You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently first time contributor pull request submission requires
manual approval.
Enable slack notification and email notification to the team when manual
approval is required.
Fixes#47
Note rough sizings in person days are included
Required High (GA 5/10 mandatory)
(Martin) (2 pd) Deployed container images scanned and verified by Red Hat Verify that images used in chart are Red Hat certified #38 (https://issues.redhat.com/browse/HELM-53)
(Igor) (10 pd) Run test and include OCP version used for performing the checks Capture OCP version #43
(Martin) (5 pd) Add annotations to report Add annotations to the report #67
(Martin) (2pd) Report output to console for collection by partner Provide report to std out instead of a file #65
(Martin) (5 pd) Ability to define which checks are mandatory, optional, experimental (need to categorize current checks)
Required manual checks
Chart README.md includes pull secret instructions for private registries if required - will be a manual review of the PR at least for GA.Required Medium (GA 5/10 nice to have)
Required not prioritized (pots GA 5/10)
Recommended
The text was updated successfully, but these errors were encountered: