You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Right now, wzrd.in proper is running what's on the "production" branch, which has diverged significantly from master. We need to do this upgrade. Proposed steps:
QA - Someone should point a requirebin instance at it and try out some common scenarios, so we're confident this will work
Install docker on the box
Install nvm on the box
Install the new instance of wzrdin that runs against docker in parallel using node 6 in nvm
Flip the port with nginx
Tear down the old instance
If you want to help with this, you can either take on some of the QA work, or you can help flesh out the deploy plan. We would ideally want 2 or 3 of us and a weekend, I think.
The text was updated successfully, but these errors were encountered:
Right now, wzrd.in proper is running what's on the "production" branch, which has diverged significantly from master. We need to do this upgrade. Proposed steps:
If you want to help with this, you can either take on some of the QA work, or you can help flesh out the deploy plan. We would ideally want 2 or 3 of us and a weekend, I think.
The text was updated successfully, but these errors were encountered: