You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
What details are necessary for understanding the specific work or request tracked by this issue?
The EDM team is deprecating the 'Find a Yellow Ribbon school' tool, and moving all data from the Yellow Ribbon tool into the GI Bill school comparison tool.
Entry point to REMOVE
Education hub page - Remove
Placement description: Education hub page 'More information and resources' section
Link label: Find a Yellow Ribbon school
Who will update (IA, content, product team): Content
When will this entry point go live (at launch? After staged rollout? after some designated time?): At launch
Notes: Remove both the header link and the explanation text for the Yellow Ribbon tool from the section. Consider updating the description of the Comparison Tool to include a mention that the Yellow Ribbon data is now available here, since this is a change to a somewhat popular program.
Crosslinks
Identify all crosslinks to the Yellow Ribbon tool, and modify them to direct visitors to the new location of the information. Or remove the link if its no longer applicable in that context. The new location of the Yellow Ribbon data will be a sub-page of the current https://www.va.gov/education/gi-bill-comparison-tool URL, since the EDM team is moving data around within that tool as well - see the WEAMS migration content ticket and IA Spec for details.
Tasks
IA works with product team and CAIA writer to identify entry points and suggested crosslinks
IA documents plan in IA Spec in the IA Spec folder on github
IA adds the IA spec to the intake ticket for the product team, tags Lily/Megan
Lily ensures IA spec is included in content entry point ticket for Megan
Lily confirms whether work requires a writer (or if writer is already involved), or SME review. Criteria: Any surrounding content change besides replacing PDF link with online form link
Content writer notifies Megan/Chelsea when it’s time to implement
Once a product is launched to 100% of users (staged rollout or not), content will take out the widget and put the rest of the entry points/crosslinks in in Drupal and publish.
Publish
Megan or Chelsea will add Kristin or Jenny as an assignee to the entry point ticket
Content will let IA know final decisions on crosslinks and why, so IA can document
IA will check live site for accuracy of implementation, compared to IA spec
Kristin or Jenny will update sitemaps with color coding to show product/change was implemented
Acceptance Criteria
Updated pages are live
IA review complete
Sitemaps update
How to configure this issue
Attached to a Milestone (when will this be completed?)
Attached to an Epic (what body of work is this a part of?)
Labeled with Team (product support, analytics-insights, operations, service-design, Console-Services, tools-fe)
Labeled with Practice Area (backend, frontend, devops, design, research, product, ia, qa, analytics, contact center, research, accessibility, content)
Labeled with Type (bug, request, discovery, documentation, etc.)
The text was updated successfully, but these errors were encountered:
CAIA Internal Collaboration
Related tickets:
CAIA Intake
IA Spec
IA Tracker ticket
Issue Description
What details are necessary for understanding the specific work or request tracked by this issue?
The EDM team is deprecating the 'Find a Yellow Ribbon school' tool, and moving all data from the Yellow Ribbon tool into the GI Bill school comparison tool.
Entry point to REMOVE
Education hub page - Remove
Crosslinks
Identify all crosslinks to the Yellow Ribbon tool, and modify them to direct visitors to the new location of the information. Or remove the link if its no longer applicable in that context. The new location of the Yellow Ribbon data will be a sub-page of the current https://www.va.gov/education/gi-bill-comparison-tool URL, since the EDM team is moving data around within that tool as well - see the WEAMS migration content ticket and IA Spec for details.
Tasks
Acceptance Criteria
How to configure this issue
product support
,analytics-insights
,operations
,service-design
,Console-Services
,tools-fe
)backend
,frontend
,devops
,design
,research
,product
,ia
,qa
,analytics
,contact center
,research
,accessibility
,content
)bug
,request
,discovery
,documentation
, etc.)The text was updated successfully, but these errors were encountered: