Build: Bump daft from 0.5.21 to 0.6.4 #286
python-ci.yml
on: pull_request
Matrix: integration-test
Matrix: lint-and-test
Annotations
7 errors
|
integration-test (3.10)
Process completed with exit code 2.
|
|
integration-test (3.9)
The operation was canceled.
|
|
integration-test (3.9)
The strategy configuration was canceled because "integration-test._3_10" failed
|
|
integration-test (3.12)
The operation was canceled.
|
|
integration-test (3.12)
The strategy configuration was canceled because "integration-test._3_10" failed
|
|
integration-test (3.11)
The operation was canceled.
|
|
integration-test (3.11)
The strategy configuration was canceled because "integration-test._3_10" failed
|