Skip to content

Release 0.3.0

Release 0.3.0 #75

Status Failure
Total duration 7m 51s
Artifacts

build.yml

on: push
Matrix: pingora
Fit to window
Zoom out
Zoom in

Annotations

5 errors
pingora (nightly)
Process completed with exit code 101.
pingora (1.72)
The job was canceled because "nightly" failed.
pingora (1.72)
The operation was canceled.
pingora (1.79)
The job was canceled because "nightly" failed.
pingora (1.79)
The operation was canceled.