During the FIT project we discovered that the costs figures behind the electricity network calculation are out-of-date. Specifically, the operation and maintenance costs for the HV, offshore and interconnection networks are disproportionately high compared to their CAPEX. See a screenshot from an edited costs download of the II3050 2050 DEC scenario below.
The culprit here is the fixed_operation_and_maintenance_costs attribute, which is about 20x higher for e.g. the HV network compared to e.g. the lv network.
HV value of approximately €59,909 / MW output:
LV value of €3,125 / MW output:
Both costs figures were last updated 11 years ago. There is no source analysis available that backs up these figures.
Solution
Thefixed_operation_and_maintenance_costs attributes for HV, offshore and interconnection networks require updating with a contemporary source, preferably supplied by one of the TSOs.
The text was updated successfully, but these errors were encountered:
This issue has had no activity for 60 days and will be closed in 7 days. Removing the "Stale" label or posting a comment will prevent it from being closed automatically. You can also add the "Pinned" label to ensure it isn't marked as stale in the future.
KoenvanB
added
Pinned
Will never be marked as stale or auto-closed.
and removed
Stale
Issue had no activity for 60 days and will be, or has been, closed.
labels
Jul 15, 2024
During the FIT project we discovered that the costs figures behind the electricity network calculation are out-of-date. Specifically, the operation and maintenance costs for the HV, offshore and interconnection networks are disproportionately high compared to their CAPEX. See a screenshot from an edited costs download of the II3050 2050 DEC scenario below.
The culprit here is the
fixed_operation_and_maintenance_costs
attribute, which is about 20x higher for e.g. the HV network compared to e.g. the lv network.HV value of approximately €59,909 / MW output:
LV value of €3,125 / MW output:
Both costs figures were last updated 11 years ago. There is no source analysis available that backs up these figures.
Solution
The
fixed_operation_and_maintenance_costs
attributes for HV, offshore and interconnection networks require updating with a contemporary source, preferably supplied by one of the TSOs.The text was updated successfully, but these errors were encountered: