You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Commit 6eddc40 regressed test/SILPasses/globalarcopts.sil; the ARC optimizer is no longer able to eliminate a retain/release pair guarding an assignment into a project_box address. Alias analysis needs to be updated to understand project_box to fix this.
The text was updated successfully, but these errors were encountered:
Additional Detail from JIRA
md5: d611423b031c7c7d1ac917602ee7a52b
Issue Description:
Commit 6eddc40 regressed test/SILPasses/globalarcopts.sil; the ARC optimizer is no longer able to eliminate a retain/release pair guarding an assignment into a project_box address. Alias analysis needs to be updated to understand project_box to fix this.
The text was updated successfully, but these errors were encountered: