You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
The video of the call is available here
The forum discussion is available here
Agenda
Status, current goal
Updates
Next week
Discussion
Fee on Eth-Connector
PA onboarding
Status, current goal
2 tesntet deployments, Bridge FE and CLI guide are operational, no major issues reported. At the moment we're focusing on testing, CI, monitoring, upgrading the bridge. Bug bounties are postponed to Q2. Mainnet release date is not changed.
Planned items:
AS: Docs on the bridge usage, publish the upgradability plan, EVM
MF: Finish CI, enable all tests in Nayduck, testing upgradability
EK: Review of existing code & working on Bridge 2.0
Pros: makes a user interaction with the bridge condensed into a single transaction; provides a safe way for a user without NEAR account to transfer ETH directly into the EVM.
Cons: relaying logic is not as a part of this connector but rather separate thing; relaying fee fixed in the beginning of the transfer might not account for the the rate slippage for 7 min
Decision: to discuss more. See the discussion here
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
The video of the call is available here
The forum discussion is available here
Agenda
Status, current goal
2 tesntet deployments, Bridge FE and CLI guide are operational, no major issues reported. At the moment we're focusing on testing, CI, monitoring, upgrading the bridge. Bug bounties are postponed to Q2. Mainnet release date is not changed.
Planned items:
Done:
Weekly update
Alex Shevchenko
Marcelo Fornet
Kirill Abramov
Pierre-Alain Ouvrard
Next week
Discussion
Beta Was this translation helpful? Give feedback.
All reactions