-
Notifications
You must be signed in to change notification settings - Fork 0
ItEr75S21AdministrationTests
Jeroen Baten edited this page Mar 9, 2018
·
1 revision
TWiki> LibrePlan Web>ItEr75S21AdministrationTests (03 Jan 2012, JavierMoran)EditAttach
Story summary | Administration tests |
Iteration | ItEr75week25To52 |
FEA | ItEr75S21AdministrationTests |
Story Lead | |
Next Story | |
Passed acceptance test | No |
Acceptance Criteria
Additional Specification Comments
Implementation Notes
Navalplan Configuration tests:
- 1 - Change Login checkbox
- 2 - Change Checkboxes of Generate code for all the elements
- 3 - Change perspectives of all elements
- 4 - Check login form
- 5 - Check perspective is visible
- 6 - Check that the code is not auto generated in all the elements
- 7 - Change configuration like default configuration
- 8 - Change default Calendar
- 8.1 - Create a new calendar
- 8.2 - Change the configuration
- 8.3 - Check Calendar in Workers
- 8.4 - Check Calendar in Projects
- 8.5 - Change the calendar configuration like default configuration
- 8.6 - Delete calendar
Calendar tests:
- 1 - Create a new Calendar
- 2 - Create a Calendar with duplicate type (it should be a failure)
- 3 - Create a Calendar with empty type (it should be a failure)
- 4 - Create a derived calendar
- 5 - Edit the Calendar
- 6 - Assign the son calendar
- 6.1 - Create a worker with the assigned calendar
- 6.2 - Try to delete the assigned calendar (it should be a failure)
- 6.3 - Delete the worker
- 7 - Assign the child calendar to a project
- 7.1 - Create a project with the assigned calendar
- 7.2 - Try to delete the assigned calendar (it should be a failure)
- 7.3 - Delete the project
- 8 - Try to delete the parent calendar (it should be a failure)
- 9 - Delete the son calendar
- 10 - Delete the parent Calendar
Material tests:
- 1 - Create a new Material
- 2 - Create a Material without any category selected
- 3 - Create a material with empty description (it should be a failure)
- 4 - Edit a Material
- 5 - Assign a material in a project
- 5.1 - Create a project
- 5.2 - Assign the material
- 5.3 - Try to delete the assigned material
- 5.4 _ Delete the calendar
- 6 - Delete Material
Cost category tests:
- 1 - Create a new Cost Category
- 1.1 - Create a work hour data type
- 2 - Create a Cost Category with duplicate type (it should be a failure)
- 3 - Create a Cost Category with empty type (it should be a failure)
- 4 - Edit a Cost Category
- 5 - Delete Cost Category
- 5.1 - Delete the work hour data type
Quality form tests:
- 1 - Create a new Quality Form
- 2 - Create a Quality Form with duplicate name (it should be a failure)
- 3 - Create a Quality Form with empty type (it should be a failure)
- 4 - Create a Quality Form with duplicate items (it should be a failure)
- 5 - Edit the Quality Form
- 6 - Assign this Quality form to a project
- 6.1 - Create a project
- 6.2 - Assign it
- 6.3 - TRY TO DELETE IT(PENDING OF A BUG)
- 6.4 - Delete the project
- 6 - Delete the Quality Form
User tests:
- Accounts included tests:
- 1 - Create a new Account
- 2 - Create other user with same password
- 3 - Do a login with this new Account
- 4 - Check the role
- 5 - Create a Account with duplicate type (it should be a failure)
- 6 - Create a Account with empty type (it should be a failure)
- 7 - Create a new Account with two different passwords (it should be a failure)
- 8 - Edit a Account
- 9 - Do a login with this new Account
- 10 - Check the role
- 11 - Check the no user no pass
- 12 - Check pass without user
- 13 - Check the user no pass
- 14 - Check fake pass and user
- 15 - Delete both Accounts
- Profile Included tests
- 1 - Create a new Profile
- 2 - Create a Profile with duplicate type (It should be a failure)
- 3 - Create a Profile with empty type (It should be a failure)
- 4 - Create a Profile with duplicate name (It should be a failure)
- 5 - Edit a Profile
- 6 - Assign this profile
- 6.1 - Create a new Account with this profile
- 6.2 - Try to delete the profile
- 6.3 - Delete the Account
- 6 - Delete Profile
Delay Causes
Final or Pending Considerations
- Try to delete a quality form, it's pending of a bug
%RPSHOWGITCOMMITS%
Tasks | Est | Spent | To do | Risk | Reviewer | Developer | Task Name | Start Date | Est End Date | End Date |
---|---|---|---|---|---|---|---|---|---|---|
Task | 8 | 15 | 0 | Low | JavierMoran | PabloFernandez | User tests | |||
Task | 8 | 15 | 0 | Low | JavierMoran | PabloFernandez | Cost categories tests | |||
Task | 8 | 10 | 0 | Low | JavierMoran | PabloFernandez | Materials tests | |||
Task | 8 | 24 | 0 | Low | JavierMoran | PabloFernandez | Configuration |
User | Spent in XpTracker | Spent in phpReport | Ok? |
---|---|---|---|
PabloFernandez | 64 | 0 | |
Total | 64 | 0 |
Copyright (c) by the contributing authors. All material on this collaboration platform is the property of the contributing authors.