Skip to content

Add error log when attempting to upgrade #79

Add error log when attempting to upgrade

Add error log when attempting to upgrade #79

Triggered via push July 15, 2024 16:30
Status Failure
Total duration 7m 31s
Artifacts

build.yml

on: push
Matrix: pingora
Fit to window
Zoom out
Zoom in

Annotations

5 errors
pingora (nightly)
Process completed with exit code 101.
pingora (1.72)
The job was canceled because "nightly" failed.
pingora (1.72)
The operation was canceled.
pingora (1.79)
The job was canceled because "nightly" failed.
pingora (1.79)
The operation was canceled.