You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
A note while I'm thinking of it: we should capture any infrastructure costs as part of our hand-off for posterity. It's possible to loose some of the information during the hand-off if accounts are transferred, or if we look back after cost retention windows.
As we discussed in 1:1 a while back, I also added narrative to the top of the page explaining how to make use of the checklist and a reminder that the steps do not need to happen in sequence. Can you take a look and let me know if you would add anything to that?
Per our meeting on 6/27/24 (notes here), the ask here is to writeup a narrative description of some of the steps in these handoff checklists:
CalHR: https://docs.google.com/spreadsheets/d/1YRBzOH9wS-CgqCq6P8aPNy6Yu-KjHigOPmweAcmX79s/edit?gid=0#gid=0
CARB: https://docs.google.com/spreadsheets/d/1KP1JlbWmq4B5ItqrRTqmGbNJFfhPl2IwJge_H9P-9rU/edit?gid=0#gid=0
This can happen after Caltrans project ends during our documentation/cleanup period.
Note: write up the narrative descriptions within Coda along with the handoff checklist.
The text was updated successfully, but these errors were encountered: