Notifications
You must be signed in to change notification settings - Fork 5
/
Copy pathsupp-doc-list.tex
70 lines (68 loc) · 2.79 KB
/
supp-doc-list.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
%\chapter{Supporting Documents}
% AH 12/30/11: Since I'm pulling this in as a chapter in vol 1 and as a subsection in section 1.1 of vols 2-6, I'm taking the chapter heading out and putting it directly into the file that inputs all the content of volume 1
A host of information related to the CDR is available in a set of supporting documents. Detailed information on risk analysis and mitigation, value engineering, ES\&H, costing, project management and other topics not directly in the design scope can be found in these documents, listed in
Table~\ref{table:cd-1-doc-list}. Each document is numbered and stored in LBNE's document database, accessible via a username/password combination provided by the Project. Project documents stored in this database are made available to internal and external review committees through Web sites developed to support individual reviews.
%\fixme{Either need descriptions, or get rid of Description column; need to finalize table. AH}
\begin{center}
\begin{longtable}{|p{10cm}|p{4cm}|} %{|l|l|l|}
\caption{LBNE CD-1 Documents}
\label{table:cd-1-doc-list} \\
\multicolumn{1}{p{10cm}}{\textbf{Title}} & % 2/23/12 AH tried upping col width from 5 and 2.
\multicolumn{1}{p{4cm}}{\textbf{LBNE Doc Number(s)}} \\
\hline
\endfirsthead
Acquisition Plan & 5329 \\
\hline
Alternatives Analysis & 4382 \\
\hline
Case Study Report; Liquid Argon TPC Detector & 3600 \\
\hline
Configuration Management Plan & 5452 \\
\hline
DOE Acquisition Strategy for LBNE & 5442 \\
\hline
Integrated Environment, Safety and Health Management Plan & 4514 \\
\hline
LAr-FD Preliminary ODH Analysis & 2478 \\
\hline
Global Science Objectives, Science Requirements and Traceback Reports & 4772 \\
\hline
Preliminary Hazard Analysis Report & 4513 \\
\hline
Preliminary Project Execution Plan & 5443 \\
\hline
Preliminary Security Vulnerability Assessment Report & 4826 \\
\hline
Project Management Plan & 2453 \\
\hline
Project Organization Chart & 5449 \\
\hline
Quality Assurance Plan & 2449 \\
\hline
Report on the Depth Requirements for a Massive Detector at Homestake & 0034 \\
\hline
Requirements, Beamline & 4835 \\
\hline
Requirements (Parameter Tables), Far Detector & 3747 (3383)\\
\hline
Requirements, Far Site Conventional Facilities & 4408 \\
\hline
Requirements, Near Detectors & 5579 \\
\hline
Requirements, Near Site Conventional Facilities & 5437 \\
\hline
Risk Management Plan & 5749 \\
\hline
Value Engineering Report & 3082 \\
\hline
Work Breakdown Structure (WBS) & 4219 \\
\hline
%Cost Book List, Beamline & http://lbne.fnal.gov/reviews/beam-costbooklist.shtml \\
%\hline
%Cost Book List, Near Detector & http://lbne.fnal.gov/reviews/nd-costbooklist.shtml \\
%\hline
%Cost and Schedule documents, LAr-FD & 5131 \\
%\hline
%\end{tabular}
\end{longtable}
\end{center}