Skip to content

Latest commit

 

History

History
19 lines (14 loc) · 1.26 KB

RELEASING.md

File metadata and controls

19 lines (14 loc) · 1.26 KB

Release

The following steps should be followed to release the add-ons:

  1. Run the workflow Prepare Release Add-on indicating, with a comma separated list, the IDs of the add-ons that should be released (e.g. help, help_fr_FR). It creates a pull request updating the versions and changelogs;
  2. Merge the pull request.

After merging the pull request the Release Add-on workflow will create the tag(s), create the release(s), trigger the update of the marketplace, and create a pull request preparing the next development iterations.

Localized Resources

The resources that require localization (e.g. help pages) are uploaded to the ZAP project in Crowdin when the main add-on is released, if required (for pre-translation) the resources can be uploaded manually at anytime by running the workflow Crowdin Upload Files.

The resulting localized resources are added/updated in the repository periodically (through a workflow in the zap-admin repository).