Story summary Tests for Scheduling
Iteration ItEr75week25To52
FEA ItEr75S26SchedulingTests
Story Lead  
Next Story  
Passed acceptance test No

Acceptance Criteria

Additional Specification Comments

Implementation Notes

Tests included about templates:

  • 1 - Create a Project
  • 2 - Create a Project template
  • 3 - Assign the template
  • 4 - Check Assigned project template
  • 5 - Create a task tree
  • 6 - Create a Template about the current Task tree
  • 7 - Assign the template
  • 8 - Check Assigned task template
  • 9 - Try to delete assigned templates
  • 10 - Delete all required elements

Tests included to check the correct performance of the criteria in project planning:

  • 1 - Create a Criterion
  • 2 - Create a Calendar
  • 3 - Create a Worker
  • 4 - Assign elements to a worker
    • 4.1 - Assign Criterion
    • 4.2 - Assign Calendar (Incorrect dates)
  • 5 - Create a project
  • 6 - Create a Task
  • 7 - Try to assign the worker with the incorrect calendar
  • 8 - Assign elements to a worker
    • 8.1 - Assign Criterion (Incorrect dates)
    • 8.2 - Assign Calendar
  • 9 - Allocate criterion into the first task
  • 10 - Check Project planning filter
  • 11 - Delete all required elements

Tests included to check the correct performance of the labels in project planning:

  • 1 - Create a Label
  • 2 - Create a Project
  • 3 - Create two tasks
  • 4 - Assign the label to the first of the tasks
  • 5 - Check that the label is showed when label button is pressed
  • 6 - Filter the showed task by the the assigned label
  • 7 - Check that just the task with the assigned label lis showed
  • 8 - Delete required elements

-- PabloFernandez - 13 Sep 2011

 

Delay Causes

Final or Pending Considerations

 

Commits

%RPSHOWGITCOMMITS%

Tasks in this story

Tasks Est Spent To do Risk Reviewer Developer Task Name Start Date Est End Date End Date
Task 40 40 0 Low     Implementation      

Total Hours in this Story

User Spent in XpTracker Spent in phpReport Ok?
  40 0 ALERT!
Total 40 0 ALERT!