120.00,112.00,0.00,0.00,0.00,0.00,0.00,352.00 +PIPEFITTER & STEAMFITTER,Journey,972.00,972.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,972.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,972.00,972.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,972.00 +Total for Contractor,Journey,972.00,972.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,972.00 +"",Apprentice,352.00,120.00,120.00,112.00,0.00,0.00,0.00,0.00,0.00,352.00 +"",A/J Ratio,0.36,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.36 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,324.00","1,092.00",120.00,112.00,0.00,0.00,0.00,0.00,0.00,"1,324.00" +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"8.00 0.000.000.000.008.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,16.00, +"RicMor Construction, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00 +"",A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,24.00 +Total for Contractor,Journey,48.00,24.00,0.00,24.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,48.00, +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00 +"",A/J Ratio,0.33,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,40.00,0.00,24.00,0.00,0.00,0.00,0.00,16.00,48.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +CARPENTER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +ELEVATOR CONSTRUCTOR,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +IRONWORKER/WELDER,Journey,84.00,72.00,0.00,12.00,0.00,0.00,0.00,0.00,0.00,84.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,84.00,72.00,0.00,12.00,0.00,0.00,0.00,0.00,0.00,84.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,56.00,40.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,40.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,56.00 +MECHANICS MAINTENANCE,Journey,277.50,277.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,277.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,277.50,277.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,277.50 +Total for Contractor,Journey,519.50,491.50,0.00,28.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,519.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,519.50,491.50,0.00,28.00,0.00,0.00,0.00,0.00,0.00,519.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,517.00,407.00,100.00,10.00,0.00,0.00,0.00,0.00,0.00,517.00 +"",Apprentice,133.00,0.00,0.00,133.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",A/J Ratio,0.26,0.00,0.00,13.30,0.00,0.00,0.00,0.00,0.00,0.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,650.00,407.00,100.00,143.00,0.00,0.00,0.00,0.00,0.00,650.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,533.00,423.00,100.00,10.00,0.00,0.00,0.00,0.00,0.00,533.00 +"",Apprentice,133.00,0.00,0.00,133.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",A/J Ratio,0.25,0.00,0.00,13.30,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,666.00,423.00,100.00,143.00,0.00,0.00,0.00,0.00,0.00,666.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +IRONWORKER/WELDER,Journey,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,61.00 +LABORER,Journey,37.00,18.00,19.00,0.00,0.00,0.00,0.00,0.00,16.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,37.00,18.00,19.00,0.00,0.00,0.00,0.00,0.00,16.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",98.00,"79.00 19.000.000.000.000.00","0.0016.00 82.00",,,,,,,, +"",,,,,,,,,16.00,82.00, +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00, +A/J Ratio,0.08,0.10,0.00,0.00,0.00,0.00,0.00,0.00,0.50,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,106.00,87.00,19.00,0.00,0.00,0.00,0.00,0.00,24.00,82.00, +"Valley Communications Systems, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,89.75,89.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.75,89.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",89.75,"89.75 0.000.000.000.000.00","0.000.00 89.75",,,,,,,, +"",,,,,,,,,,0.00,89.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,89.75,89.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,89.75 +ver-tex construction specialties,,,,,,,,,,, +JOURNEYMAN LINEMAN,Journey,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +Total for Contractor,Journey,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,143.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"2,199.00","1,866.00",0.00,333.00,0.00,0.00,0.00,0.00,0.00,"2,199.00" +Apprentice,"1,010.25",542.25,0.00,340.00,128.00,0.00,0.00,0.00,0.00,"1,010.25", +A/J Ratio,0.46,0.29,0.00,1.02,0.00,0.00,0.00,0.00,0.00,0.46, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"3,209.25","2,408.25",0.00,673.00,128.00,0.00,0.00,0.00,0.00,"3,209.25", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,625.00,492.00,0.00,0.00,133.00,0.00,0.00,0.00,0.00,625.00 +"",Apprentice,178.00,178.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,178.00 +"",A/J Ratio,0.28,0.36,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,803.00,670.00,0.00,0.00,133.00,0.00,0.00,0.00,0.00,803.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,824.00","2,358.00 0.00333.00133.000.000.00","0.000.00 2,824.00",,,,,,,, +"",,,,,,,,,,0.00,"2,824.00" +"",Apprentice,"1,188.25",720.25,0.00,340.00,128.00,0.00,0.00,0.00,0.00,"1,188.25" +"",A/J Ratio,0.42,0.31,0.00,1.02,0.96,0.00,0.00,0.00,0.00,0.42 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"4,012.25","3,078.25",0.00,673.00,261.00,0.00,0.00,0.00,0.00,"4,012.25" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",A/J Ratio,0.56,0.56,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.56 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +MARBLE & TILE FINISHERS,Journey,64.00,8.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.25,0.00,0.00,0.29,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,8.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,80.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,208.00,88.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,208.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,208.00,88.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,208.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,308.00,132.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,308.00 +"",Apprentice,36.00,20.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.12,0.15,0.00,0.09,0.00,0.00,0.00,0.00,0.00,0.12 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,344.00,152.00,0.00,192.00,0.00,0.00,0.00,0.00,0.00,344.00 +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,308.00,308.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,308.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,308.00,308.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,308.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",308.00,"308.00 0.000.000.000.000.00","0.000.00 308.00",,,,,,,, +"",,,,,,,,0.00,308.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,308.00,308.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,308.00, +Total Journey Hours,"19,000.75","16,699.75",409.00,"1,465.00",399.00,0.00,28.00,0.00,248.00,"18,752.75", +Total Apprentice Hours,"2,987.25","1,551.75",276.00,911.50,248.00,0.00,0.00,0.00,368.00,"2,619.25", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"21,988.00","18,251.50",685.00,"2,376.50",647.00,0.00,28.00,0.00,616.00,"21,372.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,88.00,86.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,86.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.00,"86.00 0.000.002.000.000.00","0.000.00 88.00",,,,,,,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,86.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,88.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,342.00,342.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,342.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,342.00,342.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,342.00 +LABORER,Journey,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",522.00,"522.00 0.000.000.000.000.00","0.000.00 522.00",,,,,,,, +"",,,,,,,,,0.00,522.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,522.00,522.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,522.00, +Crocker Architectural Sheet Metal,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +Total for Contractor,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,175.00,171.50,0.00,0.00,0.00,0.00,3.50,0.00,0.00,175.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,175.00,171.50,0.00,0.00,0.00,0.00,3.50,0.00,0.00,175.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",183.00,"179.50 0.000.000.000.003.50","0.000.00 183.00",,,,,,,, +"",,,,,,,,,0.00,183.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,183.00,179.50,0.00,0.00,0.00,0.00,3.50,0.00,0.00,183.00 +Veterans Scaffold,,,,,,,,,,, +LABORER,Journey,182.00,182.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,182.00,182.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.00 +Total for Contractor,Journey,182.00,182.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,182.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,182.00,182.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.00, +Total Journey Hours,"1,002.00",996.50,0.00,0.00,2.00,0.00,3.50,0.00,0.00,"1,002.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,002.00",996.50,0.00,0.00,2.00,0.00,3.50,0.00,0.00,"1,002.00", +"Project Name: TRC1214 HC1 C TRC Haverhill District Court Various Improvements/Renovations Project Code: TRC1214 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"E. Amanti & Sons, Inc",,,,,,,,,,, +SHEETMETAL WORKER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +WoodCraft Designers & Builders LLC,,,,,,,,,,, +CARPENTER,Journey,11.00,4.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,4.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,11.00 +Total for Contractor,Journey,11.00,4.00,0.00,0.00,0.00,0.00,7.00,0.00,, +"",,,,,,,,,0.00,11.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,4.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,11.00, +Total Journey Hours,13.00,6.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,13.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,13.00,6.00,0.00,0.00,0.00,0.00,7.00,0.00,0.00,13.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",Apprentice,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Total for Contractor,Journey,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,66.00 +"",Apprentice,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,40.00 +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,40.00,44.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,44.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,322.50,322.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,322.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,322.50,322.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,322.50 +LABORER,Journey,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,77.00,77.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,77.00 +Total for Contractor,Journey,399.50,399.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,399.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,399.50,399.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,399.50 +Kenney Masonry,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,247.00,247.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,247.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER: MASON TENDER,Journey,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,127.00,127.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,127.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",374.00,"374.00 0.000.000.000.000.00","0.000.00 374.00",,,,,,,, +"",,,,,,,,,,0.00,374.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,374.00,374.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,374.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,25.00,25.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,25.00 +PLUMBERS & GASFITTERS,Journey,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",75.00,"75.00 0.000.000.000.000.00","0.000.00 75.00",,,,,,,, +"",,,,,,,,,0.00,75.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,75.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,75.00, +"North Shore Steel Company, Inc",,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,8.00,0.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,24.00,0.00,0.00,16.00,0.00,0.00,8.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,16.00,0.00,0.00,8.00,0.00,0.00,24.00 +Total for Contractor,Journey,32.00,0.00,0.00,16.00,8.00,0.00,8.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,16.00,8.00,0.00,8.00,0.00,0.00,32.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",39.00,"39.00 0.000.000.000.000.00","0.000.00 39.00",,,,,,,, +"",,,,,,,,,0.00,39.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +SOS Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,24.00,8.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.33,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"8.00 0.0016.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.33,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,102.00,78.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,102.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,78.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,102.00 +Total for Contractor,Journey,102.00,78.00,0.00,24.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,102.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.00,78.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,102.00 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,256.75,256.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,256.75,256.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,256.75,256.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,256.75,256.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.75, +Total Journey Hours,"1,584.25","1,512.25",0.00,56.00,8.00,0.00,8.00,0.00,40.00,"1,544.25", +Total Apprentice Hours,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,598.25","1,526.25",0.00,56.00,8.00,0.00,8.00,0.00,40.00,"1,558.25", +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,140.00,140.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,140.00,140.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,140.00 +ELEVATOR CONSTRUCTOR HELPER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Total for Contractor,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,268.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",296.00,"296.00 0.000.000.000.000.00","0.000.00 296.00",,,,,,,, +"",,,,,,,,,0.00,296.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +LABORER,Journey,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +PIPEFITTER & STEAMFITTER,Journey,382.00,286.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,382.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,382.00,286.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,382.00 +Total for Contractor,Journey,598.00,502.00,96.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,598.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,598.00,502.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,598.00, +Total Journey Hours,"1,162.00","1,066.00",96.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,162.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,162.00","1,066.00",96.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,162.00", diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportNov2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportNov2019.csv new file mode 100644 index 00000000..1d06523f --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportNov2019.csv @@ -0,0 +1,4189 @@ +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,152.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,152.00 +PIPEFITTER & STEAMFITTER,Journey,"1,015.50","1,015.50",0.00,0.00,0.00,0.00,0.00,0.00,8.00,"1,007.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,015.50","1,015.50",0.00,0.00,0.00,0.00,0.00,0.00,8.00,"1,007.50" +Total for Contractor,Journey,"1,015.50","1,015.50",0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,8.00,"1,007.50" +"",Apprentice,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,152.00 +"",A/J Ratio,0.26,0.26,0.00,0.00,0.00,0.00,0.00,0.00,14.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,279.50","1,279.50",0.00,0.00,0.00,0.00,0.00,0.00,120.00,"1,159.50" +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,"2,120.00","1,399.00",321.00,248.00,0.00,0.00,152.00,0.00,152.00,"1,968.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,120.00","1,399.00",321.00,248.00,0.00,0.00,152.00,0.00,152.00,"1,968.00", +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,772.00,772.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,772.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,772.00,772.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,772.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,892.00","2,171.00 321.00248.000.000.00152.00","0.00152.00 2,740.00",,,,,,,, +"",,,,,,,,,152.00,"2,740.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,892.00","2,171.00",321.00,248.00,0.00,0.00,152.00,0.00,152.00,"2,740.00" +Fall River Electrical Assoc.,,,,,,,,,,, +ELECTRICIAN,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00 +"",A/J Ratio,0.64,0.64,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.64 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,367.00,367.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,367.00 +Total for Contractor,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,224.00,, +Apprentice,143.00,143.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,143.00, +A/J Ratio,0.64,0.64,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.64, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,367.00,367.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,367.00, +Total Journey Hours,"4,131.50","3,410.50",321.00,248.00,0.00,0.00,152.00,0.00,160.00,"3,971.50", +Total Apprentice Hours,407.00,407.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00,295.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"4,538.50","3,817.50",321.00,248.00,0.00,0.00,152.00,0.00,272.00,"4,266.50", +"Project Name: BSB1403 HC1 C State House Data Center Relocation Project Code: BSB1403 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LeVangie Electric Co. Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,24.00,0.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,24.00 +TELECOMMUNICATION TECHNICIAN,Journey,168.00,0.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.00 +"",A/J Ratio,0.85,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.85 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,310.00,142.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,310.00 +Total for Contractor,Journey,192.00,0.00,168.00,0.00,24.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,192.00 +"",Apprentice,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.00 +"",A/J Ratio,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.74 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,334.00,142.00,168.00,0.00,24.00,0.00,0.00,0.00,0.00,334.00 +N B Kenney Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: BSB1403 HC1 C State House Data Center Relocation Project Code: BSB1403 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,208.00,16.00,168.00,0.00,24.00,0.00,0.00,0.00,0.00,208.00 +Total Apprentice Hours,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,350.00,158.00,168.00,0.00,24.00,0.00,0.00,0.00,0.00,350.00 +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Lawrence Lynch Corp,,,,,,,,,,, +DRIVER,Journey,10.00,4.50,5.50,0.00,0.00,0.00,0.00,0.00,5.50,4.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,4.50,5.50,0.00,0.00,0.00,0.00,0.00,5.50,4.50 +EQUIPMENT OPERATOR (Class B CDL),Journey,438.00,438.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00,251.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,438.00,438.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00,251.00 +LABORER,Journey,844.00,787.50,28.00,0.00,0.00,0.00,28.50,0.00,14.00,830.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,844.00,787.50,28.00,0.00,0.00,0.00,28.50,0.00,14.00,830.00 +MECHANICS MAINTENANCE,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,294.00","1,232.00 33.500.000.000.0028.50","0.00206.50 1,087.50",,,,,,,, +"",,,,,,,,,206.50,"1,087.50", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,294.00","1,232.00",33.50,0.00,0.00,0.00,28.50,0.00,206.50,"1,087.50", +"Sullivan & McLaughlin Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,293.00,293.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,293.00 +Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +A/J Ratio,0.38,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",293.00,"293.00 0.000.000.000.000.00","0.000.00 293.00",,,,,,,, +"",,,,,,,,,0.00,293.00, +Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +A/J Ratio,0.38,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,405.00,405.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,405.00, +Total Journey Hours,"1,587.00","1,525.00",33.50,0.00,0.00,0.00,28.50,0.00,206.50,"1,380.50", +Total Apprentice Hours,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,699.00","1,637.00",33.50,0.00,0.00,0.00,28.50,0.00,206.50,"1,492.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",120.00,"120.00 0.000.000.000.000.00","0.000.00 120.00",,,,,,,, +"",,,,,,,,,,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,33.25,33.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.25 +"",Apprentice,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",A/J Ratio,0.99,0.99,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.99 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.25,66.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.25 +Total for Contractor,Journey,33.25,33.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,33.25 +"",Apprentice,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",A/J Ratio,0.99,0.99,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.99 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.25,66.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.25 +B&B Lightning Protection,,,,,,,,,,, +ELECTRICIAN,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"Capeway Roofing Systems, Inc.",,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,132.50,132.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,132.50,132.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.50 +ROOFER,Journey,"1,015.50",854.00,161.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,015.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,015.50",854.00,161.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,015.50" +Total for Contractor,Journey,"1,148.00",986.50,161.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,148.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,148.00",986.50,161.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,148.00" +"Colantonio, Inc.",,,,,,,,,,, +CARPENTER,Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",240.00,"240.00 0.000.000.000.000.00","0.000.00 240.00",,,,,,,, +"",,,,,,,,,,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,240.00 +"Dandis Contracting, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH,REPAINT)",Journey,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,14.00 +Total for Contractor,Journey,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,0.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,14.00 +"E. Amanti & Sons, Inc",,,,,,,,,,, +LABORER,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +PIPEFITTER & STEAMFITTER,Journey,128.00,8.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,8.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,128.00 +SHEETMETAL WORKER,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +Total for Contractor,Journey,340.00,220.00,0.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,340.00, +"",Apprentice,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",A/J Ratio,0.11,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,376.00,256.00,0.00,120.00,0.00,0.00,0.00,0.00,0.00,376.00 +"Marmelo Brothers Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,546.00,546.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,546.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,546.00,546.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,546.00 +LABORER: MASON TENDER,Journey,342.00,0.00,167.00,175.00,0.00,0.00,0.00,0.00,0.00,342.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,342.00,0.00,167.00,175.00,0.00,0.00,0.00,0.00,0.00,342.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,888.00,546.00,167.00,175.00,0.00,0.00,0.00,0.00,0.00,888.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,888.00,546.00,167.00,175.00,0.00,0.00,0.00,0.00,0.00,888.00 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,12.00,0.00,4.00,8.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,0.00,4.00,8.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"0.00 4.008.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,0.00,4.00,8.00,0.00,0.00,0.00,0.00,0.00,12.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,1.25,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,1.25,15.00 +Total for Contractor,Journey,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,1.25,15.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,1.25,15.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"2,820.00","2,170.50",332.50,317.00,0.00,0.00,0.00,0.00,1.25,"2,818.75" +Total Apprentice Hours,69.00,69.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,69.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"2,889.00","2,239.50",332.50,317.00,0.00,0.00,0.00,0.00,1.25,"2,887.75" +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Bowline Construction,,,,,,,,,,,, +CARPENTER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"",A/J Ratio,0.05,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +LABORER,Journey,200.00,60.00,0.00,140.00,0.00,0.00,0.00,0.00,0.00,200.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,200.00,60.00,0.00,140.00,0.00,0.00,0.00,0.00,0.00,200.00, +Total for Contractor,Journey,352.00,212.00,0.00,140.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,352.00, +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"",A/J Ratio,0.02,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,360.00,220.00,0.00,140.00,0.00,0.00,0.00,0.00,0.00,360.00, +Grasseschi Plumbing,,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,,, +"",,,,,,,,,0.00,6.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00,, +John W. Egan Company Inc.,,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"0.000.00 6.00", +0.00,6.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,,, +"",,,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,660.50,437.00,223.50,0.00,0.00,0.00,0.00,0.00,0.00,660.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,660.50,437.00,223.50,0.00,0.00,0.00,0.00,0.00,0.00,660.50, +LABORER,Journey,846.50,846.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,846.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,846.50,846.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,846.50,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,507.00","1,283.50 223.500.000.000.000.00","0.000.00 1,507.00",,,,,,,,, +"",,,,,,,,,0.00,"1,507.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,"1,507.00","1,283.50",223.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,507.00",, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +"0.000.00 16.00", +0.00,16.00 +"0.000.00 1,507.00", +0.00,"1,507.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +ELECTRICIAN,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00,, +A/J Ratio,0.84,0.84,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.00,"38.00 0.000.000.000.000.00","0.000.00 38.00",,,,,,,,, +"",,,,,,,,,0.00,38.00,, +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00,, +A/J Ratio,0.84,0.84,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,70.00,70.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.00,, +Total Journey Hours,"1,919.00","1,555.50",223.50,140.00,0.00,0.00,0.00,0.00,0.00,"1,919.00",, +Total Apprentice Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,"1,959.00","1,595.50",223.50,140.00,0.00,0.00,0.00,0.00,0.00,"1,959.00",, +"0.000.00 38.00", +0.00,38.00 +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"King Painting, Inc.",,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,6.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +Total Journey Hours,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +Total Apprentice Hours,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J & S Concrete Pumping and Grouting, Inc.",,,,,,,,,,, +CARPENTER,Journey,29.00,21.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,29.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.00,21.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,29.00 +CEMENT MASONRY/PLASTERING,Journey,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +EQUIPMENT OPERATOR (Class A CDL),Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,46.00,26.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,46.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,46.00,26.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,46.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",87.00,"55.00 0.0032.000.000.000.00","0.000.00 87.00",,,,,,,, +"",,,,,,,,,0.00,87.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,87.00,55.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,87.00, +N.E.L. Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,373.00,365.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,365.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,373.00,365.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,365.00 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,7.00,3.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,7.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.00,3.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,7.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",396.00,"380.00 0.0016.000.000.000.00","0.008.00 388.00",,,,,,,, +"",,,,,,,,,8.00,388.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,396.00,380.00,0.00,16.00,0.00,0.00,0.00,0.00,8.00,388.00, +Total Journey Hours,483.00,435.00,0.00,48.00,0.00,0.00,0.00,0.00,8.00,475.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,483.00,435.00,0.00,48.00,0.00,0.00,0.00,0.00,8.00,475.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Harold Brothers Mechanical Contractors, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",35.00,"35.00 0.000.000.000.000.00","0.000.00 35.00",,,,,,,, +"",,,,,,,,,,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +N B Kenney Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +PIPEFITTER & STEAMFITTER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +PLUMBERS & GASFITTERS,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,123.00,123.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,123.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,123.00,123.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,123.00 +W S Aiken LLC,,,,,,,,,,, +ROOFER,Journey,52.00,0.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,52.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,0.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,52.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",52.00,"0.00 0.000.000.000.0052.00","0.000.00 52.00",,,,,,,, +"",,,,,,,,0.00,52.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,52.00,0.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,52.00, +Total Journey Hours,210.00,158.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,210.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,210.00,158.00,0.00,0.00,0.00,0.00,52.00,0.00,0.00,210.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,61.00,0.00,0.00,24.00,37.00,0.00,0.00,0.00,0.00,61.00 +"",Apprentice,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +"",A/J Ratio,0.61,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.61 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,37.00,0.00,24.00,37.00,0.00,0.00,0.00,0.00,98.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",61.00,"0.00 0.0024.0037.000.000.00","0.000.00 61.00",,,,,,,, +"",,,,,,,,,,0.00,61.00 +"",Apprentice,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +"",A/J Ratio,0.61,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.61 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,98.00,37.00,0.00,24.00,37.00,0.00,0.00,0.00,0.00,98.00 +"Clean Team, The",,,,,,,,,,, +LABORER,Journey,9.00,0.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,0.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,9.00 +Total for Contractor,Journey,9.00,0.00,0.00,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,0.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,9.00 +"Interstate Office Partitions, Inc.",,,,,,,,,,, +CARPENTER,Journey,242.00,220.00,0.00,0.00,0.00,0.00,22.00,0.00,0.00,242.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,242.00,220.00,0.00,0.00,0.00,0.00,22.00,0.00,0.00,242.00, +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,242.00,220.00,0.00,0.00,0.00,0.00,22.00,0.00,0.00,242.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,242.00,220.00,0.00,0.00,0.00,0.00,22.00,0.00,0.00,242.00 +JC Flooring Company,,,,,,,,,,, +FLOORCOVERER,Journey,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"0.00 0.002.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,0.00,2.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +Tremont HVAC LLC,,,,,,,,,,, +SHEETMETAL WORKER,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Total for Contractor,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,1.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Watermark Environmental, Incorporated",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",34.00,"34.00 0.000.000.000.000.00","0.000.00 34.00",,,,,,,, +"",,,,,,,,,0.00,34.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Journey Hours,349.00,255.00,0.00,35.00,37.00,0.00,22.00,0.00,0.00,349.00, +Total Apprentice Hours,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,386.00,292.00,0.00,35.00,37.00,0.00,22.00,0.00,0.00,386.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Ambient Temperature Corp.,,,,,,,,,,, +HVAC MECHANIC,Journey,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",202.00,"202.00 0.000.000.000.000.00","0.000.00 202.00",,,,,,,, +"",,,,,,,,,,0.00,202.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +American Sheetmetal,,,,,,,,,,, +SHEETMETAL WORKER,Journey,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.21,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,94.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.00 +Total for Contractor,Journey,78.00,78.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,78.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.21,0.21,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.21 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,94.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.00 +Brightview Landscape,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.08,0.00,8.08,0.00,0.00,0.00,0.00,0.00,0.00,8.08 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.08,0.00,8.08,0.00,0.00,0.00,0.00,0.00,0.00,8.08, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +EQUIPMENT OPERATOR (Class A CDL),Journey,16.12,16.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.12 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.12,16.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.12 +LABORER,Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +Total for Contractor,Journey,72.70,64.62,8.08,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.70 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.70,64.62,8.08,0.00,0.00,0.00,0.00,0.00,0.00,72.70 +Charles Services & Equipment,,,,,,,,,,, +CARPENTER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +LABORER,Journey,205.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,205.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,205.00,205.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,205.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,357.00,357.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,357.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,357.00,357.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,357.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +LABORER,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +Total for Contractor,Journey,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,227.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00 +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,173.00,167.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,173.00 +Apprentice,46.50,3.50,0.00,43.00,0.00,0.00,0.00,0.00,0.00,46.50, +A/J Ratio,0.27,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.27, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,219.50,171.00,5.50,43.00,0.00,0.00,0.00,0.00,0.00,219.50, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"170.50 5.500.000.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,,,0.00,176.00 +"",Apprentice,46.50,3.50,0.00,43.00,0.00,0.00,0.00,0.00,0.00,46.50 +"",A/J Ratio,0.26,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.26 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.50,174.00,5.50,43.00,0.00,0.00,0.00,0.00,0.00,222.50 +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,121.00,82.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,121.00,82.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +Total for Contractor,Journey,121.00,82.00,39.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,121.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,121.00,82.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,121.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,447.00,423.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,447.00 +Apprentice,183.00,24.00,0.00,0.00,159.00,0.00,0.00,0.00,0.00,183.00, +A/J Ratio,0.41,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,630.00,447.00,0.00,24.00,159.00,0.00,0.00,0.00,0.00,630.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,447.00,423.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,447.00 +"",Apprentice,183.00,24.00,0.00,0.00,159.00,0.00,0.00,0.00,0.00,183.00 +"",A/J Ratio,0.41,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,630.00,447.00,0.00,24.00,159.00,0.00,0.00,0.00,0.00,630.00 +"Lemelin Environmental Services, Inc.",,,,,,,,,,, +LABORER,Journey,8.00,4.00,0.00,0.00,0.00,0.00,4.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,0.00,0.00,0.00,4.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"4.00 0.000.000.000.004.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,0.00,0.00,0.00,4.00,0.00,0.00,8.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,275.00,275.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,275.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,275.00,275.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,275.00 +CEMENT MASONRY/PLASTERING,Journey,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,278.00,278.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,278.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +LABORER,Journey,441.50,405.00,36.50,0.00,0.00,0.00,0.00,0.00,0.00,441.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,441.50,405.00,36.50,0.00,0.00,0.00,0.00,0.00,0.00,441.50 +Total for Contractor,Journey,"1,077.50","1,041.00",36.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,077.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,077.50","1,041.00",36.50,0.00,0.00,0.00,0.00,0.00,0.00,"1,077.50" +"Manganaro Northeast, LLC",,,,,,,,,,, +CARPENTER,Journey,400.00,400.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,400.00 +"",Apprentice,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,572.00,572.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,572.00 +LABORER,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,436.00,436.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,436.00 +"",Apprentice,172.00,172.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.00 +"",A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,608.00,608.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,608.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"0.00 0.002.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00 +DRIVER,Journey,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,46.00,46.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,46.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,233.00,233.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,233.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,233.00,233.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,233.00 +Tri State Building LLC,,,,,,,,,,, +IRONWORKER/WELDER,Journey,869.00,669.00,0.00,0.00,0.00,0.00,200.00,0.00,143.00,726.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,869.00,669.00,0.00,0.00,0.00,0.00,200.00,0.00,143.00,726.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",869.00,"669.00 0.000.000.000.00200.00","0.00143.00 726.00",,,,,,,, +"",,,,,,,,,,143.00,726.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,869.00,669.00,0.00,0.00,0.00,0.00,200.00,0.00,143.00,726.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,257.00,257.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,257.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,257.00,257.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,257.00 +LABORER,Journey,792.00,768.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,792.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,792.00,768.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,792.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,049.00","1,025.00",0.00,24.00,0.00,0.00,0.00,0.00,0.00,"1,049.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,049.00","1,025.00",0.00,24.00,0.00,0.00,0.00,0.00,0.00,"1,049.00" +William M. Collins company Inc.,,,,,,,,,,, +SPRINKLER FITTER,Journey,251.00,146.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,251.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,251.00,146.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,251.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",251.00,"146.00 105.000.000.000.000.00","0.000.00 251.00",,,,,,,, +"",,,,,,,,0.00,251.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,251.00,146.00,105.00,0.00,0.00,0.00,0.00,0.00,0.00,251.00, +Total Journey Hours,"5,606.20","5,158.12",194.08,50.00,0.00,0.00,204.00,0.00,143.00,"5,463.20", +Total Apprentice Hours,417.50,215.50,0.00,43.00,159.00,0.00,0.00,0.00,0.00,417.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"6,023.70","5,373.62",194.08,93.00,159.00,0.00,204.00,0.00,143.00,"5,880.70", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,682.50,620.50,62.00,0.00,0.00,0.00,0.00,0.00,0.00,682.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,682.50,620.50,62.00,0.00,0.00,0.00,0.00,0.00,0.00,682.50 +Total for Contractor,Journey,682.50,620.50,62.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,682.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,682.50,620.50,62.00,0.00,0.00,0.00,0.00,0.00,0.00,682.50, +Total Journey Hours,702.50,640.50,62.00,0.00,0.00,0.00,0.00,0.00,0.00,702.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,702.50,640.50,62.00,0.00,0.00,0.00,0.00,0.00,0.00,702.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,280.00,280.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,280.00 +"",Apprentice,136.00,104.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00,104.00 +"",A/J Ratio,0.49,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,416.00,384.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00,384.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",280.00,"280.00 0.000.000.000.000.00","0.000.00 280.00",,,,,,,, +"",,,,,,,,,,0.00,280.00 +"",Apprentice,136.00,104.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00,104.00 +"",A/J Ratio,0.49,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,416.00,384.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00,384.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",Apprentice,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",A/J Ratio,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Total for Contractor,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,144.00 +"",Apprentice,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",A/J Ratio,0.83,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,264.00,264.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,264.00 +Atlantic Contracting & Specialties,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,182.50,182.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,182.50 +Debrino Caulking Associates Inc.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"8.00 0.008.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +Door & Security Solutions LLC,,,,,,,,,,, +CARPENTER,Journey,29.34,29.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.34 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,29.34,29.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.34 +Total for Contractor,Journey,29.34,29.34,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,29.34,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.34,29.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.34, +East Coast Fire & Ventilation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,74.00,46.00,0.00,0.00,0.00,0.00,28.00,0.00,0.00,74.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,74.00,46.00,0.00,0.00,0.00,0.00,28.00,0.00,0.00,74.