Hour reporting

Week 1

Date Weekday Hours What was done
25.7. Wed 4 h Began work on the design doc, research
26.7. Thu 2 h Worked on the design doc
27.7. Fri 2 h Finished the design doc, first weekly report

Week 2

Date Weekday Hours What was done
30.7. Mon 4 h Revised and reviewed A*
31.7. Tue 6 h Research, implemented diagonal movement
1.8. Wed 8 h Research, implemented neighbour pruning rules for JPS
2.8. Thu 5 h Implemented jumping for JPS -> first version of JPS
3.8. Fri 5 h Revised the first version of JPS, second weekly report

Week 3

Date Weekday Hours What was done
6.8. Mon 4 h Research: studied the paper by Sturtevant
7.8. Tue 8 h The first draft of the benchmark mode
8.8. Wed 8 h The second draft of the benchmark mode
9.8. Thu 8 h The third draft of the benchmark mode
10.8. Fri 8 h Completed the benchmark mode (first complete version)

Week 4

Date Weekday Hours What was done
13.8. Mon 8 h Tested my JPS implementation and fixed two major bugs
14.8. Tue 10 h Implemented a version of JPS without corner-cutting
15.8. Wed 8 h Implemented an option to choose whether corner-cutting is allowed
16.8. Thu 8 h Began to write the implementation document (class structure)
17.8. Fri 10 h Wrote a section on performance testing, bug fixing, merged ArrayList

Week 5

Date Weekday Hours What was done
20.8. Mon 8 h Wrote scripts to run the benchmarks & process the results (no commit)
21.8. Tue 8 h Wrote scripts to run the benchmarks & process the results (committed)
22.8. Wed 10 h Studied the results, wrote a section on performance testing
23.8. Thu 10 h Studied the results, peer review
24.8. Fri 2 h Worked on the ArrayList implementation, weekly report

Week 6

Date Weekday Hours What was done
27.8. Mon 8 h Implemented a binary heap
28.8. Tue 8 h Implemented a stack and worked with collections in general
29.8. Wed 8 h Began to write the testing document
30.8. Thu 10 h Finished the testing document
31.8. Fri 8 h Peer review, fixed a couple of bugs, weekly report

Week 7

Date Weekday Hours What was done
1.9. Sat 4 h Began to write the user guide
2.9. Sun 4 h Worked on the user guide
3.9. Mon 8 h Finished the user guide, worked on the I/O module
4.9. Tue 8 h Wrote further tests for the I/O module, worked on implementation doc
5.9. Wed 2 h Small updates to the results section
6.9. Thu 2 h Participated in the demo presentations
7.9. Fri 8 h Finished a large number of small tasks

Totals

Week Hours
1 8 h
2 28 h
3 36 h
4 44 h
5 38 h
6 42 h
7 36 h
Total 232 h