You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
User story
GPL-555 | As LH Cherry Picking Improvement specialists (Rich, James and Danni) I want +ves on site report to have well positions and location to be simpler to use.
Who are the primary contacts for this story
Rich L
Rich C
James M
Danni W
Emma G
User story
GPL-555 | As LH Cherry Picking Improvement specialists (Rich, James and Danni) I want +ves on site report to have well positions and location to be simpler to use.
Who are the primary contacts for this story
Rich L
Rich C
James M
Danni W
Emma G
Acceptance criteria
i)
Add well position to the report which can be downloaded here: https://psd.pages.internal.sanger.ac.uk/lighthouse_reports/
Col headers
ii)
Change location barcode to match format of Tableau report eg TBD
Additional context
Limitations noted from walk through to capture current cherry picking process flow captured here: https://ssg-confluence.internal.sanger.ac.uk/x/jqsKBg (see fig 2.1)
The text was updated successfully, but these errors were encountered: