Skip to content

Latest commit

 

History

History
142 lines (111 loc) · 5.44 KB

ibat-beta.md

File metadata and controls

142 lines (111 loc) · 5.44 KB

IBAT redevelopment

Aug 2018

IBAT 3.0 - what's new

user experience overhaul

note: navigate not by obscure and cryptic buttons. The best design is no design and no manual. feel natural!

project

as point, polyline and polygon

note: 1) more than just points - but polylines and polygons 2) adding your entire portfolio by CSV

dash board

project and project portfolio

note: 1) geographically accurate buffers, globe 2) improved species overlap methodology RL via API

enhanced reporting

note: 1) more use-able format (PDF+CSV) 2) customisable features 3)

selective download

note: 1) wholesale download 2) customised download for ROI 3) (long term) web services and APIs

web service and API

Beta release - where are we now

<iframe height="680px" width="100%" data-src="https://www.youtube.com/embed/Q9x2VFjJzDY?&autoplay=1&controls=0" frameborder=0 allowfullscreen></iframe> note: enabled by our excellent bioinformatic development team! Challenging timeline - but we are committed to delivering a great product!

alpha release

  • complete user journey
  • complete design of pages
  • database architecture
  • prototype main functions
  • project creation
  • project, and portfolio views
  • partial styled user interface
  • geospatial engine
  • report data generator note: alpha: user journey; UX/UI design; database architecture; prototyping main functionalities (functional skeletons);

post alpha plan

  • additional data and analytics for reports
  • report generator
  • country profile
  • data download
  • proximity report template
  • IFC PS6 report template
  • freshwater report template
  • user management system
  • content management system
  • data import and user data migration
  • unit, integration, user acceptance testing note: beta (meat + usable prototype): reporting, download, profiles, data import, migration from old system, unit testing, integration testing, user acceptance testing

beta highlight

  • web maps: WebGLJS
  • report designs
  • proximity report complete workflow
  • market pages
  • responsiveness

IBAT 3.0 ß

http://ibat.ibat_staging.linode.unep-wcmc.org

post beta plan

  • Data filters reworks on the backend, per consultation
  • PS6 connecting design and implementation
  • FW design
  • Reports: custom, EIB, GRI, design and implementation
  • User management system
  • Data download
  • Country profile

post beta plan

  • Freshwater report (Sprint 10, 11)
  • EIB report (Sprint 11, 12, 13)
  • Custom report (Sprint 12, 13)
  • GRI report (Sprint 11, 12)
  • User management system (Sprint 11, 12)
  • User migration (Sprint 12)
  • Testing (Final sprint - 2 weeks)

Dates

  • Launch date: 25 Oct
  • user acceptance test: 2 week ahead of time
  • around the same time as UAT, have a final show-and-tell

thank you

post alpha plan

  • additional data and analytics for reports
  • report generator
  • country profile
  • data download
  • proximity report template
  • IFC PS6 report template
  • freshwater report template
  • user management system
  • content management system
  • data import and user data migration
  • unit, integration, user acceptance testing
  • EIB report template
  • Improved map rendering
  • Data filter re-worked
  • Design implementations (Marketing pages looks great!)