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",74.00,"46.00 0.000.000.000.0028.00","0.000.00 74.00",,,,,,,, +"",,,,,,,,,,0.00,74.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,74.00,46.00,0.00,0.00,0.00,0.00,28.00,0.00,0.00,74.00 +"Greenfield Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.50 +"",Apprentice,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",A/J Ratio,0.95,0.95,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.95 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +Total for Contractor,Journey,9.50,9.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,9.50 +"",Apprentice,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",A/J Ratio,0.95,0.95,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.95 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"K & K Acoustical Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",304.00,"304.00 0.000.000.000.000.00","0.000.00 304.00",,,,,,,, +"",,,,,,,,,,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +Kittredge Equipment Company,,,,,,,,,,, +LABORER,Journey,75.75,75.75,0.00,0.00,0.00,0.00,0.00,0.00,20.75,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.75,75.75,0.00,0.00,0.00,0.00,0.00,0.00,20.75,55.00 +SHEETMETAL WORKER,Journey,425.25,425.25,0.00,0.00,0.00,0.00,0.00,0.00,155.25,270.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,425.25,425.25,0.00,0.00,0.00,0.00,0.00,0.00,155.25,270.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,501.00,501.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00,325.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,501.00,501.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00,325.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,172.25,172.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,172.25,172.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,172.25 +DRIVER,Journey,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,95.00,95.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.00 +LABORER,Journey,197.50,197.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,197.50,197.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",464.75,"464.75 0.000.000.000.000.00","0.000.00 464.75",,,,,,,, +"",,,,,,,,,0.00,464.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,464.75,464.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,464.75, +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,6.45,6.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.45 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.45,6.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.45 +"PAINTER / TAPER (BRUSH, NEW)",Journey,41.57,41.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.57 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.57,41.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.57 +Total for Contractor,Journey,48.02,48.02,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,48.02 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.02,48.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.02 +"TC Controls & Services, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,137.75,137.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.75 +Apprentice,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00, +A/J Ratio,0.38,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,190.75,190.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",137.75,"137.75 0.000.000.000.000.00","0.000.00 137.75",,,,,,,, +"",,,,,,,,,0.00,137.75, +Apprentice,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00, +A/J Ratio,0.38,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,190.75,190.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.75, +"William F. Lynch Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ADS/SUBMERSIBLE PILOT,Journey,76.00,0.00,0.00,0.00,0.00,0.00,76.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,0.00,0.00,0.00,0.00,0.00,76.00,0.00,0.00,76.00 +SHEETMETAL WORKER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Total for Contractor,Journey,212.00,136.00,0.00,0.00,0.00,0.00,76.00,0.00,, +"",,,,,,,,,0.00,212.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,212.00,136.00,0.00,0.00,0.00,0.00,76.00,0.00,0.00,212.00, +Total Journey Hours,"2,706.86","2,594.86",0.00,8.00,0.00,0.00,104.00,0.00,176.00,"2,530.86", +Total Apprentice Hours,318.00,286.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00,286.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,024.86","2,880.86",32.00,8.00,0.00,0.00,104.00,0.00,208.00,"2,816.86", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Commercial Air Control, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,376.00,264.00,112.00,0.00,0.00,0.00,0.00,0.00,112.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,376.00,264.00,112.00,0.00,0.00,0.00,0.00,0.00,112.00,264.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",376.00,"264.00 112.000.000.000.000.00","0.00112.00 264.00",,,,,,,, +"",,,,,,,,,,112.00,264.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,376.00,264.00,112.00,0.00,0.00,0.00,0.00,0.00,112.00,264.00 +J. Derenzo Companies,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +JOURNEYMAN LINEMAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,397.00,397.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,397.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,397.00,397.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,397.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,164.00,164.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,164.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,164.00,164.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,164.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",164.00,"164.00 0.000.000.000.000.00","0.000.00 164.00",,,,,,,, +"",,,,,,,,,,0.00,164.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,164.00,164.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,164.00 +Manny's Plumbing & Heating Inc.,,,,,,,,,,, +LABORER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +PLUMBERS & GASFITTERS,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Renewable Energy Systems - RES,,,,,,,,,,, +LABORER,Journey,150.50,150.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,150.50,150.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",150.50,"150.50 0.000.000.000.000.00","0.000.00 150.50",,,,,,,, +"",,,,,,,,,,0.00,150.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,150.50,150.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,150.50 +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,249.00,249.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,249.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,257.00,257.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,257.00 +PIPEFITTER & STEAMFITTER,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.03,0.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00, +Total Journey Hours,"1,459.50","1,347.50",112.00,0.00,0.00,0.00,0.00,0.00,112.00,"1,347.50", +Total Apprentice Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,467.50","1,355.50",112.00,0.00,0.00,0.00,0.00,0.00,112.00,"1,355.50", +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",42.00,"42.00 0.000.000.000.000.00","0.000.00 42.00",,,,,,,, +"",,,,,,,,0.00,42.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +Total Journey Hours,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Baystate Contracting Services, Inc.",,,,,,,,,,, +"LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER",Journey,176.50,34.25,117.50,24.75,0.00,0.00,0.00,0.00,0.00,176.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.50,34.25,117.50,24.75,0.00,0.00,0.00,0.00,0.00,176.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.50,"34.25 117.5024.750.000.000.00","0.000.00 176.50",,,,,,,, +"",,,,,,,,,,0.00,176.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.50,34.25,117.50,24.75,0.00,0.00,0.00,0.00,0.00,176.50 +"Lizotte Glass, Inc.",,,,,,,,,,, +GLAZIER,Journey,102.75,6.00,0.00,96.75,0.00,0.00,0.00,0.00,0.00,102.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,102.75,6.00,0.00,96.75,0.00,0.00,0.00,0.00,0.00,102.75 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,273.50,0.00,0.00,273.50,0.00,0.00,0.00,0.00,0.00,273.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,273.50,0.00,0.00,273.50,0.00,0.00,0.00,0.00,0.00,273.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",376.25,"6.00 0.00370.250.000.000.00","0.000.00 376.25",,,,,,,, +"",,,,,,,,,0.00,376.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,376.25,6.00,0.00,370.25,0.00,0.00,0.00,0.00,0.00,376.25, +"Sullivan & Narey Construction Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DYS1404E ES1 C Western Youth Center Comprehensive Design Build Energy Project Project Code: DYS1404E ES1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +LABORER: MASON TENDER,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +Total for Contractor,Journey,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,81.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00, +Total Journey Hours,633.75,121.25,117.50,395.00,0.00,0.00,0.00,0.00,0.00,633.75, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,633.75,121.25,117.50,395.00,0.00,0.00,0.00,0.00,0.00,633.75, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Banner Environmental Inc.,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,288.50,202.50,0.00,86.00,0.00,0.00,0.00,0.00,0.00,288.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,288.50,202.50,0.00,86.00,0.00,0.00,0.00,0.00,0.00,288.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",288.50,"202.50 0.0086.000.000.000.00","0.000.00 288.50",,,,,,,, +"",,,,,,,,,,0.00,288.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,288.50,202.50,0.00,86.00,0.00,0.00,0.00,0.00,0.00,288.50 +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +A/J Ratio,0.25,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",84.00,"84.00 0.000.000.000.000.00","0.000.00 84.00",,,,,,,, +"",,,,,,,,,0.00,84.00, +Apprentice,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +Dagle Electrical Construction Corp.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Evermore Light & Power, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,302.00,302.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,302.00 +"",Apprentice,171.00,171.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00,92.00 +"",A/J Ratio,0.57,0.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,473.00,473.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00,394.00 +Total for Contractor,Journey,302.00,302.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,302.00 +"",Apprentice,171.00,171.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00,92.00 +"",A/J Ratio,0.57,0.57,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,473.00,473.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00,394.00 +"Fraser Engineering Company, Inc.",,,,,,,,,,, +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +PIPEFITTER & STEAMFITTER,Journey,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,232.00 +PLUMBERS & GASFITTERS,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Total for Contractor,Journey,235.00,235.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,235.00 +"",Apprentice,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",A/J Ratio,0.85,0.85,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.85 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,435.00,435.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,435.00 +IKE Electric Inc,,,,,,,,,,, +ELECTRICIAN,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Apprentice,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,88.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,88.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,128.00 +"Noyes Sheet Metal, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,112.50,85.00,0.00,0.00,0.00,0.00,27.50,0.00,0.00,112.50 +"",Apprentice,122.50,122.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,122.50 +"",A/J Ratio,1.09,1.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,235.00,207.50,0.00,0.00,0.00,0.00,27.50,0.00,0.00,235.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",112.50,"85.00 0.000.000.000.0027.50","0.000.00 112.50",,,,,,,, +"",,,,,,,,,0.00,112.50, +"",Apprentice,122.50,122.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,122.50 +"",A/J Ratio,1.09,1.44,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,235.00,207.50,0.00,0.00,0.00,0.00,27.50,0.00,0.00,235.00 +O.B. Hill Trucking & Rigging Co Inc.,,,,,,,,,,, +DRIVER,Journey,127.00,55.00,0.00,0.00,0.00,0.00,72.00,0.00,0.00,127.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,127.00,55.00,0.00,0.00,0.00,0.00,72.00,0.00,0.00,127.00 +Total for Contractor,Journey,127.00,55.00,0.00,0.00,0.00,0.00,72.00,0.00,, +"",,,,,,,,0.00,127.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,127.00,55.00,0.00,0.00,0.00,0.00,72.00,0.00,0.00,127.00, +"Professional Fire Systems, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +SPRINKLER FITTER,Journey,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",118.00,"118.00 0.000.000.000.000.00","0.000.00 118.00",,,,,,,, +"",,,,,,,,,0.00,118.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,118.00,118.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,118.00 +"SSE Enterprise, LLC",,,,,,,,,,, +LABORER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,12.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00, +Total Journey Hours,"1,375.00","1,189.50",0.00,86.00,0.00,0.00,99.50,0.00,0.00,"1,375.00", +Total Apprentice Hours,545.50,505.50,0.00,40.00,0.00,0.00,0.00,0.00,79.00,466.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,920.50","1,695.00",0.00,126.00,0.00,0.00,99.50,0.00,79.00,"1,841.50", +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",83.00,"83.00 0.000.000.000.000.00","0.000.00 83.00",,,,,,,, +"",,,,,,,,,,0.00,83.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,83.00,83.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,83.00 +"Bay State Building Specialties, INC",,,,,,,,,,, +CARPENTER,Journey,16.00,0.00,0.00,0.00,0.00,8.00,8.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,8.00,8.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,0.00,0.00,0.00,0.00,8.00,8.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,0.00,0.00,8.00,8.00,0.00,0.00,16.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.0016.00 8.00",,,,,,,, +"",,,,,,,,,,16.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,8.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,73.50,73.50,0.00,0.00,0.00,0.00,0.00,0.00,16.00,57.50 +"",Apprentice,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +"",A/J Ratio,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,75.00,73.50,0.00,1.50,0.00,0.00,0.00,0.00,16.00,59.00 +Total for Contractor,Journey,73.50,73.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,16.00,57.50, +Apprentice,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50, +A/J Ratio,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,75.00,73.50,0.00,1.50,0.00,0.00,0.00,0.00,16.00,59.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,204.50,180.50,8.00,0.00,0.00,8.00,8.00,0.00,32.00,172.50 +Total Apprentice Hours,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,206.00,180.50,8.00,1.50,0.00,8.00,8.00,0.00,32.00,174.00 +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"American Environmental, Inc.",,,,,,,,,,, +DRIVER,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +LABORER,Journey,36.00,4.00,12.00,20.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,4.00,12.00,20.00,0.00,0.00,0.00,0.00,0.00,36.00 +Total for Contractor,Journey,41.50,9.50,12.00,20.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,41.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.50,9.50,12.00,20.00,0.00,0.00,0.00,0.00,0.00,41.50 +BG Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00, +A/J Ratio,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,264.00,248.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00,248.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",248.00,"248.00 0.000.000.000.000.00","0.000.00 248.00",,,,,,,, +"",,,,,,,,,0.00,248.00, +Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00, +A/J Ratio,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,264.00,248.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00,248.00, +"Chicopee Industrial Contractors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER / GROUNDMAN CDL,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +FORK LIFT/CHERRY PICKER,Journey,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +Total for Contractor,Journey,63.00,63.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,63.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,63.00,63.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,63.00 +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,497.00,497.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,497.00 +Apprentice,271.00,175.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,271.00, +A/J Ratio,0.55,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.55, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,768.00,672.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,768.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",497.00,"497.00 0.000.000.000.000.00","0.000.00 497.00",,,,,,,, +"",,,,,,,,,0.00,497.00, +Apprentice,271.00,175.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,271.00, +A/J Ratio,0.55,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.55, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,768.00,672.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,768.00, +G.O. Services. LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,20.00,12.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,12.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"12.00 8.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,12.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,58.00,58.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,58.00 +IRONWORKER/WELDER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,48.00,32.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,32.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,136.50,96.50,0.00,40.00,0.00,0.00,0.00,0.00,0.00,136.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.50,96.50,0.00,40.00,0.00,0.00,0.00,0.00,0.00,136.50 +Total for Contractor,Journey,184.50,128.50,0.00,40.00,16.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,184.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,184.50,128.50,0.00,40.00,16.00,0.00,0.00,0.00,0.00,184.50, +Total Journey Hours,"1,200.00","1,104.00",20.00,60.00,16.00,0.00,0.00,0.00,0.00,"1,200.00", +Total Apprentice Hours,287.00,175.00,112.00,0.00,0.00,0.00,0.00,0.00,16.00,271.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,487.00","1,279.00",132.00,60.00,16.00,0.00,0.00,0.00,16.00,"1,471.00", +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM INSTALLER,Journey,52.00,0.00,0.00,0.00,52.00,0.00,0.00,0.00,0.00,52.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,52.00,0.00,0.00,0.00,52.00,0.00,0.00,0.00,0.00,52.00 +FIRE ALARM REPAIR / MAINTENANCE,Journey,336.00,262.00,0.00,0.00,74.00,0.00,0.00,0.00,0.00,336.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,336.00,262.00,0.00,0.00,74.00,0.00,0.00,0.00,0.00,336.00 +Total for Contractor,Journey,388.00,262.00,0.00,0.00,126.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,388.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,388.00,262.00,0.00,0.00,126.00,0.00,0.00,0.00,0.00,388.00, +Total Journey Hours,388.00,262.00,0.00,0.00,126.00,0.00,0.00,0.00,0.00,388.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,388.00,262.00,0.00,0.00,126.00,0.00,0.00,0.00,0.00,388.00, +"",Journey,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +ELEVATOR CONSTRUCTOR,A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"",Journey,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total for Contractor,A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"",Total Journey Hours,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"",Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Grand Total Hours,204.00,200.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,204.00 +"Project Name: MCA1501E EC1- Campus Wide-Energy/Water Retrofit Project Code: MCA1501E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",37.00,"37.00 0.000.000.000.000.00","0.000.00 37.00",,,,,,,, +"",,,,,,,,0.00,37.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00, +Total Journey Hours,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,352.50,176.50,176.00,0.00,0.00,0.00,0.00,0.00,0.00,352.50 +"",Apprentice,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00,0.00 +"",A/J Ratio,0.52,1.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,536.50,360.50,176.00,0.00,0.00,0.00,0.00,0.00,184.00,352.50 +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,318.50,318.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,318.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,318.50,318.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,318.50 +Total for Contractor,Journey,671.00,495.00,176.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,671.00 +"",Apprentice,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00,0.00 +"",A/J Ratio,0.27,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,855.00,679.00,176.00,0.00,0.00,0.00,0.00,0.00,184.00,671.00 +"Glynn Electric, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,156.00,156.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00,126.00 +Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +A/J Ratio,0.31,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00,174.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",156.00,"156.00 0.000.000.000.000.00","0.0030.00 126.00",,,,,,,, +"",,,,,,,,,30.00,126.00, +Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +A/J Ratio,0.31,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00,174.00, +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,827.00,651.00,176.00,0.00,0.00,0.00,0.00,0.00,30.00,797.00 +Total Apprentice Hours,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00,48.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,059.00",883.00,176.00,0.00,0.00,0.00,0.00,0.00,214.00,845.00 +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ENERGY INSULATION CONSERVATION, INC.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.50 +CEMENT MASONRY/PLASTERING,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,46.50,0.00,0.00,0.00,46.50,0.00,0.00,0.00,0.00,46.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,46.50,0.00,0.00,0.00,46.50,0.00,0.00,0.00,0.00,46.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,105.00,58.50,0.00,0.00,46.50,0.00,0.00,0.00,0.00,105.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,105.00,58.50,0.00,0.00,46.50,0.00,0.00,0.00,0.00,105.00 +N B Kenney Company,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +PIPEFITTER & STEAMFITTER,Journey,216.00,216.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,216.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,216.00,216.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,216.00 +Total for Contractor,Journey,216.00,216.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,216.00 +"",Apprentice,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",A/J Ratio,0.52,0.52,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.52 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +Ostrow Electric Company,,,,,,,,,,, +ELECTRICIAN,Journey,197.00,66.00,0.00,131.00,0.00,0.00,0.00,0.00,0.00,197.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,197.00,66.00,0.00,131.00,0.00,0.00,0.00,0.00,0.00,197.00, +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,197.00,66.00,0.00,131.00,0.00,0.00,0.00,0.00,0.00,197.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,197.00,66.00,0.00,131.00,0.00,0.00,0.00,0.00,0.00,197.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +LABORER,Journey,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +Total for Contractor,Journey,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,142.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,142.00,142.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,142.00, +Total Journey Hours,684.00,506.50,0.00,131.00,46.50,0.00,0.00,0.00,0.00,684.00, +Total Apprentice Hours,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,796.00,618.50,0.00,131.00,46.50,0.00,0.00,0.00,0.00,796.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,257.00,190.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,257.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,257.00,190.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,257.00 +DRIVER,Journey,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +LABORER,Journey,443.50,427.00,0.00,16.50,0.00,0.00,0.00,0.00,0.00,443.50 +"",Apprentice,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +"",A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,530.50,514.00,0.00,16.50,0.00,0.00,0.00,0.00,0.00,530.50 +Total for Contractor,Journey,824.50,741.00,67.00,16.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,824.50 +"",Apprentice,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +"",A/J Ratio,0.11,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,911.50,828.00,67.00,16.50,0.00,0.00,0.00,0.00,0.00,911.50 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Manafort-Precision, LLC",,,,,,,,,,, +IRONWORKER/WELDER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Total for Contractor,Journey,23.50,23.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,23.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,23.50,23.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,23.50 +McDonald Electric Corporation,,,,,,,,,,, +ELECTRICIAN,Journey,275.00,275.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,275.00 +Apprentice,87.00,0.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00, +A/J Ratio,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,362.00,275.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,362.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,275.00,275.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,275.00 +"",Apprentice,87.00,0.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +"",A/J Ratio,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,362.00,275.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,362.00 +"Rustic Fire Protection, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,56.00,23.00,21.00,12.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,23.00,21.00,12.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",56.00,"23.00 21.0012.000.000.000.00","0.000.00 56.00",,,,,,,, +"",,,,,,,,0.00,56.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,23.00,21.00,12.00,0.00,0.00,0.00,0.00,0.00,56.00, +Total Journey Hours,"1,187.00","1,070.50",88.00,28.50,0.00,0.00,0.00,0.00,0.00,"1,187.00", +Total Apprentice Hours,174.00,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,174.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,361.00","1,157.50",175.00,28.50,0.00,0.00,0.00,0.00,0.00,"1,361.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: POL1702 FC1 C State Police New Braintree Boiler Modifications and Replacement Project Code: POL1702 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Royal Steam Heater Company,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +HVAC (DUCTWORK),Journey,33.00,25.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,25.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,33.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",33.00,"25.00 0.008.000.000.000.00","0.000.00 33.00",,,,,,,, +"",,,,,,,,,,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,25.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,33.00 +Heckman Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.50,17.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.50 +LABORER: MASON TENDER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",27.50,"27.50 0.000.000.000.000.00","0.000.00 27.50",,,,,,,, +"",,,,,,,,,0.00,27.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,27.50,27.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.50, +John W. Egan Company Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"PAINTER / TAPER (BRUSH, NEW)",Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,110.00,103.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,110.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,103.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,110.00 +PIPEFITTER & STEAMFITTER,Journey,355.00,355.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,355.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,355.00,355.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,355.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",355.00,"355.00 0.000.000.000.000.00","0.000.00 355.00",,,,,,,, +"",,,,,,,,,0.00,355.00, +Apprentice,110.00,103.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,110.00, +A/J Ratio,0.31,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.31, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,465.00,458.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,465.00, +Ostrow Electric Company,,,,,,,,,,, +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,489.00,489.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,489.00 +"",Apprentice,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,649.50,649.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,649.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",489.00,"489.00 0.000.000.000.000.00","0.000.00 489.00",,,,,,,, +"",,,,,,,,,0.00,489.00, +"",Apprentice,160.50,160.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.50 +"",A/J Ratio,0.33,0.33,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,649.50,649.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,649.50 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,0.00,, +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,916.50,908.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,916.50, +Total Apprentice Hours,286.50,279.50,0.00,7.00,0.00,0.00,0.00,0.00,0.00,286.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,203.00","1,188.00",0.00,15.00,0.00,0.00,0.00,0.00,0.00,"1,203.00", +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,11.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"0.00 11.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,0.00,11.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +Total Journey Hours,11.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,11.00,0.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +SHEETMETAL WORKER,Journey,352.00,0.00,0.00,352.00,0.00,0.00,0.00,0.00,0.00,352.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,352.00,0.00,0.00,352.00,0.00,0.00,0.00,0.00,0.00,352.00 +Total for Contractor,Journey,528.00,176.00,0.00,352.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,528.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,528.00,176.00,0.00,352.00,0.00,0.00,0.00,0.00,0.00,528.00 +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",180.00,"180.00 0.000.000.000.000.00","0.000.00 180.00",,,,,,,, +"",,,,,,,,,0.00,180.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,180.00,180.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,180.00, +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,166.50,104.00,0.00,0.00,62.50,0.00,0.00,0.00,0.00,166.50 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.14,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,190.50,128.00,0.00,0.00,62.50,0.00,0.00,0.00,0.00,190.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",166.50,"104.00 0.000.0062.500.000.00","0.000.00 166.50",,,,,,,, +"",,,,,,,,,,0.00,166.50 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.14,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,190.50,128.00,0.00,0.00,62.50,0.00,0.00,0.00,0.00,190.50 +Complete Labor and Staffing LLC,,,,,,,,,,, +LABORER,Journey,115.50,54.50,0.00,61.00,0.00,0.00,0.00,0.00,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,54.50,0.00,61.00,0.00,0.00,0.00,0.00,0.00,115.50 +Total for Contractor,Journey,115.50,54.50,0.00,61.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,54.50,0.00,61.00,0.00,0.00,0.00,0.00,0.00,115.50 +GML Construction Inc,,,,,,,,,,, +LABORER,Journey,0.72,0.00,0.00,0.00,0.00,0.00,0.72,0.00,0.00,0.72 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,0.72,0.00,0.00,0.00,0.00,0.00,0.72,0.00,0.00,0.72, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,0.72,0.00,0.00,0.00,0.00,0.00,0.72,0.00,0.00,0.72 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,0.72,0.00,0.00,0.00,0.00,0.00,0.72,0.00,0.00,0.72 +"H Carr & Sons, Inc",,,,,,,,,,, +LABORER,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.00,73.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.00 +Total for Contractor,Journey,219.00,219.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,219.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,219.00,219.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,219.00 +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,123.50,123.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,123.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,123.50,123.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,123.50, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ROOFER,Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",Apprentice,130.00,130.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",A/J Ratio,2.55,2.55,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.55 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",174.50,"174.50 0.000.000.000.000.00","0.000.00 174.50",,,,,,,, +"",,,,,,,,,,0.00,174.50 +"",Apprentice,130.00,130.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",A/J Ratio,0.74,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.74 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.50,304.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.50 +"Lighthouse Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,785.00,785.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,785.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,785.00,785.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,785.00 +LABORER: MASON TENDER,Journey,898.00,378.00,0.00,520.00,0.00,0.00,0.00,0.00,0.00,898.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,898.00,378.00,0.00,520.00,0.00,0.00,0.00,0.00,0.00,898.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,683.00","1,163.00 0.00520.000.000.000.00","0.000.00 1,683.00",,,,,,,, +"",,,,,,,,,0.00,"1,683.00", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,683.00","1,163.00",0.00,520.00,0.00,0.00,0.00,0.00,0.00,"1,683.00", +N B Kenney Company,,,,,,,,,,, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +PIPEFITTER & STEAMFITTER,Journey,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +PLUMBERS & GASFITTERS,Journey,224.00,224.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.32,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",364.00,"364.00 0.000.000.000.000.00","0.000.00 364.00",,,,,,,, +"",,,,,,,,,0.00,364.00, +"",Apprentice,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",A/J Ratio,0.38,0.38,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,502.00,502.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,502.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,48.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00,48.00 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +CEMENT MASONRY/PLASTERING,Journey,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +LABORER: CARPENTER TENDER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +LABORER: CEMENT FINISHER TENDER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,255.00,255.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,255.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,255.00,255.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,255.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,73.50,73.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.50,73.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",73.50,"73.50 0.000.000.000.000.00","0.000.00 73.50",,,,,,,, +"",,,,,,,,,,0.00,73.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,73.50,73.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,73.50 +TradeSource,,,,,,,,,,, +CARPENTER,Journey,88.00,0.00,0.00,0.00,0.00,0.00,88.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,0.00,0.00,0.00,0.00,0.00,88.00,0.00,0.00,88.00 +Total for Contractor,Journey,88.00,0.00,0.00,0.00,0.00,0.00,88.00,0.00,, +"",,,,,,,,,0.00,88.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,0.00,0.00,0.00,0.00,0.00,88.00,0.00,0.00,88.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"3,895.72","2,787.50",0.00,933.00,62.50,0.00,88.72,24.00,0.00,"3,895.72" +Total Apprentice Hours,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"4,187.72","3,079.50",0.00,933.00,62.50,0.00,88.72,24.00,0.00,"4,187.72" +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Adams & Ruxton Construction Company,,,,,,,,,,, +CARPENTER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.00,"88.00 0.000.000.000.000.00","0.000.00 88.00",,,,,,,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"American Environmental, Inc.",,,,,,,,,,, +LABORER,Journey,192.00,0.00,72.00,120.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,0.00,72.00,120.00,0.00,0.00,0.00,0.00,0.00,192.00 +Total for Contractor,Journey,192.00,0.00,72.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,0.00,72.00,120.00,0.00,0.00,0.00,0.00,0.00,192.00 +BG Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Electrical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00 +"",Apprentice,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,584.00,432.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,584.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",432.00,"432.00 0.000.000.000.000.00","0.000.00 432.00",,,,,,,, +"",,,,,,,,,0.00,432.00, +"",Apprentice,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,584.00,432.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,584.00 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,21.00,5.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,5.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,21.00 +Total for Contractor,Journey,21.00,5.00,8.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,21.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,5.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,21.00, +T & M Equipment Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,113.50,97.50,0.00,0.00,16.00,0.00,0.00,0.00,0.00,113.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,113.50,97.50,0.00,0.00,16.00,0.00,0.00,0.00,0.00,113.50 +LABORER,Journey,303.00,262.00,0.00,41.00,0.00,0.00,0.00,0.00,0.00,303.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,303.00,262.00,0.00,41.00,0.00,0.00,0.00,0.00,0.00,303.00 +Total for Contractor,Journey,416.50,359.50,0.00,41.00,16.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,416.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,416.50,359.50,0.00,41.00,16.00,0.00,0.00,0.00,0.00,416.50, +Total Journey Hours,"1,197.50",932.50,80.00,169.00,16.00,0.00,0.00,0.00,0.00,"1,197.50", +Total Apprentice Hours,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,349.50",932.50,80.00,321.00,16.00,0.00,0.00,0.00,0.00,"1,349.50", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,228.00,120.00,0.00,108.00,0.00,0.00,0.00,0.00,0.00,228.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,228.00,120.00,0.00,108.00,0.00,0.00,0.00,0.00,0.00,228.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,244.00,136.00,0.00,108.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,244.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,136.00,0.00,108.00,0.00,0.00,0.00,0.00,0.00,244.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.00,"80.00 0.000.000.000.000.00","0.000.00 80.00",,,,,,,, +"",,,,,,,,,0.00,80.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +Automated Building Systems,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00 +"",Apprentice,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00,8.00 +"",A/J Ratio,0.56,0.56,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,488.00,488.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00,320.00 +PIPEFITTER & STEAMFITTER,Journey,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.00,260.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,260.00 +Total for Contractor,Journey,572.00,572.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,572.00 +"",Apprentice,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00,8.00 +"",A/J Ratio,0.31,0.31,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,748.00,748.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00,580.00 +Baron Industries,,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,821.50,821.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,821.50 +"",Apprentice,311.00,239.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,311.00 +"",A/J Ratio,0.38,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,132.50","1,060.50",72.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,132.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",821.50,"821.50 0.000.000.000.000.00","0.000.00 821.50",,,,,,,, +"",,,,,,,,,,0.00,821.50 +"",Apprentice,311.00,239.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,311.00 +"",A/J Ratio,0.38,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,132.50","1,060.50",72.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,132.50" +"Chandler Architectural Products, Inc.",,,,,,,,,,, +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,21.00,0.00,0.00,21.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,0.00,0.00,21.00,0.00,0.00,0.00,0.00,0.00,21.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,48.00,32.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,48.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,32.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,48.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"32.00 0.0016.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,0.00,48.00, +Apprentice,21.00,0.00,0.00,21.00,0.00,0.00,0.00,0.00,0.00,21.00, +A/J Ratio,0.44,0.00,0.00,1.31,0.00,0.00,0.00,0.00,0.00,0.44, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,69.00,32.00,0.00,37.00,0.00,0.00,0.00,0.00,0.00,69.00, +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GLAZIER,Journey,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,86.50,86.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.50,86.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.50 +IRONWORKER/WELDER,Journey,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +Total for Contractor,Journey,294.50,254.50,0.00,40.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,294.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,294.50,254.50,0.00,40.00,0.00,0.00,0.00,0.00,0.00,294.50 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"1,678.00","1,678.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,678.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,678.00","1,678.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,678.00" +LABORER,Journey,246.50,246.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,246.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,246.50,246.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,246.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,924.50","1,924.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,924.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,924.50","1,924.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,924.50" +"Convergint Technologies, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",92.00,"92.00 0.000.000.000.000.00","0.000.00 92.00",,,,,,,, +"",,,,,,,,,0.00,92.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +"Cyber Communications Solutions, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Total for Contractor,Journey,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,5.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +"Dandis Contracting, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: MULTI-TRADE TENDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,772.00,408.00,0.00,348.00,16.00,0.00,0.00,0.00,8.00,764.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,772.00,408.00,0.00,348.00,16.00,0.00,0.00,0.00,8.00,764.00 +PAINTER BRUSH NEW,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,250.00,214.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,250.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,250.00,214.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,250.00 +Total for Contractor,Journey,796.00,432.00,0.00,348.00,16.00,0.00,0.00,0.00,, +"",,,,,,,,,32.00,764.00, +"",Apprentice,250.00,214.00,0.00,36.00,0.00,0.00,0.00,0.00,0.00,250.00 +"",A/J Ratio,0.31,0.50,0.00,0.10,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,046.00",646.00,0.00,384.00,16.00,0.00,0.00,0.00,32.00,"1,014.00" +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,375.75,375.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,375.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,375.75,375.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,375.75 +ELEVATOR CONSTRUCTOR HELPER,Journey,139.25,139.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,139.25,139.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,139.25, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,515.00,515.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,515.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,515.00,515.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,515.00 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,314.00,314.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,314.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,314.00,314.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,314.00 +LABORER,Journey,"1,384.50","1,368.50",0.00,16.00,0.00,0.00,0.00,0.00,0.00,"1,384.50" +"",Apprentice,217.00,0.00,0.00,217.00,0.00,0.00,0.00,0.00,217.00,0.00 +"",A/J Ratio,0.16,0.00,0.00,13.56,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,601.50","1,368.50",0.00,233.00,0.00,0.00,0.00,0.00,217.00,"1,384.50" +Total for Contractor,Journey,"1,698.50","1,682.50",0.00,16.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,698.50" +"",Apprentice,217.00,0.00,0.00,217.00,0.00,0.00,0.00,0.00,217.00,0.00 +"",A/J Ratio,0.13,0.00,0.00,13.56,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,915.50","1,682.50",0.00,233.00,0.00,0.00,0.00,0.00,217.00,"1,698.50" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,269.00,269.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,269.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,269.00,269.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,269.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,487.50,471.50,0.00,16.00,0.00,0.00,0.00,0.00,8.00,479.50 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,0.00 +"",A/J Ratio,0.13,0.14,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,551.50,535.50,0.00,16.00,0.00,0.00,0.00,0.00,72.00,479.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",756.50,"740.50 0.0016.000.000.000.00","0.008.00 748.50",,,,,,,, +"",,,,,,,,,,8.00,748.50 +"",Apprentice,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,0.00 +"",A/J Ratio,0.08,0.09,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,820.50,804.50,0.00,16.00,0.00,0.00,0.00,0.00,72.00,748.50 +"E. Amanti & Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +LABORER,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +PLUMBERS & GASFITTERS,Journey,420.00,420.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,420.00 +Apprentice,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00, +A/J Ratio,0.45,0.45,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,610.00,610.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,610.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,518.00,518.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,518.00 +"",Apprentice,190.00,190.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,190.00 +"",A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,708.00,708.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,708.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,224.00,56.00,0.00,0.00,168.00,0.00,0.00,0.00,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,56.00,0.00,0.00,168.00,0.00,0.00,0.00,0.00,224.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",224.00,"56.00 0.000.00168.000.000.00","0.000.00 224.00",,,,,,,, +"",,,,,,,,,,0.00,224.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.00,56.00,0.00,0.00,168.00,0.00,0.00,0.00,0.00,224.00 +Emanouil Landscaping,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,204.00,204.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.00 +LABORER,Journey,768.50,556.50,0.00,212.00,0.00,0.00,0.00,0.00,188.00,580.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,768.50,556.50,0.00,212.00,0.00,0.00,0.00,0.00,188.00,580.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,972.50,760.50,0.00,212.00,0.00,0.00,0.00,0.00,188.00,784.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,972.50,760.50,0.00,212.00,0.00,0.00,0.00,0.00,188.00,784.50 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +LABORER: MASON TENDER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total for Contractor,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.50,21.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,"1,374.00",803.00,180.00,203.00,188.00,0.00,0.00,0.00,0.00,"1,374.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,374.00",803.00,180.00,203.00,188.00,0.00,0.00,0.00,0.00,"1,374.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,374.00","803.00 180.00203.00188.000.000.00","0.000.00 1,374.00",,,,,,,, +"",,,,,,,,,0.00,"1,374.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,374.00",803.00,180.00,203.00,188.00,0.00,0.00,0.00,0.00,"1,374.00" +Front Line Inc,,,,,,,,,,, +LABORER,Journey,"2,057.00",664.00,0.00,"1,393.00",0.00,0.00,0.00,0.00,551.00,"1,506.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,057.00",664.00,0.00,"1,393.00",0.00,0.00,0.00,0.00,551.00,"1,506.00" +Total for Contractor,Journey,"2,057.00",664.00,0.00,"1,393.00",0.00,0.00,0.00,0.00,, +"",,,,,,,,551.00,"1,506.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"2,057.00",664.00,0.00,"1,393.00",0.00,0.00,0.00,0.00,551.00,"1,506.00", +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FIRE ALARM INSTALLER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +LABORER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00 +SPRINKLER FITTER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",A/J Ratio,0.67,0.67,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.67 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +Total for Contractor,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,138.00 +"",Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",A/J Ratio,0.58,0.58,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.58 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,218.00,218.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,218.00 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,36.00,18.00,0.00,0.00,0.00,0.00,18.00,0.00,0.00,36.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.00,18.00,0.00,0.00,0.00,0.00,18.00,0.00,0.00,36.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,36.00,18.00,0.00,0.00,0.00,0.00,18.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,18.00,0.00,0.00,0.00,0.00,18.00,0.00,0.00,36.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,930.50,930.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,930.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,930.50,930.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,930.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",930.50,"930.50 0.000.000.000.000.00","0.000.00 930.50",,,,,,,, +"",,,,,,,,,0.00,930.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,930.50,930.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,930.50 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",Apprentice,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,44.00,, +Apprentice,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Lymo Construction Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,452.00,452.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,452.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.32,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,596.00,596.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,596.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",452.00,"452.00 0.000.000.000.000.00","0.000.00 452.00",,,,,,,, +"",,,,,,,,,0.00,452.00, +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.32,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.32 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,596.00,596.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,596.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +CEMENT MASONRY/PLASTERING,Journey,124.50,108.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,124.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.50,108.50,0.00,16.00,0.00,0.00,0.00,0.00,0.00,124.50 +IRONWORKER/WELDER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,219.00,160.00,9.00,50.00,0.00,0.00,0.00,0.00,0.00,219.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,219.00,160.00,9.00,50.00,0.00,0.00,0.00,0.00,0.00,219.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PUMP OPERATOR (CONCRETE),Journey,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",574.00,"483.00 9.0082.000.000.000.00","0.000.00 574.00",,,,,,,, +"",,,,,,,,,,0.00,574.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,574.00,483.00,9.00,82.00,0.00,0.00,0.00,0.00,0.00,574.00 +Morse-Collins Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,"1,088.00","1,088.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,088.00" +Apprentice,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00,24.00, +A/J Ratio,0.06,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,149.00","1,149.00",0.00,0.00,0.00,0.00,0.00,0.00,37.00,"1,112.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,088.00","1,088.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,088.00" +"",Apprentice,61.00,61.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00,24.00 +"",A/J Ratio,0.06,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,149.00","1,149.00",0.00,0.00,0.00,0.00,0.00,0.00,37.00,"1,112.00" +Patrick J. Kennedy & Sons,,,,,,,,,,, +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,128.00,96.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,96.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +PIPEFITTER & STEAMFITTER,Journey,852.00,756.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,852.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,852.00,756.00,0.00,96.00,0.00,0.00,0.00,0.00,0.00,852.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",900.00,"804.00 0.0096.000.000.000.00","0.000.00 900.00",,,,,,,, +"",,,,,,,,,0.00,900.00, +Apprentice,128.00,96.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +A/J Ratio,0.14,0.12,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,028.00",900.00,32.00,96.00,0.00,0.00,0.00,0.00,0.00,"1,028.00", +Pro Cut Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER: MULTI-TRADE TENDER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +LABORER,Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +Apprentice,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,4.00, +A/J Ratio,0.79,0.79,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,80.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",172.00,"172.00 0.000.000.000.000.00","0.000.00 172.00",,,,,,,, +"",,,,,,,,,0.00,172.00, +Apprentice,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,4.00, +A/J Ratio,0.35,0.35,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.02, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,232.00,232.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00,176.00, +"Safway Services LLC, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +MECHANICS MAINTENANCE,Journey,353.50,353.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,353.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,353.50,353.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,353.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",353.50,"353.50 0.000.000.000.000.00","0.000.00 353.50",,,,,,,, +"",,,,,,,,,,0.00,353.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,353.50,353.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,353.50 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,493.00,170.00,16.00,307.00,0.00,0.00,0.00,0.00,0.00,493.00 +"",Apprentice,46.00,32.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",A/J Ratio,0.09,0.19,0.00,0.05,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,539.00,202.00,16.00,321.00,0.00,0.00,0.00,0.00,0.00,539.00 +Total for Contractor,Journey,493.00,170.00,16.00,307.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,493.00 +"",Apprentice,46.00,32.00,0.00,14.00,0.00,0.00,0.00,0.00,0.00,46.00 +"",A/J Ratio,0.09,0.19,0.00,0.05,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,539.00,202.00,16.00,321.00,0.00,0.00,0.00,0.00,0.00,539.00 +"The Trinity Construction Group, LLC",,,,,,,,,,, +LABORER,Journey,40.00,24.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,24.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,40.00,24.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,24.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,40.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,350.00,174.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,350.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,350.00,174.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,350.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",350.00,"174.00 0.00176.000.000.000.00","0.000.00 350.00",,,,,,,, +"",,,,,,,,,0.00,350.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,350.00,174.00,0.00,176.00,0.00,0.00,0.00,0.00,0.00,350.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,"1,140.00","1,054.75",65.00,12.25,0.00,0.00,8.00,0.00,13.75,"1,126.25" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,140.00","1,054.75",65.00,12.25,0.00,0.00,8.00,0.00,13.75,"1,126.25" +Total for Contractor,Journey,"1,140.00","1,054.75",65.00,12.25,0.00,0.00,8.00,0.00,, +"",,,,,,,,13.75,"1,126.25",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,140.00","1,054.75",65.00,12.25,0.00,0.00,8.00,0.00,13.75,"1,126.25", +"Valley Communications Systems, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +TELECOMMUNICATION TECHNICIAN,Journey,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",107.00,"107.00 0.000.000.000.000.00","0.000.00 107.00",,,,,,,, +"",,,,,,,,,,0.00,107.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +ver-tex construction specialties,,,,,,,,,,, +CARPENTER,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +JOURNEYMAN LINEMAN,Journey,64.50,64.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.50,64.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",131.50,"131.50 0.000.000.000.000.00","0.000.00 131.50",,,,,,,, +"",,,,,,,,,0.00,131.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,131.50,131.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,131.50, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,"1,932.50","1,741.00",0.00,191.50,0.00,0.00,0.00,0.00,0.00,"1,932.50" +"",Apprentice,725.75,405.75,0.00,320.00,0.00,0.00,0.00,0.00,40.00,685.75 +"",A/J Ratio,0.38,0.23,0.00,1.67,0.00,0.00,0.00,0.00,0.00,0.35 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,658.25","2,146.75",0.00,511.50,0.00,0.00,0.00,0.00,40.00,"2,618.25" +TELECOMMUNICATION TECHNICIAN,Journey,934.75,760.50,0.00,31.25,143.00,0.00,0.00,0.00,0.00,934.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,934.75,760.50,0.00,31.25,143.00,0.00,0.00,0.00,0.00,934.75 +Total for Contractor,Journey,"2,867.25","2,501.50",0.00,222.75,143.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,"2,867.25", +"",Apprentice,725.75,405.75,0.00,320.00,0.00,0.00,0.00,0.00,40.00,685.75 +"",A/J Ratio,0.25,0.16,0.00,1.44,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,593.00","2,907.25",0.00,542.75,143.00,0.00,0.00,0.00,40.00,"3,553.00" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,199.00,175.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,199.00 +"",Apprentice,168.00,168.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,168.00 +"",A/J Ratio,0.84,0.96,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,367.00,343.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,367.00 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +MARBLE & TILE FINISHERS,Journey,798.00,638.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,798.00 +Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,0.01,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,806.00,646.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,806.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,"1,214.00",340.00,0.00,874.00,0.00,0.00,0.00,0.00,0.00,"1,214.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,214.00",340.00,0.00,874.00,0.00,0.00,0.00,0.00,0.00,"1,214.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","2,235.00","1,177.00 0.001,058.000.000.000.00","0.000.00 2,235.00",,,,,,,, +"",,,,,,,,,0.00,"2,235.00", +"",Apprentice,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",A/J Ratio,0.08,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,411.00","1,353.00",0.00,"1,058.00",0.00,0.00,0.00,0.00,0.00,"2,411.00" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00 +Total for Contractor,Journey,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,288.00,, +Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00, +A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00, +Total Journey Hours,"25,546.25","20,408.25",275.00,"4,322.00",515.00,0.00,26.00,0.00,792.75,"24,753.50", +Total Apprentice Hours,"2,837.75","2,125.75",104.00,608.00,0.00,0.00,0.00,0.00,582.00,"2,255.75", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"28,384.00","22,534.00",379.00,"4,930.00",515.00,0.00,26.00,0.00,"1,374.75","27,009.25", +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,43.00,27.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,27.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,43.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",43.00,"27.00 0.0016.000.000.000.00","0.000.00 43.00",,,,,,,, +"",,,,,,,,,,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,27.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,43.00 +Contracting Specialists,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER: MASON TENDER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",151.00,"151.00 0.000.000.000.000.00","0.000.00 151.00",,,,,,,, +"",,,,,,,,,,0.00,151.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,151.00,151.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,151.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +LABORER,Journey,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,55.00,55.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",141.00,"141.00 0.000.000.000.000.00","0.000.00 141.00",,,,,,,, +"",,,,,,,,,0.00,141.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.00, +Crocker Architectural Sheet Metal,,,,,,,,,,, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ROOFER,Journey,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,130.50,130.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,130.50 +SHEETMETAL WORKER,Journey,212.50,212.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,212.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,212.50,212.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,212.50 +Total for Contractor,Journey,343.00,343.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,343.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,343.00,343.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,343.00 +"JRJ Corporation Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +CEMENT MASONRY/PLASTERING,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +LABORER: CEMENT FINISHER TENDER,Journey,128.00,0.00,0.00,128.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,0.00,0.00,128.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: MULTI-TRADE TENDER,Journey,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",506.00,"378.00 0.00128.000.000.000.00","0.000.00 506.00",,,,,,,, +"",,,,,,,,,0.00,506.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,506.00,378.00,0.00,128.00,0.00,0.00,0.00,0.00,0.00,506.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,244.00,244.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,244.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,244.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,244.00 +IRONWORKER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +IRONWORKER/WELDER,Journey,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,32.00 +LABORER,Journey,72.00,0.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,72.00,0.00,0.00,72.00,0.00,0.00,0.00,0.00,0.00,72.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +PUMP OPERATOR (CONCRETE),Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",355.50,"275.50 0.0080.000.000.000.00","0.000.00 355.50",,,,,,,, +"",,,,,,,,,,0.00,355.50 +"",Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.05 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,371.50,275.50,16.00,80.00,0.00,0.00,0.00,0.00,0.00,371.50 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,475.00,331.00,0.00,0.00,0.00,0.00,144.00,0.00,0.00,475.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,475.00,331.00,0.00,0.00,0.00,0.00,144.00,0.00,0.00,475.00 +LABORER,Journey,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",627.00,"331.00 0.00152.000.000.00144.00","0.000.00 627.00",,,,,,,, +"",,,,,,,,,0.00,627.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,627.00,331.00,0.00,152.00,0.00,0.00,144.00,0.00,0.00,627.00, +Yard Works Inc.,,,,,,,,,,, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,5.75,0.00,0.00,5.75,0.00,0.00,0.00,0.00,0.00,5.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.75,0.00,0.00,5.75,0.00,0.00,0.00,0.00,0.00,5.75 +LABORER,Journey,126.50,12.00,0.00,114.50,0.00,0.00,0.00,0.00,0.00,126.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,126.50,12.00,0.00,114.50,0.00,0.00,0.00,0.00,0.00,126.50 +Total for Contractor,Journey,132.25,12.00,0.00,120.25,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,132.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,132.25,12.00,0.00,120.25,0.00,0.00,0.00,0.00,0.00,132.25, +Total Journey Hours,"2,298.75","1,658.50",0.00,496.25,0.00,0.00,144.00,0.00,0.00,"2,298.75", +Total Apprentice Hours,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,314.75","1,658.50",16.00,496.25,0.00,0.00,144.00,0.00,0.00,"2,314.75", +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.50,4.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.50 +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,156.00,156.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,156.00 +Apprentice,156.00,44.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,156.00, +A/J Ratio,1.00,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,312.00,200.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,312.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",156.00,"156.00 0.000.000.000.000.00","0.000.00 156.00",,,,,,,, +"",,,,,,,,,0.00,156.00, +Apprentice,156.00,44.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,156.00, +A/J Ratio,1.00,0.28,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,312.00,200.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,312.00, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +Total for Contractor,Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,51.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.50,41.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.50 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,479.00,479.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,479.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,479.00,479.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,479.00 +EQUIPMENT OPERATOR (Class A CDL),Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",492.00,"492.00 0.000.000.000.000.00","0.000.00 492.00",,,,,,,, +"",,,,,,,,,0.00,492.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,492.00,492.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,492.00, +KMD Mechanical,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +PLUMBERS & GASFITTERS,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +Total for Contractor,Journey,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,124.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,24.00,0.00,0.00,16.00,0.00,0.00,8.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,0.00,0.00,16.00,0.00,0.00,8.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"0.00 0.0016.000.000.008.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,0.00,0.00,16.00,0.00,0.00,8.00,0.00,0.00,24.00, +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,94.00,0.00,12.00,0.00,0.00,0.00,82.00,0.00,0.00,94.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,0.00,12.00,0.00,0.00,0.00,82.00,0.00,0.00,94.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",94.00,"0.00 12.000.000.000.0082.00","0.000.00 94.00",,,,,,,, +"",,,,,,,,,,0.00,94.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,94.00,0.00,12.00,0.00,0.00,0.00,82.00,0.00,0.00,94.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,"1,054.25",188.25,0.00,866.00,0.00,0.00,0.00,0.00,0.00,"1,054.25" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,054.25",188.25,0.00,866.00,0.00,0.00,0.00,0.00,0.00,"1,054.25" +Total for Contractor,Journey,"1,054.25",188.25,0.00,866.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,054.25" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,054.25",188.25,0.00,866.00,0.00,0.00,0.00,0.00,0.00,"1,054.25" +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,122.00,90.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,122.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,122.00,90.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,122.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,122.00,90.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,122.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,122.00,90.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,122.00, +Total Journey Hours,"2,206.25","1,190.25",12.00,914.00,0.00,0.00,90.00,0.00,0.00,"2,206.25", +Total Apprentice Hours,156.00,44.00,0.00,112.00,0.00,0.00,0.00,0.00,0.00,156.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,362.25","1,234.25",12.00,"1,026.00",0.00,0.00,90.00,0.00,0.00,"2,362.25", +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,416.00,416.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,416.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,416.00,416.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,416.00 +ELEVATOR CONSTRUCTOR HELPER,Journey,480.00,480.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,480.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,480.00,480.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,480.00 +Total for Contractor,Journey,896.00,896.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,896.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,896.00,896.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,896.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,291.00,251.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,291.00,251.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",291.00,"251.00 40.000.000.000.000.00","0.000.00 291.00",,,,,,,, +"",,,,,,,,,0.00,291.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,291.00,251.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,291.00, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PIPEFITTER & STEAMFITTER,Journey,183.00,183.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,183.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,183.00,183.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,183.00 +Total for Contractor,Journey,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,194.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,64.00,12.00,0.00,52.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,12.00,0.00,52.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,64.00,12.00,0.00,52.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,12.00,0.00,52.00,0.00,0.00,0.00,0.00,0.00,64.00 +"Spindle City Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",36.00,"36.00 0.000.000.000.000.00","0.000.00 36.00",,,,,,,, +"",,,,,,,,,,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00 +"Trane US, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,4.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,485.00","1,393.00",40.00,52.00,0.00,0.00,0.00,0.00,0.00,"1,485.00" +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,485.00","1,393.00",40.00,52.00,0.00,0.00,0.00,0.00,0.00,"1,485.00" +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Louis C. Allegrone, Inc.",,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,497.00,314.00,0.00,183.00,0.00,0.00,0.00,0.00,0.00,497.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,497.00,314.00,0.00,183.00,0.00,0.00,0.00,0.00,0.00,497.00, +LABORER: MASON TENDER,Journey,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,181.00,181.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,181.00, +Total for Contractor,Journey,678.00,495.00,0.00,183.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,678.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,678.00,495.00,0.00,183.00,0.00,0.00,0.00,0.00,0.00,678.00, +"Rockwell Roofing, Inc.",,,,,,,,,,,, +SHEETMETAL WORKER,Journey,38.75,38.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,38.75,38.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.75,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.75,"38.75 0.000.000.000.000.00","0.000.00 38.75",,,,,,,,, +"",,,,,,,,,0.00,38.75,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,38.75,38.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.75,, +"0.000.00 38.75", +0.00,38.75 +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,716.75,533.75,0.00,183.00,0.00,0.00,0.00,0.00,0.00,716.75 +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,716.75,533.75,0.00,183.00,0.00,0.00,0.00,0.00,0.00,716.75 +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.50,"8.50 0.000.000.000.000.00","0.000.00 8.50",,,,,,,, +"",,,,,,,,,,0.00,8.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.50,8.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.50 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,402.50,402.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,402.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,402.50,402.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,402.50 +LABORER,Journey,918.00,723.00,0.00,195.00,0.00,0.00,0.00,0.00,184.00,734.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,918.00,723.00,0.00,195.00,0.00,0.00,0.00,0.00,184.00,734.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,320.50","1,125.50 0.00195.000.000.000.00","0.00184.00 1,136.50",,,,,,,, +"",,,,,,,,,184.00,"1,136.50", +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,320.50","1,125.50",0.00,195.00,0.00,0.00,0.00,0.00,184.00,"1,136.50", +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,329.00","1,134.00",0.00,195.00,0.00,0.00,0.00,0.00,184.00,"1,145.00" +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,329.00","1,134.00",0.00,195.00,0.00,0.00,0.00,0.00,184.00,"1,145.00" diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportOct2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportOct2019.csv new file mode 100644 index 00000000..b93c5c41 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportOct2019.csv @@ -0,0 +1,3397 @@ +"Project Name: AEP1801E UT1 C Utility Vendor Contract- DCR- Statewide Project Code: AEP1801E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Jacqueline Electric and Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00 +Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.00,"5.00 0.000.000.000.000.00","0.000.00 5.00",,,,,,,, +"",,,,,,,,0.00,5.00,, +Apprentice,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +Total Journey Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total Apprentice Hours,5.00,5.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,441.50,417.00,0.00,0.00,0.00,0.00,24.50,0.00,144.00,297.50 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,441.50,417.00,0.00,0.00,0.00,0.00,24.50,0.00,144.00,297.50 +PIPEFITTER & STEAMFITTER,Journey,546.00,522.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,522.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,546.00,522.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00,522.00 +Total for Contractor,Journey,546.00,522.00,24.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,24.00,522.00 +"",Apprentice,441.50,417.00,0.00,0.00,0.00,0.00,24.50,0.00,144.00,297.50 +"",A/J Ratio,0.81,0.80,0.00,0.00,0.00,0.00,0.00,0.00,6.00,0.57 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,987.50,939.00,24.00,0.00,0.00,0.00,24.50,0.00,168.00,819.50 +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,"1,296.00",950.00,48.00,146.00,0.00,0.00,152.00,0.00,0.00,"1,296.00" +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00 +"",A/J Ratio,0.01,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,312.00",966.00,48.00,146.00,0.00,0.00,152.00,0.00,16.00,"1,296.00" +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,472.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,472.00,472.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,472.00, +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,768.00","1,422.00",48.00,146.00,0.00,0.00,152.00,0.00,0.00,"1,768.00" +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,0.00 +"",A/J Ratio,0.01,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,784.00","1,438.00",48.00,146.00,0.00,0.00,152.00,0.00,16.00,"1,768.00" +Fall River Electrical Assoc.,,,,,,,,,,, +ELECTRICIAN,Journey,173.00,173.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,173.00 +Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,118.00, +A/J Ratio,0.74,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.68, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,301.00,301.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,291.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",173.00,"173.00 0.000.000.000.000.00","0.000.00 173.00",,,,,,,, +"",,,,,,,,0.00,173.00,, +Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,118.00, +A/J Ratio,0.74,0.74,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.68, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,301.00,301.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00,291.00, +Total Journey Hours,"2,487.00","2,117.00",72.00,146.00,0.00,0.00,152.00,0.00,24.00,"2,463.00", +Total Apprentice Hours,585.50,561.00,0.00,0.00,0.00,0.00,24.50,0.00,170.00,415.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,072.50","2,678.00",72.00,146.00,0.00,0.00,176.50,0.00,194.00,"2,878.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSB1403 HC1 C State House Data Center Relocation Project Code: BSB1403 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LeVangie Electric Co. Inc.,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +A/J Ratio,0.98,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.98, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,79.00,39.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"0.00 40.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,0.00,40.00,, +Apprentice,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +A/J Ratio,0.98,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.98, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,79.00,39.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00, +Total Journey Hours,40.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Apprentice Hours,39.00,39.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,39.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,79.00,39.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,79.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Lawrence Lynch Corp,,,,,,,,,,, +DRIVER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +EQUIPMENT OPERATOR (Class B CDL),Journey,285.00,276.50,0.00,0.00,0.00,8.50,0.00,0.00,115.00,170.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,285.00,276.50,0.00,0.00,0.00,8.50,0.00,0.00,115.00,170.00 +LABORER,Journey,556.00,552.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,556.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,556.00,552.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,556.00 +Total for Contractor,Journey,842.50,830.00,4.00,0.00,0.00,8.50,0.00,0.00,, +"",,,,,,,,,,115.00,727.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,842.50,830.00,4.00,0.00,0.00,8.50,0.00,0.00,115.00,727.50 +"Sullivan & McLaughlin Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,241.00,241.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.00, +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +A/J Ratio,0.20,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,241.00,241.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.00, +Total Journey Hours,"1,043.50","1,031.00",4.00,0.00,0.00,8.50,0.00,0.00,115.00,928.50, +Total Apprentice Hours,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,083.50","1,071.00",4.00,0.00,0.00,8.50,0.00,0.00,115.00,968.50, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",66.00,"66.00 0.000.000.000.000.00","0.000.00 66.00",,,,,,,, +"",,,,,,,,,,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,66.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,66.00 +"Capeway Roofing Systems, Inc.",,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +ROOFER,Journey,73.50,28.50,16.50,28.50,0.00,0.00,0.00,0.00,0.00,73.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,73.50,28.50,16.50,28.50,0.00,0.00,0.00,0.00,0.00,73.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",92.50,"47.50 16.5028.500.000.000.00","0.000.00 92.50",,,,,,,, +"",,,,,,,,,0.00,92.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,92.50,47.50,16.50,28.50,0.00,0.00,0.00,0.00,0.00,92.50, +"Colantonio, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,141.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.00 +"E. Amanti & Sons, Inc",,,,,,,,,,, +LABORER,Journey,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +PIPEFITTER & STEAMFITTER,Journey,112.00,8.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,8.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,112.00 +SHEETMETAL WORKER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,246.00,142.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,246.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,246.00,142.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,246.00 +"Marmelo Brothers Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,351.00,351.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,351.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,351.00,351.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,351.00 +LABORER: MASON TENDER,Journey,226.00,0.00,117.00,109.00,0.00,0.00,0.00,0.00,0.00,226.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,226.00,0.00,117.00,109.00,0.00,0.00,0.00,0.00,0.00,226.00 +Total for Contractor,Journey,577.00,351.00,117.00,109.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,577.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,577.00,351.00,117.00,109.00,0.00,0.00,0.00,0.00,0.00,577.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00, +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,19.00,19.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,19.00, +Total Journey Hours,"1,141.50",766.50,133.50,241.50,0.00,0.00,0.00,0.00,0.00,"1,141.50", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,141.50",766.50,133.50,241.50,0.00,0.00,0.00,0.00,0.00,"1,141.50", +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Bowline Construction,,,,,,,,,,,, +CARPENTER,Journey,72.00,56.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00, +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"",A/J Ratio,0.33,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,96.00,80.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +LABORER,Journey,48.00,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,48.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,48.00,24.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,48.00, +Total for Contractor,Journey,120.00,80.00,16.00,24.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,120.00, +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"",A/J Ratio,0.20,0.30,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.20, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,144.00,104.00,16.00,24.00,0.00,0.00,0.00,0.00,0.00,144.00, +Grasseschi Plumbing,,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,36.00,36.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.00, +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00,, +A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",36.00,"36.00 0.000.000.000.000.00","0.000.00 36.00",,,,,,,,, +"",,,,,,,,,0.00,36.00,, +Apprentice,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00,, +A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00,, +JCI Fire Protection,,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"0.000.00 36.00", +0.00,36.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +SPRINKLER FITTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"6.00 0.000.000.000.000.00","0.000.00 6.00",,,,,,,,, +"",,,,,,,,,,0.00,6.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,137.50,137.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,137.50,137.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.50, +LABORER,Journey,330.00,330.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,330.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,330.00,330.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,330.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",467.50,"467.50 0.000.000.000.000.00","0.000.00 467.50",,,,,,,,, +"",,,,,,,,,0.00,467.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,467.50,467.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,467.50,, +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +"0.000.00 6.00", +0.00,6.00 +"0.000.00 467.50", +0.00,467.50 +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +ELECTRICIAN,Journey,39.00,21.00,7.00,11.00,0.00,0.00,0.00,0.00,0.00,39.00, +"",Apprentice,16.00,7.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"",A/J Ratio,0.41,0.33,1.29,0.00,0.00,0.00,0.00,0.00,0.00,0.41, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,55.00,28.00,16.00,11.00,0.00,0.00,0.00,0.00,0.00,55.00, +TELECOMMUNICATION TECHNICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +Total for Contractor,Journey,43.00,25.00,7.00,11.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,0.00,43.00,, +Apprentice,16.00,7.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00,, +A/J Ratio,0.37,0.28,1.29,0.00,0.00,0.00,0.00,0.00,0.00,0.37,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,59.00,32.00,16.00,11.00,0.00,0.00,0.00,0.00,0.00,59.00,, +Total Journey Hours,672.50,614.50,23.00,35.00,0.00,0.00,0.00,0.00,0.00,672.50,, +Total Apprentice Hours,72.00,63.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,744.50,677.50,32.00,35.00,0.00,0.00,0.00,0.00,0.00,744.50,, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Harris Environmental Systems,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.00,"12.00 0.000.000.000.000.00","0.000.00 12.00",,,,,,,, +"",,,,,,,,,,0.00,12.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,12.00,12.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.00 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +LABORER,Journey,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50 +Total for Contractor,Journey,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,18.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.50,18.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.50, +Total Journey Hours,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,30.50,30.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,8.00 +Total for Contractor,Journey,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,8.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,16.00, +Total Journey Hours,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,16.00, +"Project Name: DCP1907 OM2 C Job Order Contract For General Contractor Services Project Code: DCP1907 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ONE SOURCE CONSTRUCTION, LLC",,,,,,,,,,, +ELECTRICIAN,Journey,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.00,"1.00 0.000.000.000.000.00","0.000.00 1.00",,,,,,,, +"",,,,,,,,0.00,1.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +Total Journey Hours,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM3 C Metro Region Boston Job Order Contracting General Contractor Services Project Code: DCP1907 OM3 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Cintas Fire Protection,,,,,,,,,,, +SPRINKLER FITTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Total for Contractor,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,34.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Journey Hours,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,58.00,0.00,0.00,32.00,26.00,0.00,0.00,0.00,0.00,58.00 +"",Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",A/J Ratio,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,14.00,0.00,32.00,26.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",58.00,"0.00 0.0032.0026.000.000.00","0.000.00 58.00",,,,,,,, +"",,,,,,,,,,0.00,58.00 +"",Apprentice,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00 +"",A/J Ratio,0.24,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.24 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,14.00,0.00,32.00,26.00,0.00,0.00,0.00,0.00,72.00 +JC Flooring Company,,,,,,,,,,, +FLOORCOVERER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Total for Contractor,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Tremont HVAC LLC,,,,,,,,,,, +SHEETMETAL WORKER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00, +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Watermark Environmental, Incorporated",,,,,,,,,,, +LABORER,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",13.00,"13.00 0.000.000.000.000.00","0.000.00 13.00",,,,,,,, +"",,,,,,,,0.00,13.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +Total Journey Hours,91.00,33.00,0.00,32.00,26.00,0.00,0.00,0.00,0.00,91.00, +Total Apprentice Hours,14.00,14.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,105.00,47.00,0.00,32.00,26.00,0.00,0.00,0.00,0.00,105.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Ambient Temperature Corp.,,,,,,,,,,, +HVAC MECHANIC,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/PLASTER/CEMENT MASON,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +BRICK/STONE/ARTIFICIAL MASONRY,Journey,33.50,33.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,25.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.50,33.50,0.00,0.00,0.00,0.00,0.00,0.00,8.00,25.50 +LABORER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,27.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",A/J Ratio,0.23,0.23,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,35.00 +Charles Services & Equipment,,,,,,,,,,, +CARPENTER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +LABORER,Journey,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00 +Total for Contractor,Journey,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,317.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,80.25,80.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.25 +"",Apprentice,27.50,27.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.50 +"",A/J Ratio,0.34,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.75,107.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.25,"80.25 0.000.000.000.000.00","0.000.00 80.25",,,,,,,, +"",,,,,,,,,0.00,80.25, +"",Apprentice,27.50,27.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,27.50 +"",A/J Ratio,0.34,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.75,107.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.75 +"J.C. Cannistraro, LLC",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,301.00,180.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,301.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,301.00,180.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,301.00 +Total for Contractor,Journey,301.00,180.00,121.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,301.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,301.00,180.00,121.00,0.00,0.00,0.00,0.00,0.00,0.00,301.00, +"Jupiter Electric, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,298.00,298.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,298.00 +"",Apprentice,149.00,0.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,149.00 +"",A/J Ratio,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,447.00,298.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,447.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",298.00,"298.00 0.000.000.000.000.00","0.000.00 298.00",,,,,,,, +"",,,,,,,,,0.00,298.00, +"",Apprentice,149.00,0.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,149.00 +"",A/J Ratio,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,447.00,298.00,0.00,0.00,149.00,0.00,0.00,0.00,0.00,447.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,189.00,189.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,189.00 +CEMENT MASONRY/PLASTERING,Journey,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,60.00,60.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,60.00 +IRONWORKER/WELDER,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +LABORER,Journey,254.50,230.00,24.50,0.00,0.00,0.00,0.00,0.00,0.00,254.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,254.50,230.00,24.50,0.00,0.00,0.00,0.00,0.00,0.00,254.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,641.50,617.00,24.50,0.00,0.00,0.00,0.00,0.00,0.00,641.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,641.50,617.00,24.50,0.00,0.00,0.00,0.00,0.00,0.00,641.50 +"Manganaro Northeast, LLC",,,,,,,,,,, +CARPENTER,Journey,507.00,451.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,507.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,507.00,451.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,507.00 +LABORER,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Total for Contractor,Journey,541.00,485.00,56.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,541.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,541.00,485.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,541.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,268.00,268.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,268.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +DRIVER,Journey,55.00,51.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00,51.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,55.00,51.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00,51.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",323.00,"319.00 0.004.000.000.000.00","0.004.00 319.00",,,,,,,, +"",,,,,,,,,,4.00,319.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,323.00,319.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00,319.00 +Tri State Building LLC,,,,,,,,,,, +IRONWORKER/WELDER,Journey,827.00,675.00,0.00,0.00,0.00,0.00,152.00,0.00,132.00,695.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,827.00,675.00,0.00,0.00,0.00,0.00,152.00,0.00,132.00,695.00 +Total for Contractor,Journey,827.00,675.00,0.00,0.00,0.00,0.00,152.00,0.00,, +"",,,,,,,,,,132.00,695.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,827.00,675.00,0.00,0.00,0.00,0.00,152.00,0.00,132.00,695.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,253.50,253.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,253.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,253.50,253.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,253.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,892.00,892.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,892.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,892.00,892.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,892.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,145.50","1,145.50 0.000.000.000.000.00","0.000.00 1,145.50",,,,,,,, +"",,,,,,,,,0.00,"1,145.50", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,145.50","1,145.50",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,145.50" +William M. Collins company Inc.,,,,,,,,,,, +SPRINKLER FITTER,Journey,52.00,28.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,52.00 +"",Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.08,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Total for Contractor,Journey,52.00,28.00,24.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,52.00,, +Apprentice,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +A/J Ratio,0.08,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.08, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,32.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +Total Journey Hours,"4,573.25","4,191.75",225.50,4.00,0.00,0.00,152.00,0.00,144.00,"4,429.25", +Total Apprentice Hours,188.50,39.50,0.00,0.00,149.00,0.00,0.00,0.00,0.00,188.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"4,761.75","4,231.25",225.50,4.00,149.00,0.00,152.00,0.00,144.00,"4,617.75", +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,931.50,796.50,135.00,0.00,0.00,0.00,0.00,0.00,0.00,931.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,931.50,796.50,135.00,0.00,0.00,0.00,0.00,0.00,0.00,931.50 +Total for Contractor,Journey,931.50,796.50,135.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,931.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,931.50,796.50,135.00,0.00,0.00,0.00,0.00,0.00,0.00,931.50, +Total Journey Hours,942.50,807.50,135.00,0.00,0.00,0.00,0.00,0.00,0.00,942.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,942.50,807.50,135.00,0.00,0.00,0.00,0.00,0.00,0.00,942.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Commercial Air Control, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Contractors Network, Inc.",,,,,,,,,,, +CARPENTER,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00, +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"Systems Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",28.00,"28.00 0.000.000.000.000.00","0.000.00 28.00",,,,,,,, +"",,,,,,,,0.00,28.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total Journey Hours,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,68.00,68.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,68.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ACV Concrete LLC,,,,,,,,,,, +CARPENTER,Journey,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +IRONWORKER/WELDER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,0.00,0.00,54.00,0.00,0.00,0.00,0.00,0.00,54.00 +LABORER: CARPENTER TENDER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER: MASON TENDER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,134.00,0.00,0.00,134.00,0.00,0.00,0.00,0.00,0.00,134.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,134.00,0.00,0.00,134.00,0.00,0.00,0.00,0.00,0.00,134.00 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,292.00,292.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,292.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.52,0.52,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.52 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,444.00,444.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,444.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",292.00,"292.00 0.000.000.000.000.00","0.000.00 292.00",,,,,,,, +"",,,,,,,,,,0.00,292.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.52,0.52,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.52 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,444.00,444.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,444.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +PLUMBERS & GASFITTERS,Journey,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +Apprentice,216.00,160.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,216.00, +A/J Ratio,0.87,0.65,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.87, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,464.00,408.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,464.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,312.00,312.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,312.00 +"",Apprentice,216.00,160.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,216.00 +"",A/J Ratio,0.69,0.51,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,528.00,472.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,528.00 +Atlantic Contracting & Specialties,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",76.00,"76.00 0.000.000.000.000.00","0.000.00 76.00",,,,,,,, +"",,,,,,,,,0.00,76.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,76.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Chasco, Inc.",,,,,,,,,,, +FENCE & GUARD RAIL ERECTOR,Journey,41.00,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.00,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +Total for Contractor,Journey,41.00,20.50,20.50,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,41.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,41.00,20.50,20.50,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Greenfield Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,23.50,23.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,23.50 +Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.50,44.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",23.50,"23.50 0.000.000.000.000.00","0.000.00 23.50",,,,,,,, +"",,,,,,,,,0.00,23.50, +Apprentice,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +A/J Ratio,0.89,0.89,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.89, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.50,44.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.50, +John W. Egan Company Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",296.00,"296.00 0.000.000.000.000.00","0.000.00 296.00",,,,,,,, +"",,,,,,,,,,0.00,296.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +"K & K Acoustical Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Total for Contractor,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Kittredge Equipment Company,,,,,,,,,,, +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,113.25,113.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,113.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,113.25,113.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,113.25 +DRIVER,Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +LABORER,Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",234.75,"234.75 0.000.000.000.000.00","0.000.00 234.75",,,,,,,, +"",,,,,,,,,0.00,234.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,234.75,234.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.75, +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,176.98,176.98,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.98 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.98,176.98,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.98 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.98,"176.98 0.000.000.000.000.00","0.000.00 176.98",,,,,,,, +"",,,,,,,,,,0.00,176.98 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.98,176.98,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.98 +"TC Controls & Services, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"William F. Lynch Co., Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,86.00,0.00,0.00,0.00,0.00,0.00,86.00,0.00,0.00,86.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,86.00,0.00,0.00,0.00,0.00,0.00,86.00,0.00,0.00,86.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",106.00,"20.00 0.000.000.000.0086.00","0.000.00 106.00",,,,,,,, +"",,,,,,,,,0.00,106.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,106.00,20.00,0.00,0.00,0.00,0.00,86.00,0.00,0.00,106.00, +Total Journey Hours,"1,832.23","1,591.73",20.50,134.00,0.00,0.00,86.00,0.00,0.00,"1,832.23", +Total Apprentice Hours,389.00,333.00,0.00,56.00,0.00,0.00,0.00,0.00,0.00,389.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,221.23","1,924.73",20.50,190.00,0.00,0.00,86.00,0.00,0.00,"2,221.23", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Commercial Air Control, Inc.",,,,,,,,,,, +HVAC MECHANIC,Journey,132.00,76.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,132.00,76.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",132.00,"76.00 56.000.000.000.000.00","0.000.00 132.00",,,,,,,, +"",,,,,,,,,,0.00,132.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,132.00,76.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +Total for Contractor,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,67.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +Renewable Energy Systems - RES,,,,,,,,,,, +LABORER,Journey,78.75,78.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,78.75,78.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.75, +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,78.75,78.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,78.75,78.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,78.75 +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,116.00,116.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,116.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,132.00,132.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,132.00 +PIPEFITTER & STEAMFITTER,Journey,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,6.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,6.00 +Total for Contractor,Journey,122.00,122.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,122.00,, +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.13,0.13,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.13, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00, +Total Journey Hours,399.75,343.75,56.00,0.00,0.00,0.00,0.00,0.00,0.00,399.75, +Total Apprentice Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,415.75,359.75,56.00,0.00,0.00,0.00,0.00,0.00,0.00,415.75, +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Professional Fire Systems, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",34.00,"34.00 0.000.000.000.000.00","0.000.00 34.00",,,,,,,, +"",,,,,,,,0.00,34.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Journey Hours,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Archer Corp,,,,,,,,,,, +CARPENTER,Journey,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",304.00,"304.00 0.000.000.000.000.00","0.000.00 304.00",,,,,,,, +"",,,,,,,,,,0.00,304.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,6.00,4.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",A/J Ratio,0.33,0.00,0.00,1.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",6.00,"4.00 0.002.000.000.000.00","0.000.00 6.00",,,,,,,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",A/J Ratio,0.33,0.00,0.00,1.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,4.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,96.00,88.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",A/J Ratio,0.86,0.79,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.86 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,200.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,208.00 +TELECOMMUNICATION TECHNICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,96.00,88.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,96.00, +A/J Ratio,0.80,0.73,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,216.00,208.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,216.00, +Total Journey Hours,470.00,460.00,8.00,2.00,0.00,0.00,0.00,0.00,0.00,470.00, +Total Apprentice Hours,98.00,88.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,98.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,568.00,548.00,8.00,12.00,0.00,0.00,0.00,0.00,0.00,568.00, +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +BG Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,541.50,541.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,541.50 +"",Apprentice,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"",A/J Ratio,0.30,0.30,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,703.50,703.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,703.50 +Total for Contractor,Journey,541.50,541.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,541.50 +"",Apprentice,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00 +"",A/J Ratio,0.30,0.30,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.30 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,703.50,703.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,703.50 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.50,29.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,29.50, +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,94.00,67.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,94.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,94.00,67.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,94.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",123.50,"96.50 0.0027.000.000.000.00","0.000.00 123.50",,,,,,,, +"",,,,,,,,,0.00,123.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,123.50,96.50,0.00,27.00,0.00,0.00,0.00,0.00,0.00,123.50, +Total Journey Hours,681.00,654.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,681.00, +Total Apprentice Hours,162.00,162.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,162.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,843.00,816.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,843.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"2.00 0.000.002.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,0.00,4.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +Total Journey Hours,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,4.00,2.00,0.00,0.00,2.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,276.00,246.00,0.00,0.00,30.00,0.00,0.00,0.00,0.00,276.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,276.00,246.00,0.00,0.00,30.00,0.00,0.00,0.00,0.00,276.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",276.00,"246.00 0.000.0030.000.000.00","0.000.00 276.00",,,,,,,, +"",,,,,,,,0.00,276.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,276.00,246.00,0.00,0.00,30.00,0.00,0.00,0.00,0.00,276.00, +Total Journey Hours,276.00,246.00,0.00,0.00,30.00,0.00,0.00,0.00,0.00,276.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,276.00,246.00,0.00,0.00,30.00,0.00,0.00,0.00,0.00,276.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,40.00 +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00 +Total for Contractor,Journey,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,40.00,93.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,93.00 +"Glynn Electric, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +Apprentice,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: MMA1901 DB1 C Buzzards Bay-Campus-Wide-Electrical Infrastructure Upgrade-MMA Project Code: MMA1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,141.00,141.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,101.00 +Total Apprentice Hours,8.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,149.00,141.00,0.00,8.00,0.00,0.00,0.00,0.00,40.00,109.00 +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"ENERGY INSULATION CONSERVATION, INC.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Ostrow Electric Company,,,,,,,,,,, +ELECTRICIAN,Journey,29.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,29.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,29.00, +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,29.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,29.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,29.00,0.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,29.00, +Total Journey Hours,53.00,24.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,53.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,53.00,24.00,0.00,29.00,0.00,0.00,0.00,0.00,0.00,53.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +DRIVER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,130.00,106.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,130.00 +"",Apprentice,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",A/J Ratio,0.38,0.46,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.38 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,179.00,155.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,179.00 +Total for Contractor,Journey,219.00,195.00,0.00,24.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,219.00 +"",Apprentice,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",A/J Ratio,0.22,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.22 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,268.00,244.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,268.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +LABORER,Journey,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,43.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,43.00 +Total for Contractor,Journey,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,87.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +McDonald Electric Corporation,,,,,,,,,,, +ELECTRICIAN,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Apprentice,27.00,0.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,27.00, +A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,107.00,80.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,107.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",80.00,"80.00 0.000.000.000.000.00","0.000.00 80.00",,,,,,,, +"",,,,,,,,,0.00,80.00, +Apprentice,27.00,0.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,27.00, +A/J Ratio,0.34,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.34, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,107.00,80.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,107.00, +"NASDI, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,13.00,7.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,7.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,13.00 +OPERATING ENGINEERS,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,15.00,9.00,0.00,6.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,15.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,15.00,9.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,15.00, +Total Journey Hours,401.00,371.00,0.00,30.00,0.00,0.00,0.00,0.00,0.00,401.00, +Total Apprentice Hours,76.00,49.00,0.00,27.00,0.00,0.00,0.00,0.00,0.00,76.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,477.00,420.00,0.00,57.00,0.00,0.00,0.00,0.00,0.00,477.00, +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Bonner Sheet Metal Corp.,,,,,,,,,,, +HVAC (DUCTWORK),Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"32.00 0.000.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +PIPEFITTER & STEAMFITTER,Journey,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,160.00,160.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,160.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",160.00,"160.00 0.000.000.000.000.00","0.000.00 160.00",,,,,,,, +"",,,,,,,,,0.00,160.00, +Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00, +A/J Ratio,0.90,0.90,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.90, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,304.00,304.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,304.00, +Ostrow Electric Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",Apprentice,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,266.00,266.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,266.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",133.00,"133.00 0.000.000.000.000.00","0.000.00 133.00",,,,,,,, +"",,,,,,,,,,0.00,133.00 +"",Apprentice,133.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,133.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,266.00,266.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,266.00 +SMS Services,,,,,,,,,,, +LABORER,Journey,96.75,24.00,19.75,53.00,0.00,0.00,0.00,0.00,0.00,96.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.75,24.00,19.75,53.00,0.00,0.00,0.00,0.00,0.00,96.75 +Total for Contractor,Journey,96.75,24.00,19.75,53.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,96.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.75,24.00,19.75,53.00,0.00,0.00,0.00,0.00,0.00,96.75 +The Cheviot Corporation,,,,,,,,,,, +CARPENTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +Total Journey Hours,421.75,349.00,19.75,53.00,0.00,0.00,0.00,0.00,0.00,421.75, +Total Apprentice Hours,299.00,299.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,299.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,720.75,648.00,19.75,53.00,0.00,0.00,0.00,0.00,0.00,720.75, +"Project Name: SDE1301E EC1 C SDE Essex Sheriffs Dept.Multisite Energy and Water Retrofit Construction Non-CEIP Project Code: SDE1301E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,0.00,8.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Journey Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +SHEETMETAL WORKER,Journey,288.00,0.00,0.00,288.00,0.00,0.00,0.00,0.00,0.00,288.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,288.00,0.00,0.00,288.00,0.00,0.00,0.00,0.00,0.00,288.00 +Total for Contractor,Journey,424.00,136.00,0.00,288.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,424.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,424.00,136.00,0.00,288.00,0.00,0.00,0.00,0.00,0.00,424.00 +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,245.25,245.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,245.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,245.25,245.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,245.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",245.25,"245.25 0.000.000.000.000.00","0.000.00 245.25",,,,,,,, +"",,,,,,,,,0.00,245.25, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,245.25,245.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,245.25, +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +SPRINKLER FITTER,Journey,88.00,48.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,48.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,88.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",88.00,"48.00 0.000.0040.000.000.00","0.000.00 88.00",,,,,,,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,48.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,88.00 +"H Carr & Sons, Inc",,,,,,,,,,, +LABORER,Journey,152.00,144.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,144.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,152.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",216.00,"208.00 0.000.000.000.008.00","0.000.00 216.00",,,,,,,, +"",,,,,,,,,0.00,216.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,216.00,208.00,0.00,0.00,0.00,0.00,8.00,0.00,0.00,216.00, +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.00,81.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,81.00 +ROOFER,Journey,301.00,301.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,301.00 +"",Apprentice,204.50,204.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.50 +"",A/J Ratio,0.68,0.68,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.68 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,505.50,505.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,505.50 +Total for Contractor,Journey,382.00,382.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,382.00 +"",Apprentice,204.50,204.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,204.50 +"",A/J Ratio,0.54,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,586.50,586.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,586.50 +"Lighthouse Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,744.00,744.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,744.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,744.00,744.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,744.00 +LABORER: MASON TENDER,Journey,800.50,327.50,0.00,473.00,0.00,0.00,0.00,0.00,0.00,800.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,800.50,327.50,0.00,473.00,0.00,0.00,0.00,0.00,0.00,800.50, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,544.50","1,071.50",0.00,473.00,0.00,0.00,0.00,0.00,0.00,"1,544.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,544.50","1,071.50",0.00,473.00,0.00,0.00,0.00,0.00,0.00,"1,544.50" +N B Kenney Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.50,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.50 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00 +Total for Contractor,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,296.00 +"",Apprentice,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +"",A/J Ratio,0.49,0.49,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.49 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,67.78,37.78,0.00,0.00,0.00,0.00,0.00,30.00,0.00,67.78 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,67.78,37.78,0.00,0.00,0.00,0.00,0.00,30.00,0.00,67.78, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,67.78,37.78,0.00,0.00,0.00,0.00,0.00,30.00,0.00,67.78 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.78,37.78,0.00,0.00,0.00,0.00,0.00,30.00,0.00,67.78 +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +CARPENTER,Journey,223.00,223.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,223.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,223.00,223.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,223.00 +CEMENT MASONRY/PLASTERING,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER: CARPENTER TENDER,Journey,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,296.00,296.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,296.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",535.00,"535.00 0.000.000.000.000.00","0.000.00 535.00",,,,,,,, +"",,,,,,,,,0.00,535.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,535.00,535.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,535.00, +"SMJ Metal Company, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",38.00,"38.00 0.000.000.000.000.00","0.000.00 38.00",,,,,,,, +"",,,,,,,,,0.00,38.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,38.00,38.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,38.00, +Total Journey Hours,"3,836.53","2,997.53",0.00,761.00,40.00,0.00,8.00,30.00,0.00,"3,836.53", +Total Apprentice Hours,348.50,348.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,348.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"4,185.03","3,346.03",0.00,761.00,40.00,0.00,8.00,30.00,0.00,"4,185.03", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +BG Mechanical,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"Electrical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,28.50,0.00,0.00,28.50,0.00,0.00,0.00,0.00,0.00,28.50 +"",A/J Ratio,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,140.50,112.00,0.00,28.50,0.00,0.00,0.00,0.00,0.00,140.50 +Total for Contractor,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,112.00 +"",Apprentice,28.50,0.00,0.00,28.50,0.00,0.00,0.00,0.00,0.00,28.50 +"",A/J Ratio,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.25 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,140.50,112.00,0.00,28.50,0.00,0.00,0.00,0.00,0.00,140.50 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +CEMENT MASONRY/PLASTERING,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"56.00 8.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,56.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +T & M Equipment Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,236.00,228.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,236.00, +Total Apprentice Hours,28.50,0.00,0.00,28.50,0.00,0.00,0.00,0.00,0.00,28.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,264.50,228.00,8.00,28.50,0.00,0.00,0.00,0.00,0.00,264.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Acme Waterproofing Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Armani Restoration, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Total for Contractor,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,410.00,410.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,410.00 +Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00,0.00, +A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,562.00,562.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00,410.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",474.00,"474.00 0.000.000.000.000.00","0.000.00 474.00",,,,,,,, +"",,,,,,,,,,0.00,474.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00,0.00 +"",A/J Ratio,0.32,0.32,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,626.00,626.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00,474.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,897.00,897.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,897.00 +"",Apprentice,485.00,352.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,485.00 +"",A/J Ratio,0.54,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,382.00","1,249.00",133.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,382.00" +Total for Contractor,Journey,897.00,897.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,897.00 +"",Apprentice,485.00,352.00,133.00,0.00,0.00,0.00,0.00,0.00,0.00,485.00 +"",A/J Ratio,0.54,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.54 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,382.00","1,249.00",133.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,382.00" +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +GLAZIER,Journey,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +IRONWORKER/WELDER,Journey,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",336.00,"304.00 0.0032.000.000.000.00","0.000.00 336.00",,,,,,,, +"",,,,,,,,,0.00,336.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,336.00,304.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,336.00, +Clifford & Galvin Contracting,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,"2,267.50","2,147.50",0.00,120.00,0.00,0.00,0.00,0.00,0.00,"2,267.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,267.50","2,147.50",0.00,120.00,0.00,0.00,0.00,0.00,0.00,"2,267.50" +LABORER,Journey,290.00,290.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,290.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,290.00,290.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,290.00 +Total for Contractor,Journey,"2,557.50","2,437.50",0.00,120.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"2,557.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,557.50","2,437.50",0.00,120.00,0.00,0.00,0.00,0.00,0.00,"2,557.50" +"Convergint Technologies, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Cyber Communications Solutions, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",5.50,"0.00 5.500.000.000.000.00","0.000.00 5.50",,,,,,,, +"",,,,,,,,,,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,108.00,0.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,260.00,178.00,0.00,58.00,24.00,0.00,0.00,0.00,0.00,260.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,260.00,178.00,0.00,58.00,24.00,0.00,0.00,0.00,0.00,260.00 +PAINTER BRUSH NEW,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,368.00,286.00,0.00,58.00,24.00,0.00,0.00,0.00,108.00,260.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.04,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.06 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,384.00,302.00,0.00,58.00,24.00,0.00,0.00,0.00,108.00,276.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,409.25,409.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,409.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,409.25,409.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,409.25 +ELEVATOR CONSTRUCTOR HELPER,Journey,154.50,139.50,15.00,0.00,0.00,0.00,0.00,0.00,0.00,154.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,154.50,139.50,15.00,0.00,0.00,0.00,0.00,0.00,0.00,154.50 +Total for Contractor,Journey,563.75,548.75,15.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,563.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,563.75,548.75,15.00,0.00,0.00,0.00,0.00,0.00,0.00,563.75 +Dimeo Construction Company,,,,,,,,,,, +CARPENTER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,"1,168.00",997.00,0.00,171.00,0.00,0.00,0.00,0.00,0.00,"1,168.00" +"",Apprentice,207.00,0.00,0.00,207.00,0.00,0.00,0.00,0.00,207.00,0.00 +"",A/J Ratio,0.18,0.00,0.00,1.21,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,375.00",997.00,0.00,378.00,0.00,0.00,0.00,0.00,207.00,"1,168.00" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,360.00","1,189.00 0.00171.000.000.000.00","0.000.00 1,360.00",,,,,,,, +"",,,,,,,,,,0.00,"1,360.00" +"",Apprentice,207.00,0.00,0.00,207.00,0.00,0.00,0.00,0.00,207.00,0.00 +"",A/J Ratio,0.15,0.00,0.00,1.21,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,567.00","1,189.00",0.00,378.00,0.00,0.00,0.00,0.00,207.00,"1,360.00" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,449.50,449.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,449.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,449.50,449.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,449.50 +LABORER,Journey,600.00,512.00,0.00,88.00,0.00,0.00,0.00,0.00,32.00,568.00 +"",Apprentice,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00,0.00 +"",A/J Ratio,0.27,0.31,0.00,0.00,0.00,0.00,0.00,0.00,5.03,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,761.00,673.00,0.00,88.00,0.00,0.00,0.00,0.00,193.00,568.00 +PIPELAYER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,113.50","1,025.50",0.00,88.00,0.00,0.00,0.00,0.00,32.00,"1,081.50" +"",Apprentice,161.00,161.00,0.00,0.00,0.00,0.00,0.00,0.00,161.00,0.00 +"",A/J Ratio,0.14,0.16,0.00,0.00,0.00,0.00,0.00,0.00,5.03,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,274.50","1,186.50",0.00,88.00,0.00,0.00,0.00,0.00,193.00,"1,081.50" +"E. Amanti & Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +PLUMBERS & GASFITTERS,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +"",Apprentice,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",A/J Ratio,0.62,0.62,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.62 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,360.00,360.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,360.00 +Total for Contractor,Journey,302.00,302.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,302.00 +"",Apprentice,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00 +"",A/J Ratio,0.46,0.46,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.46 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,112.00,96.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,112.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,96.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,112.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,112.00,96.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,96.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,112.00 +Emanouil Landscaping,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00 +LABORER,Journey,344.00,208.00,0.00,136.00,0.00,0.00,0.00,0.00,56.00,288.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,344.00,208.00,0.00,136.00,0.00,0.00,0.00,0.00,56.00,288.00 +Total for Contractor,Journey,528.00,392.00,0.00,136.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,56.00,472.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,528.00,392.00,0.00,136.00,0.00,0.00,0.00,0.00,56.00,472.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER: MASON TENDER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"176.00 0.000.000.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,,,0.00,176.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Total for Contractor,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,808.00,449.00,112.00,135.00,112.00,0.00,0.00,0.00,0.00,808.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,808.00,449.00,112.00,135.00,112.00,0.00,0.00,0.00,0.00,808.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",808.00,"449.00 112.00135.00112.000.000.00","0.000.00 808.00",,,,,,,, +"",,,,,,,,,0.00,808.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,808.00,449.00,112.00,135.00,112.00,0.00,0.00,0.00,0.00,808.00 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,448.00,266.00,0.00,182.00,0.00,0.00,0.00,0.00,11.00,437.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,448.00,266.00,0.00,182.00,0.00,0.00,0.00,0.00,11.00,437.00 +Total for Contractor,Journey,448.00,266.00,0.00,182.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,11.00,437.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,448.00,266.00,0.00,182.00,0.00,0.00,0.00,0.00,11.00,437.00, +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FIRE ALARM INSTALLER,Journey,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +LABORER,Journey,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.00,37.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.00 +SPRINKLER FITTER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +Total for Contractor,Journey,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,202.00 +"",Apprentice,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",A/J Ratio,0.63,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,330.00,330.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,330.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,"1,062.00",982.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,062.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,062.00",982.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,062.00", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,062.00",982.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,062.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,062.00",982.00,0.00,80.00,0.00,0.00,0.00,0.00,0.00,"1,062.00" +Longden Company,,,,,,,,,,, +CARPENTER,Journey,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.69,0.69,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",104.00,"104.00 0.000.000.000.000.00","0.000.00 104.00",,,,,,,, +"",,,,,,,,,0.00,104.00, +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.69,0.69,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.69 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"Lymo Construction Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00 +Total for Contractor,Journey,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,317.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,317.00,317.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,317.00, +"Marguerite Concrete, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,244.00,244.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,244.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,244.00,244.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,244.00 +CEMENT MASONRY/PLASTERING,Journey,104.50,96.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,104.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.50,96.50,0.00,8.00,0.00,0.00,0.00,0.00,0.00,104.50 +LABORER,Journey,240.00,216.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,240.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,240.00,216.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,240.00 +PUMP OPERATOR (CONCRETE),Journey,28.50,28.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,28.50,28.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",617.00,"585.00 0.0032.000.000.000.00","0.000.00 617.00",,,,,,,, +"",,,,,,,,,0.00,617.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,617.00,585.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,617.00 +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,"1,020.00","1,020.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,020.00" +Apprentice,23.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00,0.00, +A/J Ratio,0.02,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,043.00","1,043.00",0.00,0.00,0.00,0.00,0.00,0.00,23.00,"1,020.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,020.00","1,020.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,020.00" +"",Apprentice,23.00,23.00,0.00,0.00,0.00,0.00,0.00,0.00,23.00,0.00 +"",A/J Ratio,0.02,0.02,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,043.00","1,043.00",0.00,0.00,0.00,0.00,0.00,0.00,23.00,"1,020.00" +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PIPEFITTER & STEAMFITTER,Journey,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,106.00 +Total for Contractor,Journey,106.00,106.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,106.00 +"",Apprentice,16.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.15 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,122.00,106.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,122.00 +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +LABORER,Journey,72.00,8.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.11,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,16.00,0.00,64.00,0.00,0.00,0.00,0.00,8.00,72.00 +Total for Contractor,Journey,152.00,88.00,0.00,64.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,152.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.05,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,160.00,96.00,0.00,64.00,0.00,0.00,0.00,0.00,8.00,152.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +MECHANICS MAINTENANCE,Journey,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,227.00,227.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,227.00 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,428.00,204.00,80.00,144.00,0.00,0.00,0.00,0.00,0.00,428.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,428.00,204.00,80.00,144.00,0.00,0.00,0.00,0.00,0.00,428.00 +LABORER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,444.00,204.00,80.00,160.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,444.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,444.00,204.00,80.00,160.00,0.00,0.00,0.00,0.00,0.00,444.00 +Total Wall Systems Inc.,,,,,,,,,,, +CARPENTER,Journey,170.50,90.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,170.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,170.50,90.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,170.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,170.50,90.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,170.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,170.50,90.50,0.00,80.00,0.00,0.00,0.00,0.00,0.00,170.50 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,789.75,735.75,30.00,8.00,0.00,0.00,16.00,0.00,10.25,779.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,789.75,735.75,30.00,8.00,0.00,0.00,16.00,0.00,10.25,779.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",789.75,"735.75 30.008.000.000.0016.00","0.0010.25 779.50",,,,,,,, +"",,,,,,,,,10.25,779.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,789.75,735.75,30.00,8.00,0.00,0.00,16.00,0.00,10.25,779.50 +"Valley Communications Systems, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,141.25,141.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,141.25,141.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.25 +Total for Contractor,Journey,141.25,141.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,141.25,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,141.25,141.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,141.25, +ver-tex construction specialties,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,37.75,37.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,37.75,37.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,37.75 +JOURNEYMAN LINEMAN,Journey,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,30.00,30.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,30.00 +Total for Contractor,Journey,67.75,67.75,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,67.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,67.75,67.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.75 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"1,884.50","1,720.50",0.00,164.00,0.00,0.00,0.00,0.00,0.00,"1,884.50" +"",Apprentice,940.00,528.00,0.00,412.00,0.00,0.00,0.00,0.00,8.00,932.00 +"",A/J Ratio,0.50,0.31,0.00,2.51,0.00,0.00,0.00,0.00,0.00,0.49 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"2,824.50","2,248.50",0.00,576.00,0.00,0.00,0.00,0.00,8.00,"2,816.50" +TELECOMMUNICATION TECHNICIAN,Journey,659.50,478.00,0.00,69.50,112.00,0.00,0.00,0.00,0.00,659.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,659.50,478.00,0.00,69.50,112.00,0.00,0.00,0.00,0.00,659.50, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"2,544.00","2,198.50",0.00,233.50,112.00,0.00,0.00,0.00,0.00,"2,544.00" +"",Apprentice,940.00,528.00,0.00,412.00,0.00,0.00,0.00,0.00,8.00,932.00 +"",A/J Ratio,0.37,0.24,0.00,1.76,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,484.00","2,726.50",0.00,645.50,112.00,0.00,0.00,0.00,8.00,"3,476.00" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00 +"",Apprentice,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,159.00,159.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,159.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +MARBLE & TILE FINISHERS,Journey,734.00,606.00,0.00,128.00,0.00,0.00,0.00,0.00,0.00,734.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.03,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.03 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,758.00,630.00,0.00,128.00,0.00,0.00,0.00,0.00,0.00,758.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,968.00,409.00,0.00,559.00,0.00,0.00,0.00,0.00,0.00,968.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,968.00,409.00,0.00,559.00,0.00,0.00,0.00,0.00,0.00,968.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,821.00","1,134.00",0.00,687.00,0.00,0.00,0.00,0.00,0.00,"1,821.00" +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.04,0.06,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,893.00","1,206.00",0.00,687.00,0.00,0.00,0.00,0.00,0.00,"1,893.00" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,144.00,144.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,144.00 +Apprentice,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",144.00,"144.00 0.000.000.000.000.00","0.000.00 144.00",,,,,,,, +"",,,,,,,,0.00,144.00,, +Apprentice,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +A/J Ratio,0.39,0.39,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.39, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00, +Total Journey Hours,"20,162.50","17,373.50",242.50,"2,266.50",264.00,0.00,16.00,0.00,217.25,"19,945.25", +Total Apprentice Hours,"2,474.00","1,706.00",149.00,619.00,0.00,0.00,0.00,0.00,559.00,"1,915.00", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"22,636.50","19,079.50",391.50,"2,885.50",264.00,0.00,16.00,0.00,776.25,"21,860.25", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"CDS Contracting Services, LLC.",,,,,,,,,,, +ELECTRICIAN,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",13.00,"13.00 0.000.000.000.000.00","0.000.00 13.00",,,,,,,, +"",,,,,,,,,,0.00,13.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Contracting Specialists,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +Total for Contractor,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,104.00,72.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,104.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,72.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,104.00, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",152.00,"120.00 0.0032.000.000.000.00","0.000.00 152.00",,,,,,,, +"",,,,,,,,,,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,120.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,152.00 +Crocker Architectural Sheet Metal,,,,,,,,,,, +ROOFER,Journey,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,194.00,194.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,194.00 +SHEETMETAL WORKER,Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",331.00,"331.00 0.000.000.000.000.00","0.000.00 331.00",,,,,,,, +"",,,,,,,,,0.00,331.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,331.00,331.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,331.00, +"Marguerite Concrete, Inc.",,,,,,,,,,, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"T & C Woodworking, Inc.",,,,,,,,,,, +CARPENTER,Journey,22.50,0.00,0.00,11.25,0.00,0.00,11.25,0.00,0.00,22.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.50,0.00,0.00,11.25,0.00,0.00,11.25,0.00,0.00,22.50 +Total for Contractor,Journey,22.50,0.00,0.00,11.25,0.00,0.00,11.25,0.00,, +"",,,,,,,,,,0.00,22.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.50,0.00,0.00,11.25,0.00,0.00,11.25,0.00,0.00,22.50 +TRAC Builders Inc.,,,,,,,,,,, +CARPENTER,Journey,463.00,311.00,0.00,0.00,0.00,0.00,152.00,0.00,0.00,463.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,463.00,311.00,0.00,0.00,0.00,0.00,152.00,0.00,0.00,463.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,0.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,152.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",615.00,"311.00 0.00152.000.000.00152.00","0.000.00 615.00",,,,,,,, +"",,,,,,,,,0.00,615.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,615.00,311.00,0.00,152.00,0.00,0.00,152.00,0.00,0.00,615.00 +Yard Works Inc.,,,,,,,,,,, +DRIVER,Journey,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,0.00,0.00,1.50,0.00,0.00,0.00,0.00,0.00,1.50 +LABORER,Journey,31.00,23.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,31.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,31.00,23.50,0.00,7.50,0.00,0.00,0.00,0.00,0.00,31.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.50,"23.50 0.009.000.000.000.00","0.000.00 32.50",,,,,,,, +"",,,,,,,,0.00,32.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.50,23.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,32.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"1,185.00",817.50,0.00,204.25,0.00,0.00,163.25,0.00,0.00,"1,185.00" +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"1,185.00",817.50,0.00,204.25,0.00,0.00,163.25,0.00,0.00,"1,185.00" +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +LABORER,Journey,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.50,10.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.50 +Total for Contractor,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +Apprentice,159.50,23.50,0.00,136.00,0.00,0.00,0.00,0.00,0.00,159.50, +A/J Ratio,0.72,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,381.50,245.50,0.00,136.00,0.00,0.00,0.00,0.00,0.00,381.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",222.00,"222.00 0.000.000.000.000.00","0.000.00 222.00",,,,,,,, +"",,,,,,,,,0.00,222.00, +Apprentice,159.50,23.50,0.00,136.00,0.00,0.00,0.00,0.00,0.00,159.50, +A/J Ratio,0.72,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.72, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,381.50,245.50,0.00,136.00,0.00,0.00,0.00,0.00,0.00,381.50, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SPRINKLER FITTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",72.00,"72.00 0.000.000.000.000.00","0.000.00 72.00",,,,,,,, +"",,,,,,,,,,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,217.00,217.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,217.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,217.00,217.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,217.00 +Total for Contractor,Journey,217.00,217.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,217.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,217.00,217.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,217.00 +"Conserve Thru Control, Inc.",,,,,,,,,,, +HVAC (ELECTRICAL CONTROLS),Journey,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,91.00,91.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,91.00 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,373.50,373.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,373.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,373.50,373.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,373.50 +LABORER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,375.50,375.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,375.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,375.50,375.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,375.50 +"Gomes Construction Company, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00 +INSULATOR (PIPES & TANKS),Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",26.00,"26.00 0.000.000.000.000.00","0.000.00 26.00",,,,,,,, +"",,,,,,,,,0.00,26.00, +Apprentice,24.00,0.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.92,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.92, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.00,26.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,50.00, +Kenney Masonry,,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BRICK/STONE/ARTIFICIAL MASONRY,Journey,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,54.00,54.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,54.00 +LABORER: MASON TENDER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +Total for Contractor,Journey,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,87.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,87.00,87.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,87.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +PLUMBERS & GASFITTERS,Journey,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,51.00,51.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,51.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,243.00,243.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,243.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,243.00,243.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,243.00 +MTJ Landscapes,,,,,,,,,,, +LABORER,Journey,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",107.00,"107.00 0.000.000.000.000.00","0.000.00 107.00",,,,,,,, +"",,,,,,,,,0.00,107.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,107.00,107.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,107.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +LABORER,Journey,36.00,0.00,0.00,24.00,0.00,0.00,12.00,0.00,0.00,36.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.00,0.00,0.00,24.00,0.00,0.00,12.00,0.00,0.00,36.00 +Total for Contractor,Journey,36.00,0.00,0.00,24.00,0.00,0.00,12.00,0.00,, +"",,,,,,,,0.00,36.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,36.00,0.00,0.00,24.00,0.00,0.00,12.00,0.00,0.00,36.00, +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"0.00 0.000.000.000.0020.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,0.00,0.00,0.00,0.00,0.00,20.00,0.00,0.00,20.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,50.00,34.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,50.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,50.00,34.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,50.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +Total for Contractor,Journey,50.00,34.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,50.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.00,34.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,50.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,"1,393.50",386.50,0.00,"1,007.00",0.00,0.00,0.00,0.00,0.00,"1,393.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,393.50",386.50,0.00,"1,007.00",0.00,0.00,0.00,0.00,0.00,"1,393.50" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,393.50","386.50 0.001,007.000.000.000.00","0.000.00 1,393.50",,,,,,,, +"",,,,,,,,,,0.00,"1,393.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,393.50",386.50,0.00,"1,007.00",0.00,0.00,0.00,0.00,0.00,"1,393.50" +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,173.00,173.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,173.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00 +Total for Contractor,Journey,173.00,173.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,173.00, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.14,0.14,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"3,238.00","2,159.00",0.00,"1,047.00",0.00,0.00,32.00,0.00,0.00,"3,238.00" +Total Apprentice Hours,207.50,47.50,0.00,160.00,0.00,0.00,0.00,0.00,0.00,207.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"3,445.50","2,206.50",0.00,"1,207.00",0.00,0.00,32.00,0.00,0.00,"3,445.50" +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,289.50,289.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,289.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,289.50,289.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,289.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,389.00,389.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,389.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,389.00,389.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,389.00 +Total for Contractor,Journey,678.50,678.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,678.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,678.50,678.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,678.50 +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,241.50,241.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,241.50,241.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",241.50,"241.50 0.000.000.000.000.00","0.000.00 241.50",,,,,,,, +"",,,,,,,,,0.00,241.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,241.50,241.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,241.50, +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +PIPEFITTER & STEAMFITTER,Journey,96.00,64.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,64.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,112.00,80.00,32.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,112.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,112.00,80.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00, +Total Journey Hours,"1,032.00","1,000.00",32.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,032.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,032.00","1,000.00",32.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,032.00", +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Louis C. Allegrone, Inc.",,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,424.00,272.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,424.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,424.00,272.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,424.00, +LABORER: MASON TENDER,Journey,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,138.00,138.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,138.00, +Total for Contractor,Journey,562.00,410.00,0.00,152.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,562.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,562.00,410.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,562.00, +"Rockwell Roofing, Inc.",,,,,,,,,,,, +ROOFER,Journey,34.00,33.75,0.00,0.25,0.00,0.00,0.00,0.00,0.00,34.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,34.00,33.75,0.00,0.25,0.00,0.00,0.00,0.00,0.00,34.00, +SHEETMETAL WORKER,Journey,35.50,35.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,35.50,35.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.50,, +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,69.50,69.25,0.00,0.25,0.00,0.00,0.00,0.00,0.00,69.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,69.50,69.25,0.00,0.25,0.00,0.00,0.00,0.00,0.00,69.50, +Total Journey Hours,631.50,479.25,0.00,152.25,0.00,0.00,0.00,0.00,0.00,631.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,631.50,479.25,0.00,152.25,0.00,0.00,0.00,0.00,0.00,631.50, +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +LABORER,Journey,770.50,607.50,0.00,163.00,0.00,0.00,0.00,0.00,64.50,706.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,770.50,607.50,0.00,163.00,0.00,0.00,0.00,0.00,64.50,706.00 +Total for Contractor,Journey,"1,098.50",935.50,0.00,163.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,64.50,"1,034.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,098.50",935.50,0.00,163.00,0.00,0.00,0.00,0.00,64.50,"1,034.00", +Total Journey Hours,"1,098.50",935.50,0.00,163.00,0.00,0.00,0.00,0.00,64.50,"1,034.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,098.50",935.50,0.00,163.00,0.00,0.00,0.00,0.00,64.50,"1,034.00", diff --git a/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportSept2019.csv b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportSept2019.csv new file mode 100644 index 00000000..fcac1415 --- /dev/null +++ b/WGBH-DCAMM/data/WorkforceUtilizationSummaryReportSept2019.csv @@ -0,0 +1,3274 @@ +"Project Name: AEP1801E UT1 C Utility Vendor Contract- DCR- Statewide Project Code: AEP1801E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Jacqueline Electric and Contracting, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00 +Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",28.00,"28.00 0.000.000.000.000.00","0.000.00 28.00",,,,,,,, +"",,,,,,,,0.00,28.00,, +Apprentice,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +A/J Ratio,1.00,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +Total Journey Hours,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total Apprentice Hours,28.00,28.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,28.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: AEP1802E UT1 C Utility Simple Fix Project Code: AEP1802E UT1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +Total for Contractor,Journey,6.00,3.00,0.00,3.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,6.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,6.00,3.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,6.00, +Total Journey Hours,6.00,3.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,6.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,6.00,3.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,6.00, +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Arden Engineering Constructors, LLC",,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,43.00,19.00,0.00,0.00,0.00,0.00,24.00,0.00,0.00,43.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,43.00,19.00,0.00,0.00,0.00,0.00,24.00,0.00,0.00,43.00 +PIPEFITTER & STEAMFITTER,Journey,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +Total for Contractor,Journey,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,115.50 +"",Apprentice,43.00,19.00,0.00,0.00,0.00,0.00,24.00,0.00,0.00,43.00 +"",A/J Ratio,0.37,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,158.50,134.50,0.00,0.00,0.00,0.00,24.00,0.00,0.00,158.50 +"Bond Brothers, Inc.",,,,,,,,,,, +LABORER,Journey,336.00,244.00,0.00,42.00,0.00,0.00,50.00,0.00,0.00,336.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,336.00,244.00,0.00,42.00,0.00,0.00,50.00,0.00,0.00,336.00 +"OTHER POWER DRIVEN EQUIPMENT - CLASS II",Journey,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,137.00,137.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,137.00, +"Project Name: BRC1901 DB1 C Campus Wide Electrical Infrastructures Upgrade - Bristol Community College Project Code: BRC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,473.00,381.00,0.00,42.00,0.00,0.00,50.00,0.00,0.00,473.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,473.00,381.00,0.00,42.00,0.00,0.00,50.00,0.00,0.00,473.00 +Fall River Electrical Assoc.,,,,,,,,,,, +ELECTRICIAN,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Apprentice,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +A/J Ratio,0.93,0.93,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.93, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",44.00,"44.00 0.000.000.000.000.00","0.000.00 44.00",,,,,,,, +"",,,,,,,,0.00,44.00,, +Apprentice,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00, +A/J Ratio,0.93,0.93,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.93, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00, +Total Journey Hours,632.50,540.50,0.00,42.00,0.00,0.00,50.00,0.00,0.00,632.50, +Total Apprentice Hours,84.00,60.00,0.00,0.00,0.00,0.00,24.00,0.00,0.00,84.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,716.50,600.50,0.00,42.00,0.00,0.00,74.00,0.00,0.00,716.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Lawrence Lynch Corp,,,,,,,,,,, +EQUIPMENT OPERATOR (Class B CDL),Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,100.00,100.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,100.00 +"",Apprentice,9.50,0.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,9.50 +"",A/J Ratio,0.10,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.10 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,109.50,100.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,109.50 +Total for Contractor,Journey,108.00,108.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,108.00 +"",Apprentice,9.50,0.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,9.50 +"",A/J Ratio,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,117.50,108.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,117.50 +"Sullivan & McLaughlin Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",120.00,"120.00 0.000.000.000.000.00","0.000.00 120.00",,,,,,,, +"",,,,,,,,,0.00,120.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00, +"Project Name: BSC1901 DB1 C BSC-Bridgewater-Campus-Wide-Electrical Infrastructure Upgrade Project Code: BSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,228.00,228.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.00 +Total Apprentice Hours,9.50,0.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,9.50 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,237.50,228.00,0.00,9.50,0.00,0.00,0.00,0.00,0.00,237.50 +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Colantonio, Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",64.00,"64.00 0.000.000.000.000.00","0.000.00 64.00",,,,,,,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"E. Amanti & Sons, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,0.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,40.00 +SHEETMETAL WORKER,Journey,122.00,122.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,122.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,122.00,122.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,122.00 +Total for Contractor,Journey,162.00,122.00,0.00,40.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,162.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,122.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,162.00 +"Marmelo Brothers Construction Company, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,71.00,71.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,71.00,71.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",71.00,"71.00 0.000.000.000.000.00","0.000.00 71.00",,,,,,,, +"",,,,,,,,,0.00,71.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,71.00,71.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.00, +"Thomas Young Associates, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: BSD1801 DC1 C Bristol County Jail & H.O.C. Roof repair/Replacement Project Code: BSD1801 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +SHEETMETAL WORKER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +Total Journey Hours,341.00,301.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,341.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,341.00,301.00,0.00,40.00,0.00,0.00,0.00,0.00,0.00,341.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Chet's Welding Inc.,,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",1.50,"1.50 0.000.000.000.000.00","0.000.00 1.50",,,,,,,,, +"",,,,,,,,,,0.00,1.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50, +"S&F Concrete Contractors, Inc.",,,,,,,,,,,, +CARPENTER,Journey,5.00,0.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,5.00,0.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,5.00, +CEMENT MASONRY/PLASTERING,Journey,5.00,0.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,5.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,5.00,0.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,5.00, +LABORER,Journey,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,9.00,9.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,9.00,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"0.000.00 1.50", +0.00,1.50 +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +Total for Contractor,Journey,19.00,9.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,19.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,19.00,9.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,19.00, +W.L. French Excavating Corp.,,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,481.50,481.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,481.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,481.50,481.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,481.50, +LABORER,Journey,886.50,886.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,886.50, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,886.50,886.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,886.50, +Total for Contractor,Journey,"1,368.00","1,368.00",0.00,0.00,0.00,0.00,0.00,0.00,,, +"",,,,,,,,,,0.00,"1,368.00", +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,"1,368.00","1,368.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,368.00", +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,,, +ELECTRICIAN,Journey,154.00,82.50,33.50,38.00,0.00,0.00,0.00,0.00,0.00,154.00, +Apprentice,117.00,45.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,117.00,, +A/J Ratio,0.76,0.55,2.15,0.00,0.00,0.00,0.00,0.00,0.00,0.76,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,271.00,127.50,105.50,38.00,0.00,0.00,0.00,0.00,0.00,271.00,, +"Project Name: CHE1604 DC1 CM Construction Management Services Chelsea Soldiers' Home Comunity Living Center Project Code: CHE1604 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,154.00,82.50,33.50,38.00,0.00,0.00,0.00,0.00,0.00,154.00 +Apprentice,117.00,45.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,117.00, +A/J Ratio,0.76,0.55,2.15,0.00,0.00,0.00,0.00,0.00,0.00,0.76, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,271.00,127.50,105.50,38.00,0.00,0.00,0.00,0.00,0.00,271.00, +Total Journey Hours,"1,542.50","1,461.00",33.50,48.00,0.00,0.00,0.00,0.00,0.00,"1,542.50", +Total Apprentice Hours,117.00,45.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,117.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,659.50","1,506.00",105.50,48.00,0.00,0.00,0.00,0.00,0.00,"1,659.50", +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"General Mechanical Contractors, Inc.",,,,,,,,,,, +SHEETMETAL WORKER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Harris Environmental Systems,,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Orlando Annulli & Sons, Inc.",,,,,,,,,,, +CARPENTER,Journey,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,3.50,3.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.50, +"Project Name: CME0902 DC1 C Chief Medical Examiner Office West Central Combined Project Code: CME0902 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,67.00,67.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,67.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",70.50,"70.50 0.000.000.000.000.00","0.000.00 70.50",,,,,,,, +"",,,,,,,,,0.00,70.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,70.50,70.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,70.50, +Total Journey Hours,110.50,110.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,110.50,110.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J & S Concrete Pumping and Grouting, Inc.",,,,,,,,,,, +LABORER,Journey,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",10.00,"10.00 0.000.000.000.000.00","0.000.00 10.00",,,,,,,, +"",,,,,,,,,,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,10.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,10.00 +N.E.L. Corporation,,,,,,,,,,, +CARPENTER,Journey,129.00,122.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,129.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,129.00,122.00,0.00,7.00,0.00,0.00,0.00,0.00,0.00,129.00 +CEMENT MASONRY/PLASTERING,Journey,6.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,0.00,0.00,6.00,0.00,0.00,0.00,0.00,0.00,6.00 +DEMO: CONCRETE CUTTER/SAWYER,Journey,4.00,2.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,2.00,0.00,2.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCP1907 OM1 C Metro Region Job Order Contracting General Contractor Services Project Code: DCP1907 OM1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +HOISTING ENGINEER/CRANES/GRADALLS,Journey,10.00,2.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,2.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,10.00 +IRONWORKER/WELDER,Journey,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,140.00,73.00,0.00,67.00,0.00,0.00,0.00,0.00,27.00,113.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,140.00,73.00,0.00,67.00,0.00,0.00,0.00,0.00,27.00,113.00 +Total for Contractor,Journey,297.00,199.00,8.00,90.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,27.00,270.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,297.00,199.00,8.00,90.00,0.00,0.00,0.00,0.00,27.00,270.00, +Total Journey Hours,307.00,209.00,8.00,90.00,0.00,0.00,0.00,0.00,27.00,280.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,307.00,209.00,8.00,90.00,0.00,0.00,0.00,0.00,27.00,280.00, +"Project Name: DCP1907 OM2 C Job Order Contract For General Contractor Services Project Code: DCP1907 OM2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"ONE SOURCE CONSTRUCTION, LLC",,,,,,,,,,, +CARPENTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +ELECTRICIAN,Journey,0.40,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.40 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,0.40,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.40 +Total for Contractor,Journey,2.40,2.40,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,2.40,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.40,2.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.40, +Total Journey Hours,2.40,2.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.40, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,2.40,2.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.40, +"Project Name: DCP1919 HC1 C Office Buildout, McCormack Building 13th Floor Project Code: DCP1919 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Tremont HVAC LLC,,,,,,,,,,, +SHEETMETAL WORKER,Journey,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",15.00,"15.00 0.000.000.000.000.00","0.000.00 15.00",,,,,,,, +"",,,,,,,,,,0.00,15.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.00,15.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,15.00 +"Watermark Environmental, Incorporated",,,,,,,,,,, +LABORER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00 +Total for Contractor,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,96.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00, +Total Journey Hours,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,111.00,111.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,111.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Charles Services & Equipment,,,,,,,,,,, +CARPENTER,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +LABORER,Journey,206.00,206.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,206.00,206.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.00 +Total for Contractor,Journey,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,222.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,222.00,222.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,222.00 +"Greenwood Industries, Inc",,,,,,,,,,, +ROOFER,Journey,21.00,14.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,14.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",21.00,"14.00 7.000.000.000.000.00","0.000.00 21.00",,,,,,,, +"",,,,,,,,,0.00,21.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,14.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"J.C. Cannistraro, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PLUMBERS & GASFITTERS,Journey,401.00,273.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,401.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,401.00,273.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,401.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",401.00,"273.00 128.000.000.000.000.00","0.000.00 401.00",,,,,,,, +"",,,,,,,,,,0.00,401.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,401.00,273.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,401.00 +"Jupiter Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",Apprentice,148.00,8.00,0.00,0.00,140.00,0.00,0.00,0.00,0.00,148.00 +"",A/J Ratio,1.00,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,156.00,0.00,0.00,140.00,0.00,0.00,0.00,0.00,296.00 +Total for Contractor,Journey,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,148.00 +"",Apprentice,148.00,8.00,0.00,0.00,140.00,0.00,0.00,0.00,0.00,148.00 +"",A/J Ratio,1.00,0.05,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,156.00,0.00,0.00,140.00,0.00,0.00,0.00,0.00,296.00 +"Manafort-Precision, LLC",,,,,,,,,,, +CARPENTER,Journey,95.03,95.03,0.00,0.00,0.00,0.00,0.00,0.00,0.00,95.03 +Apprentice,10.00,0.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,10.00, +A/J Ratio,0.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.11, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,105.03,95.03,0.00,10.00,0.00,0.00,0.00,0.00,0.00,105.03, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CEMENT MASONRY/PLASTERING,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +IRONWORKER/WELDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,114.50,114.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,114.50,114.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,114.50 +Total for Contractor,Journey,257.53,257.53,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,257.53, +"",Apprentice,10.00,0.00,0.00,10.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",A/J Ratio,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,267.53,257.53,0.00,10.00,0.00,0.00,0.00,0.00,0.00,267.53 +"Manganaro Northeast, LLC",,,,,,,,,,, +CARPENTER,Journey,322.00,322.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,322.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,322.00,322.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,322.00 +LABORER,Journey,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,21.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,21.00, +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,343.00,343.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,343.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,343.00,343.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,343.00 +Taibbi Equipment Corp.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +DRIVER,Journey,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,41.00,41.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,41.00 +VAC-HAUL,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",321.00,"321.00 0.000.000.000.000.00","0.000.00 321.00",,,,,,,, +"",,,,,,,,,0.00,321.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,321.00,321.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,321.00, +Tri State Building LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,740.00,620.00,0.00,0.00,0.00,0.00,120.00,0.00,176.00,564.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,740.00,620.00,0.00,0.00,0.00,0.00,120.00,0.00,176.00,564.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",740.00,"620.00 0.000.000.000.00120.00","0.00176.00 564.00",,,,,,,, +"",,,,,,,,,176.00,564.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,740.00,620.00,0.00,0.00,0.00,0.00,120.00,0.00,176.00,564.00 +"United Civil, Inc.",,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,328.00,328.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,328.00 +LABORER,Journey,"1,163.00","1,163.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,163.00" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,163.00","1,163.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,163.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,491.00","1,491.00 0.000.000.000.000.00","0.000.00 1,491.00",,,,,,,, +"",,,,,,,,0.00,"1,491.00",, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,491.00","1,491.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,491.00", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DCR1110 DC1 CM North Point New Maintenance Facility Project Code: DCR1110 DC1 CM",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,"3,944.53","3,689.53",135.00,0.00,0.00,0.00,120.00,0.00,176.00,"3,768.53" +Total Apprentice Hours,158.00,8.00,0.00,10.00,140.00,0.00,0.00,0.00,0.00,158.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,"4,102.53","3,697.53",135.00,10.00,140.00,0.00,120.00,0.00,176.00,"3,926.53" +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,62.50,38.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.50,38.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",62.50,"38.50 24.000.000.000.000.00","0.000.00 62.50",,,,,,,, +"",,,,,,,,,,0.00,62.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,62.50,38.50,24.00,0.00,0.00,0.00,0.00,0.00,0.00,62.50 +Calhess Restoration & Waterproofing Corp.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,"1,035.50",912.50,123.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,035.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,035.50",912.50,123.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,035.50" +Total for Contractor,Journey,"1,035.50",912.50,123.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,035.50" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,035.50",912.50,123.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,035.50" +Thyssenkrupp Elevator Corp.,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: DMH1301 DC1 C Solomon Carter Fuller Center Envelope Repair/Window Replacement Project Code: DMH1301 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,"1,114.00",967.00,147.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,114.00", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"1,114.00",967.00,147.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,114.00", +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Carlysle Engineering, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",20.00,"20.00 0.000.000.000.000.00","0.000.00 20.00",,,,,,,, +"",,,,,,,,,,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"Contractors Network, Inc.",,,,,,,,,,, +CARPENTER,Journey,147.50,147.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,147.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,147.50,147.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,147.50 +LABORER,Journey,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.00,7.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",154.50,"154.50 0.000.000.000.000.00","0.000.00 154.50",,,,,,,, +"",,,,,,,,,0.00,154.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,154.50,154.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.50, +"Viking Controls, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DMH1601 FC2 C Renovation of Cain Laundry Room, Taunton State Hospital Project Code: DMH1601 FC2 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",12.50,"12.50 0.000.000.000.000.00","0.000.00 12.50",,,,,,,, +"",,,,,,,,,0.00,12.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,12.50,12.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,12.50, +Total Journey Hours,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,288.00,288.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,288.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.53,0.53,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.53 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",288.00,"288.00 0.000.000.000.000.00","0.000.00 288.00",,,,,,,, +"",,,,,,,,,,0.00,288.00 +"",Apprentice,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",A/J Ratio,0.53,0.53,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.53 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,440.00,440.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,440.00 +Araujo Bro Plumbing Inc,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,84.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,84.00,84.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,84.00 +LABORER,Journey,16.00,12.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,12.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,16.00 +PLUMBERS & GASFITTERS,Journey,272.00,272.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,272.00 +Apprentice,228.00,168.00,0.00,60.00,0.00,0.00,0.00,0.00,0.00,228.00, +A/J Ratio,0.84,0.62,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.84, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,500.00,440.00,0.00,60.00,0.00,0.00,0.00,0.00,0.00,500.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,372.00,368.00,0.00,4.00,0.00,0.00,0.00,0.00,0.00,372.00 +"",Apprentice,228.00,168.00,0.00,60.00,0.00,0.00,0.00,0.00,0.00,228.00 +"",A/J Ratio,0.61,0.46,0.00,15.00,0.00,0.00,0.00,0.00,0.00,0.61 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,600.00,536.00,0.00,64.00,0.00,0.00,0.00,0.00,0.00,600.00 +Atlantic Contracting & Specialties,,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +LABORER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,112.00 +Debrino Caulking Associates Inc.,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,76.00,56.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,76.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,56.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",76.00,"56.00 0.0020.000.000.000.00","0.000.00 76.00",,,,,,,, +"",,,,,,,,,0.00,76.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,76.00,56.00,0.00,20.00,0.00,0.00,0.00,0.00,0.00,76.00 +"Donnegan Systems, Inc",,,,,,,,,,, +CARPENTER,Journey,33.00,11.00,4.00,18.00,0.00,0.00,0.00,0.00,0.00,33.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.00,11.00,4.00,18.00,0.00,0.00,0.00,0.00,0.00,33.00 +Total for Contractor,Journey,33.00,11.00,4.00,18.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,33.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.00,11.00,4.00,18.00,0.00,0.00,0.00,0.00,0.00,33.00, +Door & Security Solutions LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,44.16,44.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.16 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.16,44.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.16 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",44.16,"44.16 0.000.000.000.000.00","0.000.00 44.16",,,,,,,, +"",,,,,,,,,,0.00,44.16 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,44.16,44.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.16 +Hartin Welding,,,,,,,,,,, +IRONWORKER/WELDER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Total for Contractor,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +John W. Egan Company Inc.,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,208.00,208.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,208.00 +Nashoba Paving,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,206.00,206.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,206.00,206.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,206.00 +DRIVER,Journey,33.50,33.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,33.50,33.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.50 +LABORER,Journey,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,197.00,197.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,197.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",436.50,"436.50 0.000.000.000.000.00","0.000.00 436.50",,,,,,,, +"",,,,,,,,,0.00,436.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,436.50,436.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,436.50, +"Pilgrim Interiors, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,14.94,14.94,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.94 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.94,14.94,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.94 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",14.94,"14.94 0.000.000.000.000.00","0.000.00 14.94",,,,,,,, +"",,,,,,,,,,0.00,14.94 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,14.94,14.94,0.00,0.00,0.00,0.00,0.00,0.00,0.00,14.94 +"TC Controls & Services, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Total for Contractor,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"William F. Lynch Co., Inc.",,,,,,,,,,, +ADS/SUBMERSIBLE PILOT,Journey,68.00,0.00,0.00,0.00,0.00,0.00,68.00,0.00,0.00,68.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,68.00,0.00,0.00,0.00,0.00,0.00,68.00,0.00,0.00,68.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DOC1507 DC1 C New Food Servicing Building - MCI Shirley Project Code: DOC1507 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +SHEETMETAL WORKER,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +Total for Contractor,Journey,278.00,210.00,0.00,0.00,0.00,0.00,68.00,0.00,, +"",,,,,,,,,0.00,278.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,278.00,210.00,0.00,0.00,0.00,0.00,68.00,0.00,0.00,278.00, +Total Journey Hours,"2,018.60","1,904.60",4.00,42.00,0.00,0.00,68.00,0.00,0.00,"2,018.60", +Total Apprentice Hours,380.00,320.00,0.00,60.00,0.00,0.00,0.00,0.00,0.00,380.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,398.60","2,224.60",4.00,102.00,0.00,0.00,68.00,0.00,0.00,"2,398.60", +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"GFS Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,382.00,152.00,0.00,230.00,0.00,0.00,0.00,0.00,0.00,382.00 +"",Apprentice,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",A/J Ratio,0.27,0.00,0.00,0.45,0.00,0.00,0.00,0.00,0.00,0.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,486.00,152.00,0.00,334.00,0.00,0.00,0.00,0.00,0.00,486.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",382.00,"152.00 0.00230.000.000.000.00","0.000.00 382.00",,,,,,,, +"",,,,,,,,,,0.00,382.00 +"",Apprentice,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00 +"",A/J Ratio,0.27,0.00,0.00,0.45,0.00,0.00,0.00,0.00,0.00,0.27 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,486.00,152.00,0.00,334.00,0.00,0.00,0.00,0.00,0.00,486.00 +"JM Electrical Company, Inc",,,,,,,,,,, +ELECTRICIAN,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Total for Contractor,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Stellar Building Technologies,,,,,,,,,,, +ELECTRICIAN,Journey,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.00,146.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,146.00, +"Project Name: DPH1306 EC1 C Energy Water Upgrades Pappas Rehabilitation Hospital Project Code: DPH1306 EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",186.00,"186.00 0.000.000.000.000.00","0.000.00 186.00",,,,,,,, +"",,,,,,,,,0.00,186.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,186.00,186.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,186.00, +Total Journey Hours,602.00,372.00,0.00,230.00,0.00,0.00,0.00,0.00,0.00,602.00, +Total Apprentice Hours,104.00,0.00,0.00,104.00,0.00,0.00,0.00,0.00,0.00,104.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,706.00,372.00,0.00,334.00,0.00,0.00,0.00,0.00,0.00,706.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: DPH1350E EC1 C DPH-Lab Institute, Jamaica Plain-Boiler-Energy Design-Build Project Code: DPH1350E EC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"J.C. Cannistraro, LLC",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",18.00,"18.00 0.000.000.000.000.00","0.000.00 18.00",,,,,,,, +"",,,,,,,,0.00,18.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +Total Journey Hours,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,18.00,18.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,18.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: EPS1401E EC1 C MEMA Headquarters Energy and Water Upgrades Project Code: EPS1401E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Atlantic Bay Contracting Co., Inc.",,,,,,,,,,, +"ASBESTOS REMOVER - PIPE / MECH. EQUIPT",Journey,53.50,0.00,0.00,53.50,0.00,0.00,0.00,0.00,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,0.00,0.00,53.50,0.00,0.00,0.00,0.00,0.00,53.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",53.50,"0.00 0.0053.500.000.000.00","0.000.00 53.50",,,,,,,, +"",,,,,,,,,,0.00,53.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,53.50,0.00,0.00,53.50,0.00,0.00,0.00,0.00,0.00,53.50 +"Professional Fire Systems, Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00 +Total for Contractor,Journey,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,0.00,64.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00, +Total Journey Hours,117.50,64.00,0.00,53.50,0.00,0.00,0.00,0.00,0.00,117.50, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,117.50,64.00,0.00,53.50,0.00,0.00,0.00,0.00,0.00,117.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +PLUMBERS & GASFITTERS,Journey,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,35.00,35.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,35.00 +Total for Contractor,Journey,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,42.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.50,42.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.50 +"Blue Construction, Inc.",,,,,,,,,,, +LABORER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,0.00,40.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00, +"Central Ceilings, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +CARPENTER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"",A/J Ratio,0.60,0.60,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,40.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",40.00,"40.00 0.000.000.000.000.00","0.000.00 40.00",,,,,,,, +"",,,,,,,,,,0.00,40.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,0.00 +"",A/J Ratio,0.60,0.60,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,64.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00,40.00 +"Chandler Architectural Products, Inc.",,,,,,,,,,, +CARPENTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,22.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"24.00 0.000.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,0.00,24.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +John W. Egan Company Inc.,,,,,,,,,,, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"PAINTER / TAPER (BRUSH, NEW)",Journey,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",3.00,"3.00 0.000.000.000.000.00","0.000.00 3.00",,,,,,,, +"",,,,,,,,,,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,3.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.00 +SOS Corporation,,,,,,,,,,, +LABORER,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00 +Total for Contractor,Journey,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,40.00,0.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00,0.00 +"Superior Caulking & Waterproofing Co., Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,22.00,14.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,22.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,22.00,14.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,22.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,22.00,14.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,22.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,22.00,14.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,22.00 +"Titan Roofing, Inc.",,,,,,,,,,, +ROOFER,Journey,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,5.00,0.00,5.00,0.00,0.00,0.00,0.00,0.00,10.00 +SHEETMETAL WORKER,Journey,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.25,16.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.25 +Total for Contractor,Journey,26.25,21.25,0.00,5.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,26.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.25,21.25,0.00,5.00,0.00,0.00,0.00,0.00,0.00,26.25 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,320.00,320.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,320.00 +Apprentice,192.00,80.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +A/J Ratio,0.60,0.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.60, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,512.00,400.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,512.00, +"Project Name: HCC0801 DC2 HCC-G Building Renovation Addition Holyoke Project Code: HCC0801 DC2",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +TELECOMMUNICATION TECHNICIAN,Journey,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,82.00,82.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,82.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",402.00,"402.00 0.000.000.000.000.00","0.000.00 402.00",,,,,,,, +"",,,,,,,,,0.00,402.00, +Apprentice,192.00,80.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00, +A/J Ratio,0.48,0.20,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.48, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,594.00,482.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,594.00, +Total Journey Hours,639.75,626.75,0.00,13.00,0.00,0.00,0.00,0.00,40.00,599.75, +Total Apprentice Hours,216.00,104.00,112.00,0.00,0.00,0.00,0.00,0.00,24.00,192.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,855.75,730.75,112.00,13.00,0.00,0.00,0.00,0.00,64.00,791.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: HCC1901 DB1 C HCC-Powerplant/Utility Tunnel-Main Switchgear and Power Center Replacement Project Code: HCC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,0.00,16.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Journey Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1506 C Fire Alarm Protection Maintenance Central Region Metro Boston Project Code: IFM1506 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,21.00,18.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,21.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,18.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",21.00,"18.00 0.000.003.000.000.00","0.000.00 21.00",,,,,,,, +"",,,,,,,,0.00,21.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,21.00,18.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,21.00, +Total Journey Hours,21.00,18.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,21.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,21.00,18.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,21.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: IFM1507 C Fire Alarm Protection Maintenance Northeast and Southeast Region Metro Boston Project Code: IFM1507",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Dynamics, Inc.",,,,,,,,,,, +FIRE ALARM REPAIR / MAINTENANCE,Journey,207.00,130.00,0.00,19.00,58.00,0.00,0.00,0.00,0.00,207.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,207.00,130.00,0.00,19.00,58.00,0.00,0.00,0.00,0.00,207.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",207.00,"130.00 0.0019.0058.000.000.00","0.000.00 207.00",,,,,,,, +"",,,,,,,,0.00,207.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,207.00,130.00,0.00,19.00,58.00,0.00,0.00,0.00,0.00,207.00, +Total Journey Hours,207.00,130.00,0.00,19.00,58.00,0.00,0.00,0.00,0.00,207.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,207.00,130.00,0.00,19.00,58.00,0.00,0.00,0.00,0.00,207.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"48.00 0.000.000.000.000.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +N B Kenney Company,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +PIPEFITTER & STEAMFITTER,Journey,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,56.00,56.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,56.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",56.00,"56.00 0.000.000.000.000.00","0.000.00 56.00",,,,,,,, +"",,,,,,,,,0.00,56.00, +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.43,0.43,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.43, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +Ostrow Electric Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,21.00,5.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,21.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,5.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,21.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",21.00,"5.00 0.0016.000.000.000.00","0.000.00 21.00",,,,,,,, +"",,,,,,,,,0.00,21.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,21.00,5.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,21.00 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +LABORER,Journey,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,88.00,88.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,88.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"176.00 0.000.000.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,0.00,176.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: MWC1901 DB1 C MWC- Powerplant/Campus wide-Mechanical Infrastructure Upgrade Project Code: MWC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total Journey Hours,301.00,285.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,301.00 +Total Apprentice Hours,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Grand Total Hours,325.00,309.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,325.00 +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Cavalieri Construction Company Inc.,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,86.00,86.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,86.00 +DRIVER,Journey,3.25,3.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.25,3.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,3.25 +LABORER,Journey,185.50,121.50,0.00,64.00,0.00,0.00,0.00,0.00,0.00,185.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,185.50,121.50,0.00,64.00,0.00,0.00,0.00,0.00,0.00,185.50 +Total for Contractor,Journey,274.75,210.75,0.00,64.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,274.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,274.75,210.75,0.00,64.00,0.00,0.00,0.00,0.00,0.00,274.75 +G.O. Services. LLC,,,,,,,,,,, +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: NSC1901 DB1 C NSC-Lynn-Main Building - Electrical Infrastructure Upgrades and Resiliency Project Code: NSC1901 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +McDonald Electric Corporation,,,,,,,,,,, +ELECTRICIAN,Journey,97.00,97.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,97.00 +Apprentice,61.00,0.00,0.00,61.00,0.00,0.00,0.00,0.00,0.00,61.00, +A/J Ratio,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,158.00,97.00,0.00,61.00,0.00,0.00,0.00,0.00,0.00,158.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",97.00,"97.00 0.000.000.000.000.00","0.000.00 97.00",,,,,,,, +"",,,,,,,,0.00,97.00,, +Apprentice,61.00,0.00,0.00,61.00,0.00,0.00,0.00,0.00,0.00,61.00, +A/J Ratio,0.63,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.63, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,158.00,97.00,0.00,61.00,0.00,0.00,0.00,0.00,0.00,158.00, +Total Journey Hours,379.75,315.75,0.00,64.00,0.00,0.00,0.00,0.00,0.00,379.75, +Total Apprentice Hours,61.00,0.00,0.00,61.00,0.00,0.00,0.00,0.00,0.00,61.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,440.75,315.75,0.00,125.00,0.00,0.00,0.00,0.00,0.00,440.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ADEP Group,,,,,,,,,,, +"LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER",Journey,170.00,0.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,170.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,170.00,0.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,170.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",170.00,"0.00 0.00170.000.000.000.00","0.000.00 170.00",,,,,,,, +"",,,,,,,,,,0.00,170.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,170.00,0.00,0.00,170.00,0.00,0.00,0.00,0.00,0.00,170.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00 +PIPEFITTER & STEAMFITTER,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",4.00,"4.00 0.000.000.000.000.00","0.000.00 4.00",,,,,,,, +"",,,,,,,,,0.00,4.00, +Apprentice,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,4.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,8.00, +Ostrow Electric Company,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: QCC1701 HC1 C Community College Science Lab Renovations Project Code: QCC1701 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +ELECTRICIAN,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",16.00,"16.00 0.000.000.000.000.00","0.000.00 16.00",,,,,,,, +"",,,,,,,,,0.00,16.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +SMS Services,,,,,,,,,,, +LABORER,Journey,111.25,62.00,15.50,33.75,0.00,0.00,0.00,0.00,6.00,105.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,111.25,62.00,15.50,33.75,0.00,0.00,0.00,0.00,6.00,105.25 +Total for Contractor,Journey,111.25,62.00,15.50,33.75,0.00,0.00,0.00,0.00,, +"",,,,,,,,6.00,105.25,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,111.25,62.00,15.50,33.75,0.00,0.00,0.00,0.00,6.00,105.25, +Total Journey Hours,301.25,82.00,15.50,203.75,0.00,0.00,0.00,0.00,6.00,295.25, +Total Apprentice Hours,4.00,0.00,0.00,0.00,4.00,0.00,0.00,0.00,0.00,4.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,305.25,82.00,15.50,203.75,4.00,0.00,0.00,0.00,6.00,299.25, +"Project Name: SDN1501E EC1 C Comprehensive Energy and Water Upgrades Project Code: SDN1501E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Batallas Electric Inc.,,,,,,,,,,, +ELECTRICIAN,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Contractors Network, Inc.",,,,,,,,,,, +CARPENTER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +LABORER: CARPENTER TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Project Name: SDN1501E EC1 C Comprehensive Energy and Water Upgrades Project Code: SDN1501E EC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +Total Journey Hours,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Adams Plumbing & Heating, Inc.",,,,,,,,,,, +PIPEFITTER & STEAMFITTER,Journey,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,120.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,120.00 +SHEETMETAL WORKER,Journey,247.00,0.00,0.00,247.00,0.00,0.00,0.00,0.00,0.00,247.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,247.00,0.00,0.00,247.00,0.00,0.00,0.00,0.00,0.00,247.00 +Total for Contractor,Journey,367.00,120.00,0.00,247.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,367.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,367.00,120.00,0.00,247.00,0.00,0.00,0.00,0.00,0.00,367.00 +"American Electrical Construction, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,326.50,326.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,326.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,326.50,326.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,326.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",326.50,"326.50 0.000.000.000.000.00","0.000.00 326.50",,,,,,,, +"",,,,,,,,,0.00,326.50, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,326.50,326.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,326.50, +B&B Lightning Protection,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +ELECTRICIAN,Journey,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",11.00,"11.00 0.000.000.000.000.00","0.000.00 11.00",,,,,,,, +"",,,,,,,,,,0.00,11.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.00,11.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.00 +"Cogswell Sprinkler Co., Inc.",,,,,,,,,,, +SPRINKLER FITTER,Journey,15.50,0.00,0.00,0.00,15.50,0.00,0.00,0.00,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,0.00,0.00,0.00,15.50,0.00,0.00,0.00,0.00,15.50 +Total for Contractor,Journey,15.50,0.00,0.00,0.00,15.50,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,15.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,15.50,0.00,0.00,0.00,15.50,0.00,0.00,0.00,0.00,15.50 +GML Construction Inc,,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,78.03,0.00,0.00,0.00,0.00,0.00,78.03,0.00,0.00,78.03 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,78.03,0.00,0.00,0.00,0.00,0.00,78.03,0.00,0.00,78.03, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,90.63,0.00,0.00,0.00,0.00,0.00,90.63,0.00,0.00,90.63 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,90.63,0.00,0.00,0.00,0.00,0.00,90.63,0.00,0.00,90.63 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",168.66,"0.00 0.000.000.000.00168.66","0.000.00 168.66",,,,,,,, +"",,,,,,,,,,0.00,168.66 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,168.66,0.00,0.00,0.00,0.00,0.00,168.66,0.00,0.00,168.66 +"H Carr & Sons, Inc",,,,,,,,,,, +LABORER,Journey,106.00,53.00,0.00,0.00,0.00,0.00,53.00,0.00,0.00,106.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,106.00,53.00,0.00,0.00,0.00,0.00,53.00,0.00,0.00,106.00 +"PAINTER / TAPER (BRUSH, NEW)",Journey,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,53.00,53.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,53.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",159.00,"106.00 0.000.000.000.0053.00","0.000.00 159.00",,,,,,,, +"",,,,,,,,,0.00,159.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,159.00,106.00,0.00,0.00,0.00,0.00,53.00,0.00,0.00,159.00, +"J.D. Rivet & Co., Inc.",,,,,,,,,,, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +HOISTING ENGINEER/CRANES/GRADALLS,Journey,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,42.00,42.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,42.00 +ROOFER,Journey,264.00,261.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,264.00 +"",Apprentice,228.50,228.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.50 +"",A/J Ratio,0.87,0.88,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.87 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,492.50,489.50,0.00,3.00,0.00,0.00,0.00,0.00,0.00,492.50 +Total for Contractor,Journey,306.00,303.00,0.00,3.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,306.00 +"",Apprentice,228.50,228.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,228.50 +"",A/J Ratio,0.75,0.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.75 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,534.50,531.50,0.00,3.00,0.00,0.00,0.00,0.00,0.00,534.50 +"Lighthouse Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,414.00,414.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,414.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,414.00,414.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,414.00 +LABORER: MASON TENDER,Journey,456.00,224.00,0.00,232.00,0.00,0.00,0.00,0.00,0.00,456.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,456.00,224.00,0.00,232.00,0.00,0.00,0.00,0.00,0.00,456.00, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,870.00,638.00,0.00,232.00,0.00,0.00,0.00,0.00,0.00,870.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,870.00,638.00,0.00,232.00,0.00,0.00,0.00,0.00,0.00,870.00 +N B Kenney Company,,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,332.00,332.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,332.00 +"",Apprentice,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,456.00,456.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,456.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",332.00,"332.00 0.000.000.000.000.00","0.000.00 332.00",,,,,,,, +"",,,,,,,,,0.00,332.00, +"",Apprentice,124.00,124.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,124.00 +"",A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.37 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,456.00,456.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,456.00 +"Pilgrim Interiors, Inc.",,,,,,,,,,, +CARPENTER,Journey,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.25 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.25 +Total for Contractor,Journey,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,8.25,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.25,8.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.25, +"Silverback Concrete Construction, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,514.50,514.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,514.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,514.50,514.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,514.50 +CEMENT MASONRY/PLASTERING,Journey,49.50,40.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,49.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.50,40.50,0.00,9.00,0.00,0.00,0.00,0.00,0.00,49.50 +LABORER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +LABORER: CARPENTER TENDER,Journey,283.00,283.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,283.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,283.00,283.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,283.00 +LABORER: CEMENT FINISHER TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,863.00,854.00,0.00,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,863.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,863.00,854.00,0.00,9.00,0.00,0.00,0.00,0.00,0.00,863.00, +"SMJ Metal Company, Inc.",,,,,,,,,,, +"Project Name: SDW1501 DC1 C New Medical & Intake Unit Worcester County Jail & HOC Project Code: SDW1501 DC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",33.00,"33.00 0.000.000.000.000.00","0.000.00 33.00",,,,,,,, +"",,,,,,,,,0.00,33.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,33.00,33.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,33.00, +Total Journey Hours,"3,459.91","2,731.75",0.00,491.00,15.50,0.00,221.66,0.00,0.00,"3,459.91", +Total Apprentice Hours,352.50,352.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,352.50, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"3,812.41","3,084.25",0.00,491.00,15.50,0.00,221.66,0.00,0.00,"3,812.41", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: STC1902 DB1 C Campus Wide Electrical Infrastructures Upgrade - STCC Project Code: STC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Electrical Contractors, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",44.00,"44.00 0.000.000.000.000.00","0.000.00 44.00",,,,,,,, +"",,,,,,,,0.00,44.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00, +Total Journey Hours,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,44.00,44.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,44.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Automated Building Systems,,,,,,,,,,, +ELECTRICIAN,Journey,697.00,697.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,697.00 +"",Apprentice,286.00,286.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00,128.00 +"",A/J Ratio,0.41,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.18 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,983.00,983.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00,825.00 +PIPEFITTER & STEAMFITTER,Journey,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,26.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,26.00 +Total for Contractor,Journey,723.00,723.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,723.00 +"",Apprentice,286.00,286.00,0.00,0.00,0.00,0.00,0.00,0.00,158.00,128.00 +"",A/J Ratio,0.40,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.18 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,009.00","1,009.00",0.00,0.00,0.00,0.00,0.00,0.00,158.00,851.00 +"Central Ceilings, Inc.",,,,,,,,,,, +CARPENTER,Journey,815.00,815.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,815.00 +Apprentice,449.00,338.50,110.50,0.00,0.00,0.00,0.00,0.00,82.50,366.50, +A/J Ratio,0.55,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,264.00","1,153.50",110.50,0.00,0.00,0.00,0.00,0.00,82.50,"1,181.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",815.00,"815.00 0.000.000.000.000.00","0.000.00 815.00",,,,,,,, +"",,,,,,,,,0.00,815.00, +Apprentice,449.00,338.50,110.50,0.00,0.00,0.00,0.00,0.00,82.50,366.50, +A/J Ratio,0.55,0.42,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.45, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,264.00","1,153.50",110.50,0.00,0.00,0.00,0.00,0.00,82.50,"1,181.50", +"Chandler Architectural Products, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +GLAZIER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +Total for Contractor,Journey,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,80.00 +"",Apprentice,32.00,0.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",A/J Ratio,0.40,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.40 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,112.00,80.00,0.00,32.00,0.00,0.00,0.00,0.00,0.00,112.00 +"Cherry Hill Glass Co., Inc.",,,,,,,,,,, +"GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)",Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +IRONWORKER/WELDER,Journey,267.00,267.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,267.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,267.00,267.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,267.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,339.00,339.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,339.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,339.00,339.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,339.00 +Clifford & Galvin Contracting,,,,,,,,,,, +CARPENTER,Journey,"1,755.00","1,755.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,755.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,755.00","1,755.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,755.00" +LABORER,Journey,196.00,196.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,196.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,196.00,196.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,196.00 +Total for Contractor,Journey,"1,951.00","1,951.00",0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,951.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,951.00","1,951.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,951.00" +"Dandis Contracting, Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00,0.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,96.00,96.00,0.00,0.00,0.00,0.00,0.00,0.00,96.00,0.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"PAINTER / TAPER (BRUSH, NEW)",Journey,325.00,192.00,0.00,61.00,72.00,0.00,0.00,0.00,8.00,317.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,325.00,192.00,0.00,61.00,72.00,0.00,0.00,0.00,8.00,317.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",421.00,"288.00 0.0061.0072.000.000.00","0.00104.00 317.00",,,,,,,, +"",,,,,,,,,,104.00,317.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,421.00,288.00,0.00,61.00,72.00,0.00,0.00,0.00,104.00,317.00 +Delta Beckwith Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,224.50,224.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,224.50,224.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,224.50 +ELEVATOR CONSTRUCTOR HELPER,Journey,154.25,154.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.25 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,154.25,154.25,0.00,0.00,0.00,0.00,0.00,0.00,0.00,154.25, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",378.75,"378.75 0.000.000.000.000.00","0.000.00 378.75",,,,,,,, +"",,,,,,,,,0.00,378.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,378.75,378.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,378.75, +Dimeo Construction Company,,,,,,,,,,, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,201.00,201.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,201.00 +LABORER,Journey,"1,273.00","1,273.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,273.00" +"",Apprentice,227.00,0.00,0.00,227.00,0.00,0.00,0.00,0.00,227.00,0.00 +"",A/J Ratio,0.18,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,500.00","1,273.00",0.00,227.00,0.00,0.00,0.00,0.00,227.00,"1,273.00" +Total for Contractor,Journey,"1,474.00","1,474.00",0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,474.00" +"",Apprentice,227.00,0.00,0.00,227.00,0.00,0.00,0.00,0.00,227.00,0.00 +"",A/J Ratio,0.15,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,701.00","1,474.00",0.00,227.00,0.00,0.00,0.00,0.00,227.00,"1,474.00" +"Dow Company, Inc., The",,,,,,,,,,, +EQUIPMENT OPERATOR (Class A CDL),Journey,271.50,271.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,271.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,271.50,271.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,271.50 +LABORER,Journey,283.00,283.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,283.00 +Apprentice,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00,0.00, +A/J Ratio,0.37,0.37,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,387.00,387.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00,283.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,554.50,554.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,554.50 +"",Apprentice,104.00,104.00,0.00,0.00,0.00,0.00,0.00,0.00,104.00,0.00 +"",A/J Ratio,0.19,0.19,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,658.50,658.50,0.00,0.00,0.00,0.00,0.00,0.00,104.00,554.50 +"E. Amanti & Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +PLUMBERS & GASFITTERS,Journey,316.00,268.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,316.00 +"",Apprentice,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",A/J Ratio,0.47,0.55,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.47 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,464.00,416.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,464.00 +Total for Contractor,Journey,324.00,276.00,48.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,324.00 +"",Apprentice,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +"",A/J Ratio,0.46,0.54,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.46 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,472.00,424.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,472.00 +"ELAD Insustrial Insulation, Inc.",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,120.00,112.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,120.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,120.00,112.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,120.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,120.00,112.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,120.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,120.00,112.00,0.00,0.00,8.00,0.00,0.00,0.00,0.00,120.00 +Emanouil Landscaping,,,,,,,,,,, +LABORER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,112.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"176.00 0.000.000.000.000.00","0.0064.00 112.00",,,,,,,, +"",,,,,,,,,,64.00,112.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,64.00,112.00 +Empire Masonry Corporation,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00 +LABORER: MASON TENDER,Journey,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,128.00,128.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,128.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,315.00,315.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,315.00,315.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,315.00 +ESCS INC,,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.00,"32.00 0.000.000.000.000.00","0.000.00 32.00",,,,,,,, +"",,,,,,,,,,0.00,32.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,32.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.00 +"Feeley, McAnespie",,,,,,,,,,, +ROOFER,Journey,74.50,69.50,0.00,5.00,0.00,0.00,0.00,0.00,0.00,74.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,74.50,69.50,0.00,5.00,0.00,0.00,0.00,0.00,0.00,74.50 +SHEETMETAL WORKER,Journey,5.50,0.00,5.50,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +Apprentice,5.50,0.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,5.50, +A/J Ratio,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,11.00,0.00,5.50,0.00,5.50,0.00,0.00,0.00,0.00,11.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,80.00,69.50,5.50,5.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",Apprentice,5.50,0.00,0.00,0.00,5.50,0.00,0.00,0.00,0.00,5.50 +"",A/J Ratio,0.07,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.07 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,85.50,69.50,5.50,5.00,5.50,0.00,0.00,0.00,0.00,85.50 +First Choice Finishes,,,,,,,,,,, +"PAINTER / TAPER (BRUSH, NEW)",Journey,587.00,483.00,8.00,96.00,0.00,0.00,0.00,0.00,0.00,587.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,587.00,483.00,8.00,96.00,0.00,0.00,0.00,0.00,0.00,587.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",587.00,"483.00 8.0096.000.000.000.00","0.000.00 587.00",,,,,,,, +"",,,,,,,,,0.00,587.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,587.00,483.00,8.00,96.00,0.00,0.00,0.00,0.00,0.00,587.00 +Front Line Inc,,,,,,,,,,, +LABORER,Journey,176.00,112.00,16.00,48.00,0.00,0.00,0.00,0.00,48.00,128.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,176.00,112.00,16.00,48.00,0.00,0.00,0.00,0.00,48.00,128.00 +Total for Contractor,Journey,176.00,112.00,16.00,48.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,48.00,128.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,176.00,112.00,16.00,48.00,0.00,0.00,0.00,0.00,48.00,128.00, +"Hampshire Fire Protection Company, LLC",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +FIRE ALARM INSTALLER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +LABORER,Journey,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,20.00,20.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,20.00 +SPRINKLER FITTER,Journey,200.00,200.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,200.00 +"",Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",A/J Ratio,0.96,0.96,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.96 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,392.00,392.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,392.00 +Total for Contractor,Journey,240.00,240.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,240.00 +"",Apprentice,192.00,192.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,192.00 +"",A/J Ratio,0.80,0.80,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.80 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,432.00,432.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,432.00 +"Interstate Insulation, LLC",,,,,,,,,,, +INSULATOR (PIPES & TANKS),Journey,10.00,5.00,0.00,0.00,0.00,0.00,5.00,0.00,0.00,10.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,10.00,5.00,0.00,0.00,0.00,0.00,5.00,0.00,0.00,10.00, +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,10.00,5.00,0.00,0.00,0.00,0.00,5.00,0.00,0.00,10.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,10.00,5.00,0.00,0.00,0.00,0.00,5.00,0.00,0.00,10.00 +J.Thibert Architectural Woodwork Installation,,,,,,,,,,, +CARPENTER,Journey,856.00,720.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,856.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,856.00,720.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,856.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",856.00,"720.00 0.00136.000.000.000.00","0.000.00 856.00",,,,,,,, +"",,,,,,,,,0.00,856.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,856.00,720.00,0.00,136.00,0.00,0.00,0.00,0.00,0.00,856.00 +Longden Company,,,,,,,,,,, +CARPENTER,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00 +"",A/J Ratio,1.11,1.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.11 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +Total for Contractor,Journey,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,72.00,, +Apprentice,80.00,80.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,80.00, +A/J Ratio,1.11,1.11,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.11, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00, +"Lymo Construction Co., Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,176.00,176.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,176.00 +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.41,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",176.00,"176.00 0.000.000.000.000.00","0.000.00 176.00",,,,,,,, +"",,,,,,,,,0.00,176.00, +"",Apprentice,72.00,72.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,72.00 +"",A/J Ratio,0.41,0.41,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.41 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,248.00,248.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,248.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,420.00,268.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,420.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,420.00,268.00,0.00,152.00,0.00,0.00,0.00,0.00,0.00,420.00 +CEMENT MASONRY/PLASTERING,Journey,296.00,288.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,296.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,296.00,288.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,296.00 +HOISTING ENGINEER/CRANES/GRADALLS,Journey,11.50,11.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,11.50,11.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,11.50 +LABORER,Journey,677.00,589.00,16.00,64.00,0.00,0.00,8.00,0.00,0.00,677.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,677.00,589.00,16.00,64.00,0.00,0.00,8.00,0.00,0.00,677.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PUMP OPERATOR (CONCRETE),Journey,47.50,47.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,47.50,47.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,47.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal","1,452.00","1,204.00 16.00224.000.000.008.00","0.000.00 1,452.00",,,,,,,, +"",,,,,,,,,,0.00,"1,452.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,452.00","1,204.00",16.00,224.00,0.00,0.00,8.00,0.00,0.00,"1,452.00" +New Tech Installation,,,,,,,,,,, +CARPENTER,Journey,"1,072.00","1,024.00",0.00,0.00,0.00,48.00,0.00,0.00,0.00,"1,072.00" +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.04,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,112.00","1,064.00",0.00,0.00,0.00,48.00,0.00,0.00,0.00,"1,112.00" +Total for Contractor,Journey,"1,072.00","1,024.00",0.00,0.00,0.00,48.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,072.00" +"",Apprentice,40.00,40.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,40.00 +"",A/J Ratio,0.04,0.04,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.04 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,112.00","1,064.00",0.00,0.00,0.00,48.00,0.00,0.00,0.00,"1,112.00" +Patrick J. Kennedy & Sons,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,172.00,148.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,172.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,172.00,148.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,172.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",172.00,"148.00 0.0024.000.000.000.00","0.000.00 172.00",,,,,,,, +"",,,,,,,,,,0.00,172.00 +"",Apprentice,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",A/J Ratio,0.14,0.16,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.14 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,196.00,172.00,0.00,24.00,0.00,0.00,0.00,0.00,0.00,196.00 +Pro Cut Inc.,,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Total for Contractor,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"RicMor Construction, Inc.",,,,,,,,,,, +CEMENT MASONRY/PLASTERING,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,8.00,0.00,8.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.50,1.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,16.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",24.00,"16.00 0.008.000.000.000.00","0.000.00 24.00",,,,,,,, +"",,,,,,,,,,0.00,24.00 +"",Apprentice,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00,0.00 +"",A/J Ratio,0.33,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.00,24.00,0.00,8.00,0.00,0.00,0.00,0.00,8.00,24.00 +"Safway Services LLC, Inc.",,,,,,,,,,, +MECHANICS MAINTENANCE,Journey,221.00,221.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,221.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,221.00,221.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,221.00 +Total for Contractor,Journey,221.00,221.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,221.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,221.00,221.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,221.00 +"Tavares, LLC",,,,,,,,,,, +CARPENTER,Journey,316.00,180.00,8.00,128.00,0.00,0.00,0.00,0.00,0.00,316.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,316.00,180.00,8.00,128.00,0.00,0.00,0.00,0.00,0.00,316.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,16.00,0.00,0.00,16.00,0.00,0.00,0.00,0.00,0.00,16.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",332.00,"180.00 8.00144.000.000.000.00","0.000.00 332.00",,,,,,,, +"",,,,,,,,,,0.00,332.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,332.00,180.00,8.00,144.00,0.00,0.00,0.00,0.00,0.00,332.00 +V&G Iron Works Corporation,,,,,,,,,,, +IRONWORKER/WELDER,Journey,313.00,277.00,28.00,0.00,0.00,0.00,8.00,0.00,7.50,305.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,313.00,277.00,28.00,0.00,0.00,0.00,8.00,0.00,7.50,305.50 +Total for Contractor,Journey,313.00,277.00,28.00,0.00,0.00,0.00,8.00,0.00,, +"",,,,,,,,,,7.50,305.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,313.00,277.00,28.00,0.00,0.00,0.00,8.00,0.00,7.50,305.50 +"Valley Communications Systems, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,16.00,135.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,16.00,135.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,16.00,135.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,151.50,151.50,0.00,0.00,0.00,0.00,0.00,0.00,16.00,135.50 +ver-tex construction specialties,,,,,,,,,,, +CARPENTER,Journey,32.75,32.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.75,32.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.75 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",32.75,"32.75 0.000.000.000.000.00","0.000.00 32.75",,,,,,,, +"",,,,,,,,,,0.00,32.75 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,32.75,32.75,0.00,0.00,0.00,0.00,0.00,0.00,0.00,32.75 +"Wayne J. Griffin Electric, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,"2,271.00","2,025.00",0.00,246.00,0.00,0.00,0.00,0.00,0.00,"2,271.00" +"",Apprentice,"1,085.25",644.75,0.00,440.50,0.00,0.00,0.00,0.00,199.00,886.25 +"",A/J Ratio,0.48,0.32,0.00,1.79,0.00,0.00,0.00,0.00,0.00,0.39 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"3,356.25","2,669.75",0.00,686.50,0.00,0.00,0.00,0.00,199.00,"3,157.25" +TELECOMMUNICATION TECHNICIAN,Journey,903.00,605.50,0.00,119.50,178.00,0.00,0.00,0.00,0.00,903.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,903.00,605.50,0.00,119.50,178.00,0.00,0.00,0.00,0.00,903.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"3,174.00","2,630.50",0.00,365.50,178.00,0.00,0.00,0.00,0.00,"3,174.00" +"",Apprentice,"1,085.25",644.75,0.00,440.50,0.00,0.00,0.00,0.00,199.00,886.25 +"",A/J Ratio,0.34,0.25,0.00,1.21,0.00,0.00,0.00,0.00,0.00,0.28 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"4,259.25","3,275.25",0.00,806.00,178.00,0.00,0.00,0.00,199.00,"4,060.25" +"West Floor Covering, Inc.",,,,,,,,,,, +FLOORCOVERER,Journey,55.50,55.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,55.50 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.29,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.29 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,71.50,71.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,71.50 +LABORER,Journey,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,24.00,24.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,24.00 +MARBLE & TILE FINISHERS,Journey,610.00,450.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,610.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,610.00,450.00,0.00,160.00,0.00,0.00,0.00,0.00,0.00,610.00 +"MARBLE MASONS, TILELAYERS & TERRAZZO MECH",Journey,"1,034.50",578.50,0.00,456.00,0.00,0.00,0.00,0.00,0.00,"1,034.50" +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,"1,034.50",578.50,0.00,456.00,0.00,0.00,0.00,0.00,0.00,"1,034.50", +"Project Name: TRC0105 DC1 C Lowell Trial Court Project Code: TRC0105 DC1",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,"1,724.00","1,108.00",0.00,616.00,0.00,0.00,0.00,0.00,0.00,"1,724.00" +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.01,0.01,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.01 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,740.00","1,124.00",0.00,616.00,0.00,0.00,0.00,0.00,0.00,"1,740.00" +"Worcester Air Conditioning, LLC",,,,,,,,,,, +SHEETMETAL WORKER,Journey,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",148.00,"148.00 0.000.000.000.000.00","0.000.00 148.00",,,,,,,, +"",,,,,,,,0.00,148.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,148.00,148.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,148.00, +Total Journey Hours,"18,724.50","16,540.50",129.50,"1,727.50",258.00,48.00,21.00,0.00,239.50,"18,485.00", +Total Apprentice Hours,"2,768.75","1,953.25",110.50,699.50,5.50,0.00,0.00,0.00,778.50,"1,990.25", +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"21,493.25","18,493.75",240.00,"2,427.00",263.50,48.00,21.00,0.00,"1,018.00","20,475.25", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Costa Brothers Masonry, Inc.",,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,679.00,534.00,0.00,145.00,0.00,0.00,0.00,0.00,0.00,679.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,679.00,534.00,0.00,145.00,0.00,0.00,0.00,0.00,0.00,679.00 +LABORER,Journey,169.00,169.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,169.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,169.00,169.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,169.00 +Total for Contractor,Journey,848.00,703.00,0.00,145.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,848.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,848.00,703.00,0.00,145.00,0.00,0.00,0.00,0.00,0.00,848.00 +Crocker Architectural Sheet Metal,,,,,,,,,,, +ROOFER,Journey,327.50,327.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,327.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,327.50,327.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,327.50 +SHEETMETAL WORKER,Journey,234.50,234.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,234.50,234.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,234.50, +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,562.00,562.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,562.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,562.00,562.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,562.00 +"JRJ Corporation Co., Inc.",,,,,,,,,,, +LABORER: MULTI-TRADE TENDER,Journey,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",8.00,"8.00 0.000.000.000.000.00","0.000.00 8.00",,,,,,,, +"",,,,,,,,,0.00,8.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,8.00,8.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,8.00 +"Marguerite Concrete, Inc.",,,,,,,,,,, +CARPENTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Total for Contractor,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,2.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00, +"North Shore Steel Company, Inc",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +IRONWORKER/WELDER,Journey,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,0.00,0.00,3.00,0.00,0.00,0.00,0.00,0.00,3.00 +LABORER,Journey,3.00,0.00,0.00,0.00,0.00,0.00,3.00,0.00,0.00,3.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,3.00,0.00,0.00,0.00,0.00,0.00,3.00,0.00,0.00,3.00 +Total for Contractor,Journey,6.00,0.00,0.00,3.00,0.00,0.00,3.00,0.00,, +"",,,,,,,,,,0.00,6.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,6.00,0.00,0.00,3.00,0.00,0.00,3.00,0.00,0.00,6.00 +"P.J. Dionne Company, Inc.",,,,,,,,,,, +PLUMBERS & GASFITTERS,Journey,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",13.00,"13.00 0.000.000.000.000.00","0.000.00 13.00",,,,,,,, +"",,,,,,,,,0.00,13.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,13.00,13.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.00, +TRAC Builders Inc.,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +CARPENTER,Journey,444.50,292.50,0.00,0.00,0.00,0.00,152.00,0.00,0.00,444.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,444.50,292.50,0.00,0.00,0.00,0.00,152.00,0.00,0.00,444.50 +LABORER,Journey,147.50,0.00,0.00,147.50,0.00,0.00,0.00,0.00,0.00,147.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,147.50,0.00,0.00,147.50,0.00,0.00,0.00,0.00,0.00,147.50 +Total for Contractor,Journey,592.00,292.50,0.00,147.50,0.00,0.00,152.00,0.00,, +"",,,,,,,,,,0.00,592.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,592.00,292.50,0.00,147.50,0.00,0.00,152.00,0.00,0.00,592.00 +"Tradesmen International Holdings, LLC",,,,,,,,,,, +CARPENTER,Journey,146.75,15.75,0.00,0.00,131.00,0.00,0.00,0.00,0.00,146.75 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.75,15.75,0.00,0.00,131.00,0.00,0.00,0.00,0.00,146.75, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",146.75,"15.75 0.000.00131.000.000.00","0.000.00 146.75",,,,,,,, +"",,,,,,,,,0.00,146.75, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,146.75,15.75,0.00,0.00,131.00,0.00,0.00,0.00,0.00,146.75, +Veterans Scaffold,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1203 FC1 C Brighton Municipal Court Building Envelope Improvements Project Code: TRC1203 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +LABORER,Journey,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",93.00,"93.00 0.000.000.000.000.00","0.000.00 93.00",,,,,,,, +"",,,,,,,,,0.00,93.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.00,93.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,93.00 +Yard Works Inc.,,,,,,,,,,, +LABORER,Journey,104.00,6.50,0.00,97.50,0.00,0.00,0.00,0.00,0.00,104.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,104.00,6.50,0.00,97.50,0.00,0.00,0.00,0.00,0.00,104.00 +Total for Contractor,Journey,104.00,6.50,0.00,97.50,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,104.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,104.00,6.50,0.00,97.50,0.00,0.00,0.00,0.00,0.00,104.00, +Total Journey Hours,"2,374.75","1,695.75",0.00,393.00,131.00,0.00,155.00,0.00,0.00,"2,374.75", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,374.75","1,695.75",0.00,393.00,131.00,0.00,155.00,0.00,0.00,"2,374.75", +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Astro Crane Service,,,,,,,,,,, +HOISTING ENGINEER/CRANES/GRADALLS,Journey,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,4.00,4.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,4.00 +LABORER,Journey,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,1.50,1.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,1.50 +Total for Contractor,Journey,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,5.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,5.50,5.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,5.50 +Bonner Sheet Metal Corp.,,,,,,,,,,, +SHEETMETAL WORKER,Journey,187.00,187.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,187.00 +Apprentice,130.50,18.50,0.00,112.00,0.00,0.00,0.00,0.00,0.00,130.50, +A/J Ratio,0.70,0.10,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.70, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,317.50,205.50,0.00,112.00,0.00,0.00,0.00,0.00,0.00,317.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",187.00,"187.00 0.000.000.000.000.00","0.000.00 187.00",,,,,,,, +"",,,,,,,,,0.00,187.00, +Apprentice,130.50,18.50,0.00,112.00,0.00,0.00,0.00,0.00,0.00,130.50, +A/J Ratio,0.70,0.10,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.70, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,317.50,205.50,0.00,112.00,0.00,0.00,0.00,0.00,0.00,317.50, +"Carlysle Engineering, Inc.",,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +SPRINKLER FITTER,Journey,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",2.00,"2.00 0.000.000.000.000.00","0.000.00 2.00",,,,,,,, +"",,,,,,,,,,0.00,2.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,2.00,2.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,2.00 +Chapman Waterproofing Company,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,389.00,389.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,389.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,389.00,389.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,389.00 +LABORER,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",423.00,"423.00 0.000.000.000.000.00","0.000.00 423.00",,,,,,,, +"",,,,,,,,,0.00,423.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,423.00,423.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,423.00, +"Conserve Thru Control, Inc.",,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +HVAC (ELECTRICAL CONTROLS),Journey,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",115.50,"115.50 0.000.000.000.000.00","0.000.00 115.50",,,,,,,, +"",,,,,,,,,,0.00,115.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,115.50,115.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,115.50 +"Daniel O'connell's Sons, Inc",,,,,,,,,,, +CARPENTER,Journey,413.00,413.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,413.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,413.00,413.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,413.00 +LABORER,Journey,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,92.00,92.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,92.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",505.00,"505.00 0.000.000.000.000.00","0.000.00 505.00",,,,,,,, +"",,,,,,,,,0.00,505.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,505.00,505.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,505.00, +"Gomes Construction Company, Inc.",,,,,,,,,,, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +BACKHOE/FRONT-END LOADER,Journey,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,49.00,49.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,49.00 +LABORER,Journey,113.00,73.00,0.00,40.00,0.00,0.00,0.00,0.00,8.50,104.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,113.00,73.00,0.00,40.00,0.00,0.00,0.00,0.00,8.50,104.50 +Total for Contractor,Journey,162.00,122.00,0.00,40.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,8.50,153.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,162.00,122.00,0.00,40.00,0.00,0.00,0.00,0.00,8.50,153.50 +Industrial Mechanical Insulation,,,,,,,,,,, +ASBESTOS INSULATOR (PIPES & TANKS),Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Apprentice,78.50,0.00,0.00,78.50,0.00,0.00,0.00,0.00,0.00,78.50 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,78.50,0.00,0.00,78.50,0.00,0.00,0.00,0.00,0.00,78.50 +INSULATOR (PIPES & TANKS),Journey,94.50,94.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,94.50,94.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.50, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,94.50,94.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,94.50 +"",Apprentice,78.50,0.00,0.00,78.50,0.00,0.00,0.00,0.00,0.00,78.50 +"",A/J Ratio,0.83,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.83 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,173.00,94.50,0.00,78.50,0.00,0.00,0.00,0.00,0.00,173.00 +Kenney Masonry,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,36.50,36.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,36.50 +LABORER: MASON TENDER,Journey,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,13.50,13.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,13.50 +Total for Contractor,Journey,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,50.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,50.00,50.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,50.00 +KMD Mechanical,,,,,,,,,,, +PIPEFITTER,Journey,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +PIPEFITTER & STEAMFITTER,Journey,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,152.00,152.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,152.00 +PLUMBERS & GASFITTERS,Journey,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,34.00,34.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,34.00 +Total for Contractor,Journey,186.00,186.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,186.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.09,0.09,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.09 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,202.00,202.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,202.00 +"North Shore Steel Company, Inc",,,,,,,,,,, +IRONWORKER/WELDER,Journey,26.00,0.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,26.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,26.00,0.00,0.00,26.00,0.00,0.00,0.00,0.00,0.00,26.00 +LABORER,Journey,40.00,0.00,0.00,14.00,0.00,0.00,26.00,0.00,0.00,40.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,40.00,0.00,0.00,14.00,0.00,0.00,26.00,0.00,0.00,40.00, +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,66.00,0.00,0.00,40.00,0.00,0.00,26.00,0.00,0.00,66.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,66.00,0.00,0.00,40.00,0.00,0.00,26.00,0.00,0.00,66.00 +"Schneider Electric Buildings Americas, Inc.",,,,,,,,,,, +TELECOMMUNICATION TECHNICIAN,Journey,81.00,0.00,0.00,0.00,0.00,0.00,81.00,0.00,0.00,81.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.00,0.00,0.00,0.00,0.00,0.00,81.00,0.00,0.00,81.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",81.00,"0.00 0.000.000.000.0081.00","0.000.00 81.00",,,,,,,, +"",,,,,,,,,0.00,81.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,81.00,0.00,0.00,0.00,0.00,0.00,81.00,0.00,0.00,81.00 +"SMJ Metal Company, Inc.",,,,,,,,,,, +IRONWORKER/WELDER,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00 +Total for Contractor,Journey,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,0.00,48.00,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,48.00,48.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.00, +SOS Corporation,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,48.00,32.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,48.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.33,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,48.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,64.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",48.00,"32.00 0.000.000.000.0016.00","0.000.00 48.00",,,,,,,, +"",,,,,,,,,,0.00,48.00 +"",Apprentice,16.00,16.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,16.00 +"",A/J Ratio,0.33,0.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.33 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,64.00,48.00,0.00,0.00,0.00,0.00,16.00,0.00,0.00,64.00 +"Stanley Roofing Company, inc",,,,,,,,,,, +ROOFER,Journey,417.50,174.50,0.00,243.00,0.00,0.00,0.00,0.00,0.00,417.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,417.50,174.50,0.00,243.00,0.00,0.00,0.00,0.00,0.00,417.50 +Total for Contractor,Journey,417.50,174.50,0.00,243.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,417.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,417.50,174.50,0.00,243.00,0.00,0.00,0.00,0.00,0.00,417.50 +Zap Electric,,,,,,,,,,, +ELECTRICIAN,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1407 FC1 C Exterior Building Repairs and Access Modification East Brookfield District Court Project Code: TRC1407 FC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,136.00,136.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,136.00, +Total Journey Hours,"2,527.00","2,081.00",0.00,323.00,0.00,0.00,123.00,0.00,8.50,"2,518.50", +Total Apprentice Hours,241.00,50.50,0.00,190.50,0.00,0.00,0.00,0.00,0.00,241.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,768.00","2,131.50",0.00,513.50,0.00,0.00,123.00,0.00,8.50,"2,759.50", +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +3 Phase Elevator,,,,,,,,,,, +ELEVATOR CONSTRUCTOR,Journey,481.00,481.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,481.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,481.00,481.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,481.00 +ELEVATOR CONSTRUCTOR HELPER,Journey,534.00,534.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,534.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,534.00,534.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,534.00 +Total for Contractor,Journey,"1,015.00","1,015.00",0.00,0.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,"1,015.00" +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,"1,015.00","1,015.00",0.00,0.00,0.00,0.00,0.00,0.00,0.00,"1,015.00" +"Annese Electrical Services, Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,375.00,263.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,375.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,375.00,263.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,375.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",375.00,"263.00 112.000.000.000.000.00","0.000.00 375.00",,,,,,,, +"",,,,,,,,,0.00,375.00, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,375.00,263.00,112.00,0.00,0.00,0.00,0.00,0.00,0.00,375.00, +Atlantic Coast Dismantling LLC,,,,,,,,,,, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +LABORER,Journey,209.00,111.00,4.00,94.00,0.00,0.00,0.00,0.00,0.00,209.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,209.00,111.00,4.00,94.00,0.00,0.00,0.00,0.00,0.00,209.00 +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",209.00,"111.00 4.0094.000.000.000.00","0.000.00 209.00",,,,,,,, +"",,,,,,,,,,0.00,209.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,209.00,111.00,4.00,94.00,0.00,0.00,0.00,0.00,0.00,209.00 +"Enterprise Equipment Co., Inc.",,,,,,,,,,, +CARPENTER,Journey,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,85.00,85.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,85.00 +LABORER,Journey,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,110.00,110.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,110.00 +PIPEFITTER & STEAMFITTER,Journey,214.00,97.00,117.00,0.00,0.00,0.00,0.00,0.00,0.00,214.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,214.00,97.00,117.00,0.00,0.00,0.00,0.00,0.00,0.00,214.00, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: TRC1702 HC1 C Suffolk County Courthouse Elevator Modernization Project Code: TRC1702 HC1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,409.00,292.00,117.00,0.00,0.00,0.00,0.00,0.00,0.00,409.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,409.00,292.00,117.00,0.00,0.00,0.00,0.00,0.00,0.00,409.00 +"K1 Roofing, LLC",,,,,,,,,,, +ROOFER,Journey,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal",7.50,"7.50 0.000.000.000.000.00","0.000.00 7.50",,,,,,,, +"",,,,,,,,0.00,7.50,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,7.50,7.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,7.50, +Total Journey Hours,"2,015.50","1,688.50",233.00,94.00,0.00,0.00,0.00,0.00,0.00,"2,015.50", +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,"2,015.50","1,688.50",233.00,94.00,0.00,0.00,0.00,0.00,0.00,"2,015.50", +"Journey Apprentice Total for Contractor A/J Ratio New Hire Subtotal" +Apprentice +A/J Ratio +New Hire +Subtotal +"Project Name: VET1801 HC1 C Veterans' Memorial Cemetery Project Code: VET1801 HC1 C",,,,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,,,, +"","Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male", +"",,,,,,,,,,,, +"Louis C. Allegrone, Inc.",,,,,,,,,,,, +BRICK/STONE/ARTIFICIAL MASONRY,Journey,627.00,433.50,0.00,193.50,0.00,0.00,0.00,0.00,0.00,627.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,627.00,433.50,0.00,193.50,0.00,0.00,0.00,0.00,0.00,627.00, +LABORER: MASON TENDER,Journey,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00, +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +"",Subtotal,184.00,184.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,184.00, +Total for Contractor,Journey,811.00,617.50,0.00,193.50,0.00,0.00,0.00,0.00,,, +"",,,,,,,,0.00,811.00,,, +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Subtotal,811.00,617.50,0.00,193.50,0.00,0.00,0.00,0.00,0.00,811.00,, +Total Journey Hours,811.00,617.50,0.00,193.50,0.00,0.00,0.00,0.00,0.00,811.00,, +Total Apprentice Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,, +Grand Total Hours,811.00,617.50,0.00,193.50,0.00,0.00,0.00,0.00,0.00,811.00,, +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +"Collins Electric Co., Inc.",,,,,,,,,,, +ELECTRICIAN,Journey,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,48.50,48.50,0.00,0.00,0.00,0.00,0.00,0.00,0.00,48.50 +TELECOMMUNICATION TECHNICIAN,Journey,28.00,11.00,8.00,9.00,0.00,0.00,0.00,0.00,0.00,28.00 +"",Apprentice,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"",A/J Ratio,0.61,1.55,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.61 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,45.00,28.00,8.00,9.00,0.00,0.00,0.00,0.00,0.00,45.00 +Total for Contractor,Journey,76.50,59.50,8.00,9.00,0.00,0.00,0.00,0.00,, +"",,,,,,,,,,0.00,76.50 +"",Apprentice,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00 +"",A/J Ratio,0.22,0.29,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.22 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,93.50,76.50,8.00,9.00,0.00,0.00,0.00,0.00,0.00,93.50 +T & M Equipment Corporation,,,,,,,,,,, +BACKHOE/FRONT-END LOADER,Journey,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +"",Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00 +"",Subtotal,256.00,256.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,256.00 +LABORER,Journey,410.00,254.00,0.00,156.00,0.00,0.00,0.00,0.00,0.00,410.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,410.00,254.00,0.00,156.00,0.00,0.00,0.00,0.00,0.00,410.00, +"Project Name: WSC1902 DB1 C WSC-Campus-wide-Redundant Steam and Condensate Loop Project Code: WSC1902 DB1 C",,,,,,,,,, +Construction Trade,Hours Worked,,,,,,,,, +"Craft Level","Total Employee",Caucasian,"African American",Hispanic,Asian,"Native American",Other,"Not Specified","Total Female","Total Male" +Total for Contractor,Journey,666.00,510.00,0.00,156.00,0.00,0.00,0.00,0.00,0.00,666.00 +Apprentice,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +A/J Ratio,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +New Hire,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Subtotal,666.00,510.00,0.00,156.00,0.00,0.00,0.00,0.00,0.00,666.00, +Total Journey Hours,742.50,569.50,8.00,165.00,0.00,0.00,0.00,0.00,0.00,742.50, +Total Apprentice Hours,17.00,17.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,17.00, +Total New Hire Hours,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00,0.00, +Grand Total Hours,759.50,586.50,8.00,165.00,0.00,0.00,0.00,0.00,0.00,759.50, diff --git a/WGBH-DCAMM/docs/Project Deliverable 0.pdf b/WGBH-DCAMM/docs/WGBH Project Deliverable 0.pdf similarity index 100% rename from WGBH-DCAMM/docs/Project Deliverable 0.pdf rename to WGBH-DCAMM/docs/WGBH Project Deliverable 0.pdf diff --git a/WGBH-DCAMM/docs/WGBH_Project_Deliverable_1.pdf b/WGBH-DCAMM/docs/WGBH_Project_Deliverable_1.pdf new file mode 100644 index 00000000..d2a876b3 Binary files /dev/null and b/WGBH-DCAMM/docs/WGBH_Project_Deliverable_1.pdf differ diff --git a/WGBH-DCAMM/docs/project_description.md b/WGBH-DCAMM/docs/WGBH_Project_Description.md similarity index 100% rename from WGBH-DCAMM/docs/project_description.md rename to WGBH-DCAMM/docs/WGBH_Project_Description.md diff --git a/WGBH-DCAMM/scrum/2.25.21_WGBH_SCRUM_0.pdf b/WGBH-DCAMM/scrum/2.25.21_WGBH_SCRUM_0.pdf deleted file mode 100644 index 0ac49c65..00000000 Binary files a/WGBH-DCAMM/scrum/2.25.21_WGBH_SCRUM_0.pdf and /dev/null differ diff --git a/WGBH-DCAMM/scrum/WGBH - DCAMM SCRUM Report 0.pdf b/WGBH-DCAMM/scrum/WGBH - DCAMM SCRUM Report 0.pdf new file mode 100644 index 00000000..5faa6ef0 Binary files /dev/null and b/WGBH-DCAMM/scrum/WGBH - DCAMM SCRUM Report 0.pdf differ diff --git a/WGBH-DCAMM/src/parsers/DataSheet.py b/WGBH-DCAMM/src/parsers/DataSheet.py new file mode 100644 index 00000000..596e9ccf --- /dev/null +++ b/WGBH-DCAMM/src/parsers/DataSheet.py @@ -0,0 +1,320 @@ +import os +import sys +import traceback +import unicodedata +from pathlib import Path +from typing import Dict, List, Set + +import PyPDF3 +from tqdm import tqdm +import requests +from PyPDF3.pdf import PageObject +import pdfplumber + + +def join(to_join, separator=' '): + return separator.join(map(str, to_join)) + + +class DataSheetNode: + + def __init__(self, name: str, path: List[int]) -> None: + """ + Constructor of DataSheetNode class. + Args: + name: Name of node. + path: TOC path. + """ + self.path = path + self.name = name + self.childs = [] # type: List[DataSheetNode] + self.parent = None # type: DataSheetNode + self._page = None # type: PageObject + self._page_plumber = None # type: pdfplumber.pdf.Page + + @property + def page(self): + return self._page_plumber + + def __repr__(self): + return '<{} {}-"{}">'.format(self.__class__.__name__, join(self.path, '.'), self.name) + + def get_node_by_path(self, path, prev_node: 'DataSheetNode' = None) -> 'DataSheetNode': + """Finds node by it's TOC path. + Args: + path: node TOC path. + prev_node: previous node, used for recursive iteration. + Returns: + None or DataSheetNode. + """ + ret_node: 'DataSheetNode' = None + if not prev_node: + prev_node = self.get_root_node() + if prev_node.path == path: + return prev_node + else: + for child in prev_node.childs: + ret_node = self.get_node_by_path(path, child) + if ret_node: + return ret_node + return ret_node + + def get_node_by_name(self, name, prev_node: 'DataSheetNode' = None) -> 'DataSheetNode': + """Finds node by it's TOC path. + Args: + name: node name. + prev_node: previous node, used for recursive iteration. + Returns: + None or DataSheetNode. + """ + ret_node: 'DataSheetNode' = None + if not prev_node: + prev_node = self.get_root_node() + if name in prev_node.name: + return prev_node + else: + for child in prev_node.childs: + ret_node = self.get_node_by_name(name, child) + if ret_node: + return ret_node + return ret_node + + def get_node_by_type(self, node_type, prev_node: 'DataSheetNode' = None) -> 'DataSheetNode': + """Finds node by type. + Args: + node_type: node type. + prev_node: previous node, used for recursive iteration. + Returns: + None or DataSheetNode. + """ + ret_node: 'DataSheetNode' = None + if not prev_node: + prev_node = self.get_root_node() + if prev_node.__class__ == node_type: + return prev_node + else: + for child in prev_node.childs: + ret_node = self.get_node_by_type(node_type, child) + if ret_node: + return ret_node + return ret_node + + def get_root_node(self, prev_node: 'DataSheetNode' = None) -> 'DataSheetNode': + """Finds root node. + Args: + prev_node: previous node, used for recursive iteration. + Returns: + None or DataSheetNode. + """ + if not prev_node: + prev_node = self + if prev_node.parent: + return self.get_root_node(prev_node.parent) + else: + return prev_node + + def flatout(self, prev_node: 'DataSheetNode' = None) -> List['DataSheetNode']: + """Flats whole node tree to 1D array. + Args: + prev_node: previous node, used for recursive iteration. + Returns: + List[DataSheetNode] + """ + if not prev_node: + prev_node = self.get_root_node() + out = [] + for child in prev_node.childs: + out.append(child) + if child.childs: + out.extend(child.flatout(child)) + return out + + def to_set(self) -> Set[str]: + """Returns set with all node names in current node tree. + Returns: + Set[DataSheetNode] + """ + flat_nodes = self.flatout() # type: List[DataSheetNode] + return set([node.name for node in flat_nodes]) + + def child_diff(self, other: 'DataSheetNode'): + nodes = set(self.childs) + nodes2 = set(other.childs) + diff = nodes.symmetric_difference(nodes2) + return diff + + def append(self, node: 'DataSheetNode'): + self.childs.append(node) + node.parent = self + + def new(self, name, path): + node = DataSheetNode(name, path) + self.append(node) + return self + + def print_tree(self, depth=0, prev_indent="", last=False): + """Prints current element and it's childs""" + indent = "" + if depth: + indent = prev_indent + ("├" if not last else "└") + "─" * depth * 2 + # print(indent,self,sep="") + print(indent, self, sep="") + if depth: + indent = prev_indent + "│" + "\t" * depth + if last: + indent = prev_indent + " " + "\t" * depth + + if self.childs: + for elem in self.childs: + elem.print_tree(1, indent, elem == self.childs[-1]) + + +class DataSheetTableNode(DataSheetNode): + + def __init__(self, name: str, path: List[int], table_number, page) -> None: + super().__init__(name, path) + self.path.append(table_number) + self.table_number = table_number + self._page = page + + def get_table_name(self): + return self.name + + def get_data(self): + return self._page.getObject()['/Contents'].getData().decode('cp1251') + + @property + def page(self): + if type(self._page) is not PageObject: + return self._page.page.getObject() + else: + return self._page + + @property + def table_name(self): + return self.get_table_name() + + +class DataSheet: + + def __init__(self, datasheet_path): + self.path = Path(datasheet_path) + self.pdf_file = PyPDF3.PdfFileReader(self.path.open('rb')) + self.plumber = pdfplumber.load(self.path.open('rb')) + self.raw_outline = [] + self.tables, self.figures = {}, {} # type: Dict + self.table_of_content = DataSheetNode('ROOT', [0]) + self.table_root = DataSheetNode('TABLES', [-1]) + self.table_of_content.append(self.table_root) + self.fallback_table: DataSheetTableNode = None + self.flatten_outline() + self.sort_raw_outline() + self.collect_tables() + + def collect_tables(self): + if len(self.tables) == 0: + # print('NO TABLES WERE DETECTED IN OUTLINE! FALLING BACK TO PAGE SCANNING!') + start_page = 0 + end_page = 0 + for thing in self.raw_outline: + if 'Description' in thing['/Title']: + start_page = self.get_page_num(thing.page.getObject()) + if 'Functional' in thing['/Title']: + end_page = self.get_page_num(thing.page.getObject()) + break + for page_num in range(start_page, end_page): + page = self.pdf_file.getPage(page_num) # type: PyPDF3.pdf.PageObject + text = page.extractText() + if 'features and peripheral' in text: + table = DataSheetTableNode('Table 2. STM32F423xH features and peripheral counts', [0, 9999], 9999, + page) + self.fallback_table = table + break + pass + + def flatten_outline(self, line=None): + if line is None: + line = self.pdf_file.getOutlines() + for i in line: + if isinstance(i, list): + self.flatten_outline(i) + else: + self.raw_outline.append(i) + + def sort_raw_outline(self): + top_level_node = None + for entry in self.raw_outline: + if entry['/Type'] == '/XYZ': + name = entry['/Title'] + name = unicodedata.normalize('NFKD', name).encode('ascii', 'ignore').decode('ascii') + if 'Table' in name: + try: + table_id = int(name.split('.')[0].split(' ')[-1]) + table = DataSheetTableNode(name, [0, table_id], table_id, entry) + self.table_root.append(table) + if top_level_node: + table.path = top_level_node.path + [table_id] + top_level_node.append(table) + self.tables[table_id] = {'name': name, 'data': entry} + except Exception as ex: + pass + else: + tmp = name.split(' ') # type: List[str] + + if '.' in tmp[0]: + try: + order = list(map(int, tmp[0].split('.'))) + except ValueError: + continue + + node = DataSheetNode(join(tmp[1:]), order) + node._page = entry.page.getObject() + node._page_plumber = self.plumber.pages[self.get_page_num(entry.page.getObject())] + node.parent = self.table_of_content + parent = node.get_node_by_path(order[:-1]) + parent.append(node) + else: + if tmp[0].isnumeric(): + node = DataSheetNode(join(tmp[1:]), [int(tmp[0])]) + node._page = entry.page.getObject() + node._page_plumber = self.plumber.pages[self.get_page_num(entry.page.getObject())] + self.table_of_content.append(node) + # pos = self.recursive_create_toc([int(tmp[0])]) + # pos['name'] = ' '.join(tmp[1:]) + else: + node = DataSheetNode(name, [1]) + node._page = entry.page.getObject() + node._page_plumber = self.plumber.pages[self.get_page_num(entry.page.getObject())] + self.table_of_content.append(node) + top_level_node = node + + else: + pass + + def get_page_num(self, page): + # return self.pdf_file.getPageNumber(page) + for n, pdf_page in enumerate(self.pdf_file.pages): + if pdf_page.raw_get('/Contents') == page.raw_get('/Contents'): + return n + return -1 + + +if __name__ == '__main__': + if len(sys.argv) < 1: + print('Usage: {} DATASHEET.pdj DATASHEET2.pdf'.format(os.path.basename(sys.argv[0]))) + exit(0) + # a = DataSheet(r"D:\PYTHON\py_pdf_stm\datasheets\stm32f\stm32f777vi.pdf") + a = DataSheet(r"D:\PYTHON\py_pdf_stm\datasheets\CC\cc1312r.pdf") + # b.table_of_content.print_tree() + # a.table_of_content.print_tree() + table = a.table_root.childs[1] if a.table_root.childs else a.fallback_table + print(table) + # print(table) + # print(a.get_page_num(table.page)) + # a.get_difference(b) + # a.table_of_content.print_tree() + # print(a.table_of_content.get_node_by_type(DataSheetTableNode)) + # print(a.table_of_content.to_set()) + # print('Total letter count:', sum([len(page) for page in a.text.values()])) + # with open('test.json', 'w') as fp: + # json.dump(a.text, fp, indent=1) \ No newline at end of file diff --git a/WGBH-DCAMM/src/parsers/Untitled.ipynb b/WGBH-DCAMM/src/parsers/Untitled.ipynb new file mode 100644 index 00000000..ee0560f2 --- /dev/null +++ b/WGBH-DCAMM/src/parsers/Untitled.ipynb @@ -0,0 +1,851 @@ +{ + "cells": [ + { + "cell_type": "code", + "execution_count": 1, + "id": "automotive-clearance", + "metadata": {}, + "outputs": [ + { + "name": "stdout", + "output_type": "stream", + "text": [ + "Parsing page 16\n", + "Rendering page\n", + "Finding tables\n", + "Found 3 tables\n" + ] + }, + { + "name": "stderr", + "output_type": "stream", + "text": [ + "Parsing cells: 100%|██████████| 11/11 [00:00<00:00, 16518.92cells/s]\n", + "Filtering lines: 100%|██████████| 36/36 [00:00<00:00, 207126.12lines/s]\n", + "Building table skeleton: 100%|██████████| 11/11 [00:00<00:00, 2434.69lines/s]\n", + "Building skeleton cells: 100%|██████████| 33/33 [00:00<00:00, 13551.21point/s]\n", + "Analyzing cell positions: 100%|██████████| 20/20 [00:00<00:00, 61320.23cells/s]\n", + "Analyzing cells: 100%|██████████| 11/11 [00:00<00:00, 1047.65cells/s]\n" + ] + }, + { + "name": "stdout", + "output_type": "stream", + "text": [ + "Saving rendered table\n" + ] + }, + { + "name": "stderr", + "output_type": "stream", + "text": [ + "Parsing cells: 100%|██████████| 169/169 [00:00<00:00, 47968.96cells/s]\n", + "Filtering lines: 100%|██████████| 370/370 [00:00<00:00, 113850.23lines/s]\n", + "Building table skeleton: 100%|██████████| 13/13 [00:00<00:00, 151.60lines/s]\n", + "Building skeleton cells: 100%|██████████| 221/221 [00:00<00:00, 2026.87point/s]\n", + "Analyzing cell positions: 100%|██████████| 192/192 [00:00<00:00, 14953.23cells/s]\n", + "Analyzing cells: 100%|██████████| 169/169 [00:00<00:00, 1036.30cells/s]\n" + ] + }, + { + "name": "stdout", + "output_type": "stream", + "text": [ + "Saving rendered table\n" + ] + }, + { + "name": "stderr", + "output_type": "stream", + "text": [ + "Parsing cells: 100%|██████████| 113/113 [00:00<00:00, 49191.11cells/s]\n", + "Filtering lines: 100%|██████████| 264/264 [00:00<00:00, 170984.60lines/s]\n", + "Building table skeleton: 100%|██████████| 13/13 [00:00<00:00, 278.39lines/s]\n", + "Building skeleton cells: 100%|██████████| 156/156 [00:00<00:00, 2717.30point/s]\n", + "Analyzing cell positions: 100%|██████████| 132/132 [00:00<00:00, 20510.04cells/s]\n", + "Analyzing cells: 100%|██████████| 113/113 [00:00<00:00, 952.47cells/s]\n" + ] + }, + { + "name": "stdout", + "output_type": "stream", + "text": [ + "Saving rendered table\n", + "[<__main__.Table object at 0x7fdf2f382f40>, <__main__.Table object at 0x7fdf31a679a0>, <__main__.Table object at 0x7fdf2f390280>]\n" + ] + } + ], + "source": [ + "# import tabula\n", + "# pdf_path = \"/Users/richardlee/Downloads/WorkforceUtilizationSummaryReportApril2019.pdf\"\n", + "\n", + "# dfs = tabula.read_pdf(pdf_path, pages = 1)\n", + "# tabula.convert_into(pdf_path, \"out_put.csv\", output_format= \"csv\", pages='all')\n", + "\n", + "import math\n", + "from operator import itemgetter\n", + "\n", + "import pdfplumber\n", + "from PIL import ImageDraw, ImageFont, Image\n", + "from pdfplumber.table import TableFinder\n", + "\n", + "from DataSheet import *\n", + "\n", + "\n", + "def almost_equals(num1, num2, precision=5.0):\n", + " return abs(num1 - num2) < precision\n", + "\n", + "\n", + "class Point:\n", + " r = 4\n", + " hr = r / 2\n", + " tail = 5\n", + "\n", + " def __init__(self, *xy):\n", + " if len(xy) == 1:\n", + " xy = xy[0]\n", + " self.x, self.y = xy\n", + " self.x = math.ceil(self.x)\n", + " self.y = math.ceil(self.y)\n", + " self.down = False\n", + " self.up = False\n", + " self.left = False\n", + " self.right = False\n", + "\n", + " @property\n", + " def symbol(self):\n", + " direction_table = {\n", + " (False, False, False, False): '◦',\n", + "\n", + " (True, False, False, False): '↑',\n", + " (False, True, False, False): '↓',\n", + " (True, True, False, False): '↕',\n", + "\n", + " (True, True, True, False): '⊢',\n", + " (True, True, False, True): '⊣',\n", + "\n", + " (False, False, True, False): '→',\n", + " (False, False, False, True): '←',\n", + " (False, False, True, True): '↔',\n", + "\n", + " (True, False, True, True): '⊥',\n", + " (False, True, True, True): '⊤',\n", + "\n", + " (True, True, True, True): '╋',\n", + "\n", + " (True, False, True, False): '┗',\n", + " (True, False, False, True): '┛',\n", + "\n", + " (False, True, True, False): '┏',\n", + " (False, True, False, True): '┛',\n", + "\n", + " }\n", + " return direction_table[(self.up, self.down, self.right, self.left)]\n", + "\n", + " def __repr__(self):\n", + " return \"Point\".format(self.x, self.y)\n", + "\n", + " def distance(self, other: 'Point'):\n", + " return math.sqrt(((self.x - other.x) ** 2) + ((self.y - other.y) ** 2))\n", + "\n", + " @property\n", + " def as_tuple(self):\n", + " return self.x, self.y\n", + "\n", + " def draw(self, canvas: ImageDraw.ImageDraw, color='red'):\n", + " canvas.ellipse((self.x - self.hr, self.y - self.hr, self.x + self.hr, self.y + self.hr), fill=color)\n", + " if self.down:\n", + " canvas.line(((self.x, self.y), (self.x, self.y + self.tail)), 'blue')\n", + " if self.up:\n", + " canvas.line(((self.x, self.y), (self.x, self.y - self.tail)), 'blue')\n", + " if self.left:\n", + " canvas.line(((self.x, self.y), (self.x - self.tail, self.y)), 'blue')\n", + " if self.right:\n", + " canvas.line(((self.x, self.y), (self.x + self.tail, self.y)), 'blue')\n", + "\n", + " def points_to_right(self, other_points: List['Point']):\n", + " sorted_other_points = sorted(other_points, key=lambda other: other.x)\n", + " filtered_other_points = filter(lambda o: almost_equals(o.y, self.y) and o != self and o.x > self.x,\n", + " sorted_other_points)\n", + " return list(filtered_other_points)\n", + "\n", + " def points_below(self, other_points: List['Point']):\n", + " sorted_other_points = sorted(other_points, key=lambda other: other.y)\n", + " filtered_other_points = filter(lambda o: almost_equals(o.x, self.x) and o != self and o.y > self.y,\n", + " sorted_other_points)\n", + " return list(filtered_other_points)\n", + "\n", + " def on_same_line(self, other: 'Point'):\n", + " if self == other:\n", + " return False\n", + " if almost_equals(self.x, other.x) or almost_equals(self.y, other.y):\n", + " return True\n", + " return False\n", + "\n", + " def is_above(self, other: 'Point'):\n", + " return self.y < other.y\n", + "\n", + " def is_to_right(self, other: 'Point'):\n", + " return self.x > other.x\n", + "\n", + " def is_below(self, other: 'Point'):\n", + " return self.y > other.y\n", + "\n", + " def is_to_left(self, other: 'Point'):\n", + " return self.x < other.x\n", + "\n", + " def get_right(self, others: List['Point']):\n", + " others = self.points_to_right(others)\n", + " for point in others:\n", + " if point.down:\n", + " return point\n", + " return None\n", + "\n", + " def get_bottom(self, others: List['Point'], left=False, right=False):\n", + " others = self.points_below(others)\n", + " for point in others:\n", + " if point.up:\n", + " if left:\n", + " if not point.right:\n", + " continue\n", + " if right:\n", + " if not point.left:\n", + " continue\n", + " return point\n", + " return None\n", + "\n", + " def has_above(self, others: List['Point']):\n", + " others = list(filter(lambda p: p.up, others))\n", + " point = list(sorted(others, key=lambda p: p.y))[0]\n", + " if point.is_above(self) and point.up:\n", + " return True\n", + " return False\n", + "\n", + " def copy(self, other: 'Point'):\n", + " self.down = other.down\n", + " self.up = other.up\n", + " self.left = other.left\n", + " self.right = other.right\n", + "\n", + " def merge(self, other: 'Point'):\n", + " self.up |= other.up\n", + " self.down |= other.down\n", + " self.left |= other.left\n", + " self.right |= other.right\n", + "\n", + " def __eq__(self, other: 'Point'):\n", + " if not almost_equals(self.x, other.x):\n", + " return False\n", + " return almost_equals(self.y, other.y)\n", + "\n", + " def __hash__(self):\n", + " return hash((self.x, self.y))\n", + "\n", + "\n", + "class Line:\n", + "\n", + " def __init__(self, p1: 'Point', p2: 'Point'):\n", + " self.p1 = p1\n", + " self.p2 = p2\n", + " self.vertical = almost_equals(self.x, self.cx)\n", + " if self.vertical:\n", + " if self.p1.is_above(self.p2):\n", + " pass\n", + " else:\n", + " self.p1, self.p2 = self.p2, self.p1\n", + " else:\n", + " if self.p2.is_to_right(self.p1):\n", + " pass\n", + " else:\n", + " self.p1, self.p2 = self.p2, self.p1\n", + "\n", + " if self.vertical:\n", + " self.p1.down = True\n", + " self.p2.up = True\n", + " else:\n", + " self.p1.right = True\n", + " self.p2.left = True\n", + "\n", + " def __hash__(self):\n", + " return hash((self.p1, self.p2, self.vertical))\n", + "\n", + " @property\n", + " def x(self):\n", + " return self.p1.x\n", + "\n", + " @property\n", + " def y(self):\n", + " return self.p1.y\n", + "\n", + " @property\n", + " def cx(self):\n", + " return self.p2.x\n", + "\n", + " @property\n", + " def cy(self):\n", + " return self.p2.y\n", + "\n", + " @property\n", + " def length(self):\n", + " return self.p1.distance(self.p2)\n", + "\n", + " def __repr__(self):\n", + " return 'Line'.format(self.p1, self.p2, 'vertical' if self.vertical else 'horizontal')\n", + "\n", + " def draw(self, canvas: ImageDraw.ImageDraw, color='blue'):\n", + " x, y = self.x, self.y\n", + " cx, cy = self.cx, self.cy\n", + "\n", + " canvas.line(((x, y), (cx, cy)), color, width=2)\n", + "\n", + " @property\n", + " def as_tuple(self):\n", + " return (self.x, self.y), (self.cx, self.cy)\n", + "\n", + " def infite_intersect(self, other: 'Line'):\n", + " line1 = self.as_tuple\n", + " line2 = other.as_tuple\n", + " x_diff = (line1[0][0] - line1[1][0], line2[0][0] - line2[1][0])\n", + " y_diff = (line1[0][1] - line1[1][1], line2[0][1] - line2[1][1]) # Typo was here\n", + "\n", + " def det(point_a, point_b):\n", + " return point_a[0] * point_b[1] - point_a[1] * point_b[0]\n", + "\n", + " div = det(x_diff, y_diff)\n", + " if div == 0:\n", + " return None, None\n", + " d = (det(*line1), det(*line2))\n", + " x = det(d, x_diff) / div\n", + " y = det(d, y_diff) / div\n", + " return x, y\n", + "\n", + " def intersect(self, other: 'Line', print_fulness=False) -> bool:\n", + " \"\"\" this returns the intersection of Line(pt1,pt2) and Line(ptA,ptB)\n", + " returns a tuple: (xi, yi, valid, r, s), where\n", + " (xi, yi) is the intersection\n", + " r is the scalar multiple such that (xi,yi) = pt1 + r*(pt2-pt1)\n", + " s is the scalar multiple such that (xi,yi) = pt1 + s*(ptB-ptA)\n", + " valid == 0 if there are 0 or inf. intersections (invalid)\n", + " valid == 1 if it has a unique intersection ON the segment \"\"\"\n", + " point_1 = self.x, self.y\n", + " point_2 = self.cx, self.cy\n", + " point_a = other.x, other.y\n", + " point_b = other.cx, other.cy\n", + " if self.vertical:\n", + " if self.y > self.cy:\n", + " if self.y >= other.y >= self.cy:\n", + " pass\n", + " else:\n", + " return False\n", + " else:\n", + " if other.y > other.cy:\n", + " if other.y >= self.y >= other.cy:\n", + " pass\n", + " else:\n", + " return False\n", + " det_tolerance = 0.0001\n", + " x1, y1 = point_1\n", + " x2, y2 = point_2\n", + " dx1 = x2 - x1\n", + " dy1 = y2 - y1\n", + " x, y = point_a\n", + " xb, yb = point_b\n", + " dx = xb - x\n", + " dy = yb - y\n", + " det = (-dx1 * dy + dy1 * dx)\n", + " if math.fabs(det) < det_tolerance:\n", + " return False\n", + " det_inv = 1.0 / det\n", + " r = det_inv * (-dy * (x - x1) + dx * (y - y1))\n", + " s = det_inv * (-dy1 * (x - x1) + dx1 * (y - y1))\n", + " if print_fulness:\n", + " print('self segment', r)\n", + " print('other segment', s)\n", + " if r > 1 or s > 1: # can't be higher than 1, 1 means they are NOT intersecting\n", + " return False\n", + " if r > -0.1 and s > -0.1: # This can happen on edges, so we allow small inaccuracy\n", + " return True\n", + " return False\n", + "\n", + " def intersection(self, other: 'Line', print_fulness=False) -> (int, int):\n", + " \"\"\" this returns the intersection of Line(pt1,pt2) and Line(ptA,ptB)\n", + " returns a tuple: (xi, yi, valid, r, s), where\n", + " (xi, yi) is the intersection\n", + " r is the scalar multiple such that (xi,yi) = pt1 + r*(pt2-pt1)\n", + " s is the scalar multiple such that (xi,yi) = pt1 + s*(ptB-ptA)\n", + " valid == 0 if there are 0 or inf. intersections (invalid)\n", + " valid == 1 if it has a unique intersection ON the segment \"\"\"\n", + " point_1 = self.x, self.y\n", + " point_2 = self.cx, self.cy\n", + " point_a = other.x, other.y\n", + " point_b = other.cx, other.cy\n", + " det_tolerance = 1\n", + " x1, y1 = point_1\n", + " x2, y2 = point_2\n", + " dx1 = x2 - x1\n", + " dy1 = y2 - y1\n", + " x, y = point_a\n", + " xb, yb = point_b\n", + " dx = xb - x\n", + " dy = yb - y\n", + " det = (-dx1 * dy + dy1 * dx)\n", + "\n", + " if math.fabs(det) < det_tolerance:\n", + " return None, None\n", + " det_inv = 1.0 / det\n", + " r = det_inv * (-dy * (x - x1) + dx * (y - y1))\n", + " s = det_inv * (-dy1 * (x - x1) + dx1 * (y - y1))\n", + " xi = (x1 + r * dx1 + x + s * dx) / 2.0\n", + " yi = (y1 + r * dy1 + y + s * dy) / 2.0\n", + " if print_fulness:\n", + " print('self segment', r)\n", + " print('other segment', s)\n", + " return (round(xi), round(yi)), round(r, 4), round(s, 4)\n", + "\n", + " def is_between(self, point: 'Point'):\n", + " pt1 = self.p1\n", + " pt2 = self.p2\n", + " cross_product = (point.y - pt1.y) * (pt2.x - pt1.x) - (point.x - pt1.x) * (pt2.y - pt1.y)\n", + "\n", + " # compare versus epsilon for floating point values, or != 0 if using integers\n", + " if abs(cross_product) > math.e:\n", + " return False\n", + "\n", + " dot_product = (point.x - pt1.x) * (pt2.x - pt1.x) + (point.y - pt1.y) * (pt2.y - pt1.y)\n", + " if dot_product < 0:\n", + " return False\n", + "\n", + " squared_length_ba = (pt2.x - pt1.x) * (pt2.x - pt1.x) + (pt2.y - pt1.y) * (pt2.y - pt1.y)\n", + " if dot_product > squared_length_ba:\n", + " return False\n", + "\n", + " return True\n", + "\n", + " def on_line(self, point: 'Point'):\n", + " if self.vertical:\n", + " if almost_equals(self.p1.x, point.x):\n", + " return True\n", + " else:\n", + " if almost_equals(self.p1.y, point.y):\n", + " return True\n", + " return False\n", + "\n", + " def __contains__(self, other: {'Line', 'Point'}):\n", + " if type(other) == Line:\n", + " if self.vertical == other.vertical:\n", + " return False\n", + " return self.intersect(other)\n", + " if type(other) == Point:\n", + " return self.is_between(other)\n", + " pass\n", + "\n", + " def on_same_line(self, other: 'Line'):\n", + " if other.vertical != self.vertical:\n", + " return False\n", + " if self.vertical:\n", + " return self.x == other.x\n", + " else:\n", + " return self.y == other.y\n", + "\n", + " def __eq__(self, other: 'Line'):\n", + " return self.on_same_line(other)\n", + "\n", + " def corner(self, other: 'Line'):\n", + " if self.p1 == other.p1 or self.p2 == other.p2 or self.p1 == other.p2:\n", + " return True\n", + " return False\n", + "\n", + " def connected(self, other: 'Line'):\n", + " return other.p1 in self or other.p2 in self\n", + "\n", + " def parallel(self, other: 'Line'):\n", + " return self.vertical == other.vertical\n", + "\n", + " def on_corners(self, other: 'Point'):\n", + " return other == self.p1 or other == self.p2\n", + "\n", + " def test_intersection(self, other: 'Line'):\n", + " \"\"\" prints out a test for checking by hand... \"\"\"\n", + " print('Testing intersection of:')\n", + " print('\\t', self)\n", + " print('\\t', other)\n", + " result = self.intersection(other, True)\n", + " print(\"\\t Intersection result =\", Point(result[0]))\n", + " print()\n", + "\n", + "\n", + "class Cell:\n", + " \"\"\"P1-------P2\n", + " | |\n", + " | |\n", + " | |\n", + " | |\n", + " P4-------P3\n", + " \"\"\"\n", + " try:\n", + " font = ImageFont.truetype('arial', size=9)\n", + " except:\n", + " font = ImageFont.load_default()\n", + "\n", + " def __init__(self, p1, p2, p3, p4):\n", + " self.p1: Point = p1\n", + " self.p2: Point = p2\n", + " self.p3: Point = p3\n", + " self.p4: Point = p4\n", + " self.text = ''\n", + " self.words = [] # type: List[str]\n", + "\n", + " def __repr__(self):\n", + " return 'Cell <\"{}\"> '.format(self.text.replace('\\n', ' '))\n", + "\n", + " def get_text(self):\n", + " return ''.join(map(itemgetter('text'),self.words))\n", + "\n", + " @property\n", + " def clean_text(self) -> str:\n", + " return self.text.replace('\\n', ' ')\n", + "\n", + " def __hash__(self):\n", + " return hash(self.text) + hash(self.as_tuple)\n", + "\n", + " def on_same_line(self, other: 'Cell'):\n", + " return self.p1.on_same_line(other.p1)\n", + "\n", + " def on_same_row(self, other: 'Cell'):\n", + " return self.p1.y == other.p1.y\n", + "\n", + " @property\n", + " def as_tuple(self):\n", + " return self.p1.as_tuple, self.p2.as_tuple, self.p3.as_tuple, self.p4.as_tuple\n", + "\n", + " def __eq__(self, other: 'Cell'):\n", + " if self.p1 == other.p1 and self.p2 == other.p2 and self.p3 == other.p3 and self.p4 == other.p4:\n", + " return True\n", + " if self.p1 == other.p2 and self.p2 == other.p3 and self.p3 == other.p4 and self.p4 == other.p1:\n", + " return True\n", + " if self.p1 == other.p3 and self.p2 == other.p4 and self.p3 == other.p1 and self.p4 == other.p2:\n", + " return True\n", + " if self.p1 == other.p4 and self.p2 == other.p1 and self.p3 == other.p2 and self.p4 == other.p3:\n", + " return True\n", + "\n", + " @property\n", + " def center(self):\n", + " x = [p.x for p in [self.p1, self.p2, self.p3, self.p4]]\n", + " y = [p.y for p in [self.p1, self.p2, self.p3, self.p4]]\n", + " centroid = Point(sum(x) / 4, sum(y) / 4)\n", + " return centroid\n", + "\n", + " def draw(self, canvas: ImageDraw.ImageDraw, color='black', width=1, text_color='black'):\n", + "\n", + " # canvas.rectangle((self.p1.as_tuple, self.p3.as_tuple), outline=color,)\n", + " canvas.line((self.p1.as_tuple, self.p2.as_tuple), color, width)\n", + " canvas.line((self.p2.as_tuple, self.p3.as_tuple), color, width)\n", + " canvas.line((self.p3.as_tuple, self.p4.as_tuple), color, width)\n", + " canvas.line((self.p4.as_tuple, self.p1.as_tuple), color, width)\n", + " if self.text:\n", + " canvas.text((self.p1.x + 3, self.p1.y + 3), self.text, fill=text_color, font=self.font)\n", + "\n", + " def print_cell(self):\n", + " buffer = ''\n", + " longest = max([len(word) for word in self.text.split(\"\\n\")])\n", + " buffer += '┼' + \"─\" * longest + '┼\\n'\n", + " for text_line in self.text.split('\\n'):\n", + " buffer += \"│\" + text_line + ' ' * (longest - len(text_line))\n", + " buffer += \"│\\n\"\n", + " buffer += '┼' + \"─\" * longest + '┼\\n'\n", + " print(buffer)\n", + "\n", + " def point_inside_polygon(self, point: 'Point', include_edges=True):\n", + " \"\"\"\n", + " Test if point (x,y) is inside polygon poly.\n", + " poly is N-vertices polygon defined as\n", + " [(x1,y1),...,(xN,yN)] or [(x1,y1),...,(xN,yN),(x1,y1)]\n", + " (function works fine in both cases)\n", + " Geometrical idea: point is inside polygon if horizontal beam\n", + " to the right from point crosses polygon even number of times.\n", + " Works fine for non-convex polygons.\n", + " \"\"\"\n", + " x, y = point.as_tuple\n", + " x1, y1 = self.p1.as_tuple\n", + " x2, y2 = self.p3.as_tuple\n", + " return x1 < x < x2 and y1 < y < y2\n", + "\n", + "\n", + "class Table:\n", + "\n", + " def __init__(self, cells: List[Cell], skeleton: List[List[Cell]], ugly_table: List[List[str]], words, canvas=None):\n", + " self.cells = cells\n", + " self.canvas = canvas\n", + " self.words = words\n", + " self.skeleton = skeleton\n", + " self.ugly_table = ugly_table\n", + " self.global_map = {}\n", + "\n", + " def build_table(self):\n", + " for y, (text_row, skeleton_row) in enumerate(zip(self.ugly_table, self.skeleton)):\n", + " self.global_map[y] = {}\n", + " for x, (text, cell) in enumerate(zip(text_row, skeleton_row)):\n", + " for t_cell in self.cells:\n", + " if t_cell.point_inside_polygon(cell.center):\n", + " t_cell.text += text if text else ''\n", + " self.global_map[y][x] = t_cell\n", + "\n", + " processed_cells = []\n", + " for cell in tqdm(self.cells, desc='Analyzing cells', unit='cells'):\n", + " if cell in processed_cells:\n", + " continue\n", + " in_words = list(filter(lambda char: cell.point_inside_polygon(\n", + " Point(char['x0'], char['top'])), self.words))\n", + " cell.words = in_words\n", + " processed_cells.append(cell)\n", + "\n", + " if self.canvas:\n", + " for cell in self.cells:\n", + " # print(cell.get_text())\n", + " cell.draw(self.canvas)\n", + "\n", + " def get_col(self, col_id) -> List[Cell]:\n", + " col = []\n", + " for row in self.global_map.values():\n", + " col.append(row[col_id])\n", + " return col\n", + "\n", + " def get_row(self, row_id) -> List[Cell]:\n", + " return list(self.global_map[row_id].values())\n", + "\n", + " def get_cell(self, x, y) -> Cell:\n", + " return self.global_map[y][x]\n", + "\n", + " def get_cell_span(self, cell):\n", + " temp = {}\n", + " for row_id, row in self.global_map.items():\n", + "\n", + " for col_id, t_cell in row.items():\n", + " if t_cell == cell:\n", + " if not temp.get(row_id, False):\n", + " temp[row_id] = {}\n", + " temp[row_id][col_id] = True\n", + " row_span = len(temp)\n", + " col_span = len(list(temp.values())[0])\n", + " return row_span, col_span\n", + "\n", + "\n", + "class TableExtractor:\n", + "\n", + " def __init__(self, path):\n", + " self.pdf = pdfplumber.open(path)\n", + " self.draw = False\n", + " self.debug = False\n", + "\n", + " @staticmethod\n", + " def filter_lines(lines: List[Line]):\n", + " new_lines = []\n", + " lines = list(set(lines))\n", + " la = new_lines.append\n", + " for line1 in tqdm(lines, desc='Filtering lines', unit='lines'):\n", + " if line1 in new_lines:\n", + " continue\n", + " la(line1)\n", + " new_lines = list(set(new_lines))\n", + " return new_lines\n", + "\n", + " @staticmethod\n", + " def add_skeleton_points(points, line):\n", + " points.append(line.p1)\n", + " points.append(line.p2)\n", + "\n", + " def build_skeleton(self, lines):\n", + " skeleton_points = []\n", + " skeleton = []\n", + " temp_point = Point(0, 0)\n", + " temp_point.down = temp_point.up = temp_point.left = temp_point.right = True\n", + " vertical = list(filter(lambda l: l.vertical, lines))\n", + " horizontal = list(filter(lambda l: not l.vertical, lines))\n", + " for line1 in tqdm(vertical, desc='Building table skeleton', unit='lines'):\n", + " sys.stdout.flush()\n", + " if line1.length < 3.0:\n", + " continue\n", + " self.add_skeleton_points(skeleton_points, line1)\n", + " for line2 in horizontal:\n", + " if line1 == line2:\n", + " continue\n", + " self.add_skeleton_points(skeleton_points, line2)\n", + " if line1.infite_intersect(line2):\n", + " p1 = Point(line1.infite_intersect(line2))\n", + " if p1 not in skeleton_points:\n", + " skeleton_points.append(p1)\n", + "\n", + " for n, p in enumerate(skeleton_points):\n", + " skeleton_points[n].copy(temp_point)\n", + " if p == p1:\n", + " p1.copy(p)\n", + " skeleton_points[n] = p1\n", + " skeleton_points = list(set(skeleton_points))\n", + " sorted_y_points = sorted(skeleton_points, key=lambda other: other.y)\n", + " for p1 in tqdm(sorted_y_points, desc='Building skeleton cells', unit='point'):\n", + " p2 = p1.get_right(skeleton_points)\n", + " if p2:\n", + " p3 = p2.get_bottom(skeleton_points, right=True)\n", + " p4 = p1.get_bottom(skeleton_points, left=True)\n", + " if p3 and p4:\n", + " cell = Cell(p1, p2, p3, p4)\n", + " if cell not in skeleton:\n", + " skeleton.append(cell)\n", + " else:\n", + " continue\n", + " return skeleton_points, skeleton\n", + "\n", + " @staticmethod\n", + " def skeleton_to_2d_table(skeleton: List[Cell]) -> List[List[Cell]]:\n", + " rows = []\n", + " for cell in tqdm(skeleton, desc='Analyzing cell positions', unit='cells'):\n", + " row = tuple(sorted(filter(lambda c: cell.on_same_row(c), skeleton), key=lambda c: c.p1.x))\n", + " rows.append(row)\n", + " rows = list(sorted(list(set(rows)), key=lambda c: c[0].p1.y))\n", + " rows = [list(row) for row in rows]\n", + " return rows\n", + "\n", + " def parse_page(self, page_n):\n", + " if self.debug:\n", + " print('Parsing page', page_n)\n", + " page = self.pdf.pages[page_n]\n", + " if self.debug:\n", + " print('Rendering page')\n", + "\n", + " if self.debug:\n", + " print('Finding tables')\n", + " tables = TableFinder(page, {'snap_tolerance': 3, 'join_tolerance': 3})\n", + " if self.debug:\n", + " print('Found', len(tables.tables), 'tables')\n", + " beaut_tables = []\n", + " if self.draw:\n", + " p_im = page.to_image(resolution=100)\n", + " p_im.draw_lines(page.lines)\n", + " p_im.save('page-{}-lines.png'.format(page_n + 1))\n", + " if len(tables.tables) > 5:\n", + " return []\n", + " for n, table in enumerate(tables.tables):\n", + " if self.draw:\n", + " p_im.reset()\n", + " im = Image.new('RGB', (page.width, page.height), (255,) * 3)\n", + " canvas = ImageDraw.ImageDraw(im)\n", + " ugly_table = table.extract()\n", + " lines = [] # type: List[Line]\n", + " cells = [] # type: List[Cell]\n", + " for cell in tqdm(table.cells, desc='Parsing cells', unit='cells'):\n", + " # p_im.draw_rect(cell)\n", + " x1, y1, x2, y2 = cell\n", + " p1 = Point(x1, y1)\n", + " p1.right = True\n", + " p1.down = True\n", + " p2 = Point(x2, y1)\n", + " p2.left = True\n", + " p2.down = True\n", + " p3 = Point(x2, y2)\n", + " p3.up = True\n", + " p3.left = True\n", + " p4 = Point(x1, y2)\n", + " p4.up = True\n", + " p4.right = True\n", + " line1 = Line(p1, p2)\n", + " line2 = Line(p2, p3)\n", + " line3 = Line(p3, p4)\n", + " line4 = Line(p4, p1)\n", + " lines.append(line1)\n", + " lines.append(line2)\n", + " lines.append(line3)\n", + " lines.append(line4)\n", + " cell = Cell(p1, p2, p3, p4)\n", + " cells.append(cell)\n", + "\n", + " # for line in lines:\n", + " # p_im.draw_line(line.as_tuple)\n", + " lines = self.filter_lines(lines)\n", + " # for line in lines:\n", + " # line.draw(canvas, color='green')\n", + " if self.draw:\n", + " p_im.save('page-{}-{}_im.png'.format(page_n + 1, n))\n", + " im.save('page-{}-{}.png'.format(page_n + 1, n))\n", + " skeleton_points, skeleton = self.build_skeleton(lines.copy())\n", + " if not skeleton_points:\n", + " continue\n", + " skeleton = self.skeleton_to_2d_table(skeleton)\n", + "\n", + " # for p in points:\n", + " # p.draw(canvas)\n", + "\n", + " beaut_table = Table(cells, skeleton, ugly_table, page.extract_words())\n", + " beaut_table.build_table()\n", + " if self.draw:\n", + " for cell in beaut_table.cells:\n", + " cell.draw(canvas)\n", + " if self.debug:\n", + " print('Saving rendered table')\n", + " if self.draw:\n", + " p_im.save('page-{}-{}_im.png'.format(page_n + 1, n))\n", + " im.save('page-{}-{}.png'.format(page_n + 1, n))\n", + " if self.draw:\n", + " canvas.rectangle((0,0,page.width,page.height),fill='white') #cleaning canvas\n", + " for row_id, row in enumerate(skeleton):\n", + " for cell_id, cell in enumerate(row):\n", + " cell.text = '{}-{}'.format(row_id, cell_id)\n", + " cell.draw(canvas, color='green',text_color='red')\n", + " im.save('page-{}-{}-skeleton.png'.format(page_n + 1, n))\n", + " beaut_tables.append(beaut_table)\n", + "\n", + " return beaut_tables\n", + "\n", + "\n", + "# def pdfplumber_table_to_table():\n", + "\n", + "\n", + "if __name__ == '__main__':\n", + " # datasheet = DataSheet(r\"D:\\PYTHON\\py_pdf_stm\\datasheets\\stm32L\\stm32L431\\stm32L431_ds.pdf\")\n", + " # pdf_interpreter = PDFInterpreter(r\"/mnt/d/PYTHON/py_pdf_stm/datasheets/stm32L/stm32L476/stm32L476_ds.pdf\")\n", + " # pdf_interpreter = TableExtractor(r\"D:\\PYTHON\\py_pdf_stm\\datasheets\\stm32L\\stm32L476\\stm32L476_ds.pdf\")\n", + " # pdf_interpreter = PDFInterpreter(r\"/mnt/d/PYTHON/py_pdf_stm/datasheets/KL/KL17P64M48SF6_ds.pdf\")\n", + " pdf_interpreter = TableExtractor(r\"/Users/richardlee/Downloads/WorkforceUtilizationSummaryReportApril2019.pdf\")\n", + " # pdf_interpreter = PDFInterpreter(r\"D:\\PYTHON\\py_pdf_stm\\datasheets\\KL\\KL17P64M48SF6_ds.pdf\")\n", + " pdf_interpreter.draw = True\n", + " pdf_interpreter.debug = True\n", + " # pdf_interpreter = PDFInterpreter(pdf.table_root.childs[table])\n", + " # print(pdf_interpreter.content)\n", + " # tables = pdf_interpreter.parse_page(5)\n", + " tables = pdf_interpreter.parse_page(16)\n", + " #print(tables)\n", + " # pdf_interpreter.parse_page(1)\n", + " # pdf_interpreter.save()\n", + " # pdf_interpreter.table.print_table()" + ] + }, + { + "cell_type": "code", + "execution_count": null, + "id": "fitted-florence", + "metadata": {}, + "outputs": [], + "source": [] + } + ], + "metadata": { + "kernelspec": { + "display_name": "Python 3", + "language": "python", + "name": "python3" + }, + "language_info": { + "codemirror_mode": { + "name": "ipython", + "version": 3 + }, + "file_extension": ".py", + "mimetype": "text/x-python", + "name": "python", + "nbconvert_exporter": "python", + "pygments_lexer": "ipython3", + "version": "3.9.1" + } + }, + "nbformat": 4, + "nbformat_minor": 5 +} diff --git a/WGBH-DCAMM/src/parsers/page-17-0-skeleton.png b/WGBH-DCAMM/src/parsers/page-17-0-skeleton.png new file mode 100644 index 00000000..dc2e3ee3 Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-0-skeleton.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-0.png b/WGBH-DCAMM/src/parsers/page-17-0.png new file mode 100644 index 00000000..ff38663e Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-0.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-0_im.png b/WGBH-DCAMM/src/parsers/page-17-0_im.png new file mode 100644 index 00000000..a6956b6c Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-0_im.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-1-skeleton.png b/WGBH-DCAMM/src/parsers/page-17-1-skeleton.png new file mode 100644 index 00000000..5a957d0c Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-1-skeleton.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-1.png b/WGBH-DCAMM/src/parsers/page-17-1.png new file mode 100644 index 00000000..3d090804 Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-1.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-1_im.png b/WGBH-DCAMM/src/parsers/page-17-1_im.png new file mode 100644 index 00000000..a6956b6c Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-1_im.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-2-skeleton.png b/WGBH-DCAMM/src/parsers/page-17-2-skeleton.png new file mode 100644 index 00000000..bbb78ee7 Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-2-skeleton.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-2.png b/WGBH-DCAMM/src/parsers/page-17-2.png new file mode 100644 index 00000000..f5fabeef Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-2.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-2_im.png b/WGBH-DCAMM/src/parsers/page-17-2_im.png new file mode 100644 index 00000000..a6956b6c Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-2_im.png differ diff --git a/WGBH-DCAMM/src/parsers/page-17-lines.png b/WGBH-DCAMM/src/parsers/page-17-lines.png new file mode 100644 index 00000000..945a9f90 Binary files /dev/null and b/WGBH-DCAMM/src/parsers/page-17-lines.png differ diff --git a/WGBH-DCAMM/src/parsers/pdf_parser.py b/WGBH-DCAMM/src/parsers/pdf_parser.py index fb5753da..fd217244 100644 --- a/WGBH-DCAMM/src/parsers/pdf_parser.py +++ b/WGBH-DCAMM/src/parsers/pdf_parser.py @@ -1,10 +1,52 @@ import PyPDF2 -def import_pdf(filename, debug): - row_count = 0 +# convert all PDFs in a directory +import tabula + +def convert_str(s): + types = [int, float] + for t in types: + try: + return t(s) + except ValueError: + pass + return str(s).strip('\"') + +def batch_transform(data_dir, debug): + tabula.convert_into_by_batch(data_dir, output_format='csv', pages='all') + # data_dir = "data" + + +def frame_import(filename, debug): + df2 = tabula.read_pdf( + "./data/WorkforceUtilizationSummaryReportApril2019.pdf") + if debug: + print(df2) + # "./data/WorkforceUtilizationSummaryReportApril2019.pdf") + + +def import_pypdf2(filename, debug): with open(filename, 'r') as f: pdfReader = PyPDF2.PdfFileReader(f) print(pdfReader.numPages) pageObj = pdfReader.getPage(0) print(pageObj.extractText()) - f.close() \ No newline at end of file + f.close() + + +def read_csv(csv_file_path, debug): + """ + Given a path to a csv file, return a matrix (list of lists) + in row major. + """ + res = [] + with open("data/WorkforceUtilizationSummaryReportDec2019.csv", 'r') as csv_file: + lines = csv_file.readlines() + for line in lines: + row = [] + values = line.strip('\n').split(',') + for val in values: + row.append(convert_str(val)) + res.append(row) + print(res) + return res \ No newline at end of file diff --git a/WGBH-DCAMM/src/parsers/pdf_parser_rl.py b/WGBH-DCAMM/src/parsers/pdf_parser_rl.py index e69de29b..5755d24f 100644 --- a/WGBH-DCAMM/src/parsers/pdf_parser_rl.py +++ b/WGBH-DCAMM/src/parsers/pdf_parser_rl.py @@ -0,0 +1,740 @@ +# import tabula +# pdf_path = "/Users/richardlee/Downloads/WorkforceUtilizationSummaryReportApril2019.pdf" + +# dfs = tabula.read_pdf(pdf_path, pages = 1) +# tabula.convert_into(pdf_path, "out_put.csv", output_format= "csv", pages='all') + +import math +from operator import itemgetter + +import pdfplumber +from PIL import ImageDraw, ImageFont, Image +from pdfplumber.table import TableFinder + +from DataSheet import * + + +def almost_equals(num1, num2, precision=5.0): + return abs(num1 - num2) < precision + + +class Point: + r = 4 + hr = r / 2 + tail = 5 + + def __init__(self, *xy): + if len(xy) == 1: + xy = xy[0] + self.x, self.y = xy + self.x = math.ceil(self.x) + self.y = math.ceil(self.y) + self.down = False + self.up = False + self.left = False + self.right = False + + @property + def symbol(self): + direction_table = { + (False, False, False, False): '◦', + + (True, False, False, False): '↑', + (False, True, False, False): '↓', + (True, True, False, False): '↕', + + (True, True, True, False): '⊢', + (True, True, False, True): '⊣', + + (False, False, True, False): '→', + (False, False, False, True): '←', + (False, False, True, True): '↔', + + (True, False, True, True): '⊥', + (False, True, True, True): '⊤', + + (True, True, True, True): '╋', + + (True, False, True, False): '┗', + (True, False, False, True): '┛', + + (False, True, True, False): '┏', + (False, True, False, True): '┛', + + } + return direction_table[(self.up, self.down, self.right, self.left)] + + def __repr__(self): + return "Point".format(self.x, self.y) + + def distance(self, other: 'Point'): + return math.sqrt(((self.x - other.x) ** 2) + ((self.y - other.y) ** 2)) + + @property + def as_tuple(self): + return self.x, self.y + + def draw(self, canvas: ImageDraw.ImageDraw, color='red'): + canvas.ellipse((self.x - self.hr, self.y - self.hr, self.x + self.hr, self.y + self.hr), fill=color) + if self.down: + canvas.line(((self.x, self.y), (self.x, self.y + self.tail)), 'blue') + if self.up: + canvas.line(((self.x, self.y), (self.x, self.y - self.tail)), 'blue') + if self.left: + canvas.line(((self.x, self.y), (self.x - self.tail, self.y)), 'blue') + if self.right: + canvas.line(((self.x, self.y), (self.x + self.tail, self.y)), 'blue') + + def points_to_right(self, other_points: List['Point']): + sorted_other_points = sorted(other_points, key=lambda other: other.x) + filtered_other_points = filter(lambda o: almost_equals(o.y, self.y) and o != self and o.x > self.x, + sorted_other_points) + return list(filtered_other_points) + + def points_below(self, other_points: List['Point']): + sorted_other_points = sorted(other_points, key=lambda other: other.y) + filtered_other_points = filter(lambda o: almost_equals(o.x, self.x) and o != self and o.y > self.y, + sorted_other_points) + return list(filtered_other_points) + + def on_same_line(self, other: 'Point'): + if self == other: + return False + if almost_equals(self.x, other.x) or almost_equals(self.y, other.y): + return True + return False + + def is_above(self, other: 'Point'): + return self.y < other.y + + def is_to_right(self, other: 'Point'): + return self.x > other.x + + def is_below(self, other: 'Point'): + return self.y > other.y + + def is_to_left(self, other: 'Point'): + return self.x < other.x + + def get_right(self, others: List['Point']): + others = self.points_to_right(others) + for point in others: + if point.down: + return point + return None + + def get_bottom(self, others: List['Point'], left=False, right=False): + others = self.points_below(others) + for point in others: + if point.up: + if left: + if not point.right: + continue + if right: + if not point.left: + continue + return point + return None + + def has_above(self, others: List['Point']): + others = list(filter(lambda p: p.up, others)) + point = list(sorted(others, key=lambda p: p.y))[0] + if point.is_above(self) and point.up: + return True + return False + + def copy(self, other: 'Point'): + self.down = other.down + self.up = other.up + self.left = other.left + self.right = other.right + + def merge(self, other: 'Point'): + self.up |= other.up + self.down |= other.down + self.left |= other.left + self.right |= other.right + + def __eq__(self, other: 'Point'): + if not almost_equals(self.x, other.x): + return False + return almost_equals(self.y, other.y) + + def __hash__(self): + return hash((self.x, self.y)) + + +class Line: + + def __init__(self, p1: 'Point', p2: 'Point'): + self.p1 = p1 + self.p2 = p2 + self.vertical = almost_equals(self.x, self.cx) + if self.vertical: + if self.p1.is_above(self.p2): + pass + else: + self.p1, self.p2 = self.p2, self.p1 + else: + if self.p2.is_to_right(self.p1): + pass + else: + self.p1, self.p2 = self.p2, self.p1 + + if self.vertical: + self.p1.down = True + self.p2.up = True + else: + self.p1.right = True + self.p2.left = True + + def __hash__(self): + return hash((self.p1, self.p2, self.vertical)) + + @property + def x(self): + return self.p1.x + + @property + def y(self): + return self.p1.y + + @property + def cx(self): + return self.p2.x + + @property + def cy(self): + return self.p2.y + + @property + def length(self): + return self.p1.distance(self.p2) + + def __repr__(self): + return 'Line'.format(self.p1, self.p2, 'vertical' if self.vertical else 'horizontal') + + def draw(self, canvas: ImageDraw.ImageDraw, color='blue'): + x, y = self.x, self.y + cx, cy = self.cx, self.cy + + canvas.line(((x, y), (cx, cy)), color, width=2) + + @property + def as_tuple(self): + return (self.x, self.y), (self.cx, self.cy) + + def infite_intersect(self, other: 'Line'): + line1 = self.as_tuple + line2 = other.as_tuple + x_diff = (line1[0][0] - line1[1][0], line2[0][0] - line2[1][0]) + y_diff = (line1[0][1] - line1[1][1], line2[0][1] - line2[1][1]) # Typo was here + + def det(point_a, point_b): + return point_a[0] * point_b[1] - point_a[1] * point_b[0] + + div = det(x_diff, y_diff) + if div == 0: + return None, None + d = (det(*line1), det(*line2)) + x = det(d, x_diff) / div + y = det(d, y_diff) / div + return x, y + + def intersect(self, other: 'Line', print_fulness=False) -> bool: + """ this returns the intersection of Line(pt1,pt2) and Line(ptA,ptB) + returns a tuple: (xi, yi, valid, r, s), where + (xi, yi) is the intersection + r is the scalar multiple such that (xi,yi) = pt1 + r*(pt2-pt1) + s is the scalar multiple such that (xi,yi) = pt1 + s*(ptB-ptA) + valid == 0 if there are 0 or inf. intersections (invalid) + valid == 1 if it has a unique intersection ON the segment """ + point_1 = self.x, self.y + point_2 = self.cx, self.cy + point_a = other.x, other.y + point_b = other.cx, other.cy + if self.vertical: + if self.y > self.cy: + if self.y >= other.y >= self.cy: + pass + else: + return False + else: + if other.y > other.cy: + if other.y >= self.y >= other.cy: + pass + else: + return False + det_tolerance = 0.0001 + x1, y1 = point_1 + x2, y2 = point_2 + dx1 = x2 - x1 + dy1 = y2 - y1 + x, y = point_a + xb, yb = point_b + dx = xb - x + dy = yb - y + det = (-dx1 * dy + dy1 * dx) + if math.fabs(det) < det_tolerance: + return False + det_inv = 1.0 / det + r = det_inv * (-dy * (x - x1) + dx * (y - y1)) + s = det_inv * (-dy1 * (x - x1) + dx1 * (y - y1)) + if print_fulness: + print('self segment', r) + print('other segment', s) + if r > 1 or s > 1: # can't be higher than 1, 1 means they are NOT intersecting + return False + if r > -0.1 and s > -0.1: # This can happen on edges, so we allow small inaccuracy + return True + return False + + def intersection(self, other: 'Line', print_fulness=False) -> (int, int): + """ this returns the intersection of Line(pt1,pt2) and Line(ptA,ptB) + returns a tuple: (xi, yi, valid, r, s), where + (xi, yi) is the intersection + r is the scalar multiple such that (xi,yi) = pt1 + r*(pt2-pt1) + s is the scalar multiple such that (xi,yi) = pt1 + s*(ptB-ptA) + valid == 0 if there are 0 or inf. intersections (invalid) + valid == 1 if it has a unique intersection ON the segment """ + point_1 = self.x, self.y + point_2 = self.cx, self.cy + point_a = other.x, other.y + point_b = other.cx, other.cy + det_tolerance = 1 + x1, y1 = point_1 + x2, y2 = point_2 + dx1 = x2 - x1 + dy1 = y2 - y1 + x, y = point_a + xb, yb = point_b + dx = xb - x + dy = yb - y + det = (-dx1 * dy + dy1 * dx) + + if math.fabs(det) < det_tolerance: + return None, None + det_inv = 1.0 / det + r = det_inv * (-dy * (x - x1) + dx * (y - y1)) + s = det_inv * (-dy1 * (x - x1) + dx1 * (y - y1)) + xi = (x1 + r * dx1 + x + s * dx) / 2.0 + yi = (y1 + r * dy1 + y + s * dy) / 2.0 + if print_fulness: + print('self segment', r) + print('other segment', s) + return (round(xi), round(yi)), round(r, 4), round(s, 4) + + def is_between(self, point: 'Point'): + pt1 = self.p1 + pt2 = self.p2 + cross_product = (point.y - pt1.y) * (pt2.x - pt1.x) - (point.x - pt1.x) * (pt2.y - pt1.y) + + # compare versus epsilon for floating point values, or != 0 if using integers + if abs(cross_product) > math.e: + return False + + dot_product = (point.x - pt1.x) * (pt2.x - pt1.x) + (point.y - pt1.y) * (pt2.y - pt1.y) + if dot_product < 0: + return False + + squared_length_ba = (pt2.x - pt1.x) * (pt2.x - pt1.x) + (pt2.y - pt1.y) * (pt2.y - pt1.y) + if dot_product > squared_length_ba: + return False + + return True + + def on_line(self, point: 'Point'): + if self.vertical: + if almost_equals(self.p1.x, point.x): + return True + else: + if almost_equals(self.p1.y, point.y): + return True + return False + + def __contains__(self, other: {'Line', 'Point'}): + if type(other) == Line: + if self.vertical == other.vertical: + return False + return self.intersect(other) + if type(other) == Point: + return self.is_between(other) + pass + + def on_same_line(self, other: 'Line'): + if other.vertical != self.vertical: + return False + if self.vertical: + return self.x == other.x + else: + return self.y == other.y + + def __eq__(self, other: 'Line'): + return self.on_same_line(other) + + def corner(self, other: 'Line'): + if self.p1 == other.p1 or self.p2 == other.p2 or self.p1 == other.p2: + return True + return False + + def connected(self, other: 'Line'): + return other.p1 in self or other.p2 in self + + def parallel(self, other: 'Line'): + return self.vertical == other.vertical + + def on_corners(self, other: 'Point'): + return other == self.p1 or other == self.p2 + + def test_intersection(self, other: 'Line'): + """ prints out a test for checking by hand... """ + print('Testing intersection of:') + print('\t', self) + print('\t', other) + result = self.intersection(other, True) + print("\t Intersection result =", Point(result[0])) + print() + + +class Cell: + """P1-------P2 + | | + | | + | | + | | + P4-------P3 + """ + try: + font = ImageFont.truetype('arial', size=9) + except: + font = ImageFont.load_default() + + def __init__(self, p1, p2, p3, p4): + self.p1: Point = p1 + self.p2: Point = p2 + self.p3: Point = p3 + self.p4: Point = p4 + self.text = '' + self.words = [] # type: List[str] + + def __repr__(self): + return 'Cell <"{}"> '.format(self.text.replace('\n', ' ')) + + def get_text(self): + return ''.join(map(itemgetter('text'),self.words)) + + @property + def clean_text(self) -> str: + return self.text.replace('\n', ' ') + + def __hash__(self): + return hash(self.text) + hash(self.as_tuple) + + def on_same_line(self, other: 'Cell'): + return self.p1.on_same_line(other.p1) + + def on_same_row(self, other: 'Cell'): + return self.p1.y == other.p1.y + + @property + def as_tuple(self): + return self.p1.as_tuple, self.p2.as_tuple, self.p3.as_tuple, self.p4.as_tuple + + def __eq__(self, other: 'Cell'): + if self.p1 == other.p1 and self.p2 == other.p2 and self.p3 == other.p3 and self.p4 == other.p4: + return True + if self.p1 == other.p2 and self.p2 == other.p3 and self.p3 == other.p4 and self.p4 == other.p1: + return True + if self.p1 == other.p3 and self.p2 == other.p4 and self.p3 == other.p1 and self.p4 == other.p2: + return True + if self.p1 == other.p4 and self.p2 == other.p1 and self.p3 == other.p2 and self.p4 == other.p3: + return True + + @property + def center(self): + x = [p.x for p in [self.p1, self.p2, self.p3, self.p4]] + y = [p.y for p in [self.p1, self.p2, self.p3, self.p4]] + centroid = Point(sum(x) / 4, sum(y) / 4) + return centroid + + def draw(self, canvas: ImageDraw.ImageDraw, color='black', width=1, text_color='black'): + + # canvas.rectangle((self.p1.as_tuple, self.p3.as_tuple), outline=color,) + canvas.line((self.p1.as_tuple, self.p2.as_tuple), color, width) + canvas.line((self.p2.as_tuple, self.p3.as_tuple), color, width) + canvas.line((self.p3.as_tuple, self.p4.as_tuple), color, width) + canvas.line((self.p4.as_tuple, self.p1.as_tuple), color, width) + if self.text: + canvas.text((self.p1.x + 3, self.p1.y + 3), self.text, fill=text_color, font=self.font) + + def print_cell(self): + buffer = '' + longest = max([len(word) for word in self.text.split("\n")]) + buffer += '┼' + "─" * longest + '┼\n' + for text_line in self.text.split('\n'): + buffer += "│" + text_line + ' ' * (longest - len(text_line)) + buffer += "│\n" + buffer += '┼' + "─" * longest + '┼\n' + print(buffer) + + def point_inside_polygon(self, point: 'Point', include_edges=True): + """ + Test if point (x,y) is inside polygon poly. + poly is N-vertices polygon defined as + [(x1,y1),...,(xN,yN)] or [(x1,y1),...,(xN,yN),(x1,y1)] + (function works fine in both cases) + Geometrical idea: point is inside polygon if horizontal beam + to the right from point crosses polygon even number of times. + Works fine for non-convex polygons. + """ + x, y = point.as_tuple + x1, y1 = self.p1.as_tuple + x2, y2 = self.p3.as_tuple + return x1 < x < x2 and y1 < y < y2 + + +class Table: + + def __init__(self, cells: List[Cell], skeleton: List[List[Cell]], ugly_table: List[List[str]], words, canvas=None): + self.cells = cells + self.canvas = canvas + self.words = words + self.skeleton = skeleton + self.ugly_table = ugly_table + self.global_map = {} + + def build_table(self): + for y, (text_row, skeleton_row) in enumerate(zip(self.ugly_table, self.skeleton)): + self.global_map[y] = {} + for x, (text, cell) in enumerate(zip(text_row, skeleton_row)): + for t_cell in self.cells: + if t_cell.point_inside_polygon(cell.center): + t_cell.text += text if text else '' + self.global_map[y][x] = t_cell + + processed_cells = [] + for cell in tqdm(self.cells, desc='Analyzing cells', unit='cells'): + if cell in processed_cells: + continue + in_words = list(filter(lambda char: cell.point_inside_polygon( + Point(char['x0'], char['top'])), self.words)) + cell.words = in_words + processed_cells.append(cell) + + if self.canvas: + for cell in self.cells: + # print(cell.get_text()) + cell.draw(self.canvas) + + def get_col(self, col_id) -> List[Cell]: + col = [] + for row in self.global_map.values(): + col.append(row[col_id]) + return col + + def get_row(self, row_id) -> List[Cell]: + return list(self.global_map[row_id].values()) + + def get_cell(self, x, y) -> Cell: + return self.global_map[y][x] + + def get_cell_span(self, cell): + temp = {} + for row_id, row in self.global_map.items(): + + for col_id, t_cell in row.items(): + if t_cell == cell: + if not temp.get(row_id, False): + temp[row_id] = {} + temp[row_id][col_id] = True + row_span = len(temp) + col_span = len(list(temp.values())[0]) + return row_span, col_span + + +class TableExtractor: + + def __init__(self, path): + self.pdf = pdfplumber.open(path) + self.draw = False + self.debug = False + + @staticmethod + def filter_lines(lines: List[Line]): + new_lines = [] + lines = list(set(lines)) + la = new_lines.append + for line1 in tqdm(lines, desc='Filtering lines', unit='lines'): + if line1 in new_lines: + continue + la(line1) + new_lines = list(set(new_lines)) + return new_lines + + @staticmethod + def add_skeleton_points(points, line): + points.append(line.p1) + points.append(line.p2) + + def build_skeleton(self, lines): + skeleton_points = [] + skeleton = [] + temp_point = Point(0, 0) + temp_point.down = temp_point.up = temp_point.left = temp_point.right = True + vertical = list(filter(lambda l: l.vertical, lines)) + horizontal = list(filter(lambda l: not l.vertical, lines)) + for line1 in tqdm(vertical, desc='Building table skeleton', unit='lines'): + sys.stdout.flush() + if line1.length < 3.0: + continue + self.add_skeleton_points(skeleton_points, line1) + for line2 in horizontal: + if line1 == line2: + continue + self.add_skeleton_points(skeleton_points, line2) + if line1.infite_intersect(line2): + p1 = Point(line1.infite_intersect(line2)) + if p1 not in skeleton_points: + skeleton_points.append(p1) + + for n, p in enumerate(skeleton_points): + skeleton_points[n].copy(temp_point) + if p == p1: + p1.copy(p) + skeleton_points[n] = p1 + skeleton_points = list(set(skeleton_points)) + sorted_y_points = sorted(skeleton_points, key=lambda other: other.y) + for p1 in tqdm(sorted_y_points, desc='Building skeleton cells', unit='point'): + p2 = p1.get_right(skeleton_points) + if p2: + p3 = p2.get_bottom(skeleton_points, right=True) + p4 = p1.get_bottom(skeleton_points, left=True) + if p3 and p4: + cell = Cell(p1, p2, p3, p4) + if cell not in skeleton: + skeleton.append(cell) + else: + continue + return skeleton_points, skeleton + + @staticmethod + def skeleton_to_2d_table(skeleton: List[Cell]) -> List[List[Cell]]: + rows = [] + for cell in tqdm(skeleton, desc='Analyzing cell positions', unit='cells'): + row = tuple(sorted(filter(lambda c: cell.on_same_row(c), skeleton), key=lambda c: c.p1.x)) + rows.append(row) + rows = list(sorted(list(set(rows)), key=lambda c: c[0].p1.y)) + rows = [list(row) for row in rows] + return rows + + def parse_page(self, page_n): + if self.debug: + print('Parsing page', page_n) + page = self.pdf.pages[page_n] + if self.debug: + print('Rendering page') + + if self.debug: + print('Finding tables') + tables = TableFinder(page, {'snap_tolerance': 3, 'join_tolerance': 3}) + if self.debug: + print('Found', len(tables.tables), 'tables') + beaut_tables = [] + if self.draw: + p_im = page.to_image(resolution=100) + p_im.draw_lines(page.lines) + p_im.save('page-{}-lines.png'.format(page_n + 1)) + if len(tables.tables) > 5: + return [] + for n, table in enumerate(tables.tables): + if self.draw: + p_im.reset() + im = Image.new('RGB', (page.width, page.height), (255,) * 3) + canvas = ImageDraw.ImageDraw(im) + ugly_table = table.extract() + lines = [] # type: List[Line] + cells = [] # type: List[Cell] + for cell in tqdm(table.cells, desc='Parsing cells', unit='cells'): + # p_im.draw_rect(cell) + x1, y1, x2, y2 = cell + p1 = Point(x1, y1) + p1.right = True + p1.down = True + p2 = Point(x2, y1) + p2.left = True + p2.down = True + p3 = Point(x2, y2) + p3.up = True + p3.left = True + p4 = Point(x1, y2) + p4.up = True + p4.right = True + line1 = Line(p1, p2) + line2 = Line(p2, p3) + line3 = Line(p3, p4) + line4 = Line(p4, p1) + lines.append(line1) + lines.append(line2) + lines.append(line3) + lines.append(line4) + cell = Cell(p1, p2, p3, p4) + cells.append(cell) + + # for line in lines: + # p_im.draw_line(line.as_tuple) + lines = self.filter_lines(lines) + # for line in lines: + # line.draw(canvas, color='green') + if self.draw: + p_im.save('page-{}-{}_im.png'.format(page_n + 1, n)) + im.save('page-{}-{}.png'.format(page_n + 1, n)) + skeleton_points, skeleton = self.build_skeleton(lines.copy()) + if not skeleton_points: + continue + skeleton = self.skeleton_to_2d_table(skeleton) + + # for p in points: + # p.draw(canvas) + + beaut_table = Table(cells, skeleton, ugly_table, page.extract_words()) + beaut_table.build_table() + if self.draw: + for cell in beaut_table.cells: + cell.draw(canvas) + if self.debug: + print('Saving rendered table') + if self.draw: + p_im.save('page-{}-{}_im.png'.format(page_n + 1, n)) + im.save('page-{}-{}.png'.format(page_n + 1, n)) + if self.draw: + canvas.rectangle((0,0,page.width,page.height),fill='white') #cleaning canvas + for row_id, row in enumerate(skeleton): + for cell_id, cell in enumerate(row): + cell.text = '{}-{}'.format(row_id, cell_id) + cell.draw(canvas, color='green',text_color='red') + im.save('page-{}-{}-skeleton.png'.format(page_n + 1, n)) + beaut_tables.append(beaut_table) + + return beaut_tables + + +# def pdfplumber_table_to_table(): + + +if __name__ == '__main__': + # datasheet = DataSheet(r"D:\PYTHON\py_pdf_stm\datasheets\stm32L\stm32L431\stm32L431_ds.pdf") + # pdf_interpreter = PDFInterpreter(r"/mnt/d/PYTHON/py_pdf_stm/datasheets/stm32L/stm32L476/stm32L476_ds.pdf") + # pdf_interpreter = TableExtractor(r"D:\PYTHON\py_pdf_stm\datasheets\stm32L\stm32L476\stm32L476_ds.pdf") + # pdf_interpreter = PDFInterpreter(r"/mnt/d/PYTHON/py_pdf_stm/datasheets/KL/KL17P64M48SF6_ds.pdf") + pdf_interpreter = TableExtractor(r"/Users/richardlee/Downloads/WorkforceUtilizationSummaryReportApril2019.pdf") + # pdf_interpreter = PDFInterpreter(r"D:\PYTHON\py_pdf_stm\datasheets\KL\KL17P64M48SF6_ds.pdf") + pdf_interpreter.draw = True + pdf_interpreter.debug = True + # pdf_interpreter = PDFInterpreter(pdf.table_root.childs[table]) + # print(pdf_interpreter.content) + # tables = pdf_interpreter.parse_page(5) + tables = pdf_interpreter.parse_page(16) + print(tables) + # pdf_interpreter.parse_page(1) + # pdf_interpreter.save() + # pdf_interpreter.table.print_table() \ No newline at end of file