You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
T8.5 MM can only be run through the hyperbolic projector, despite being available much earlier than hyperbolic projector. Additionally, the T8.5 miner data for dulysite is run through the hyperbolic projector to make it, NOT the actualizer, whereas the miner data for darmstadite is run through the actualizer.
The stabilized T8.5 does go through the advanced II projector, which I imagine is intended for the non-stab versions.
Reproduction steps
Relevant log output
The text was updated successfully, but these errors were encountered:
Issue Summary
T8.5 MM can only be run through the hyperbolic projector, despite being available much earlier than hyperbolic projector. Additionally, the T8.5 miner data for dulysite is run through the hyperbolic projector to make it, NOT the actualizer, whereas the miner data for darmstadite is run through the actualizer.
The stabilized T8.5 does go through the advanced II projector, which I imagine is intended for the non-stab versions.
Reproduction steps
Relevant log output
The text was updated successfully, but these errors were encountered: