You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Expected Zapier to submit dates to Bothan using the date formatting I specified in the google sheet.
Current Behaviour (for problems)
I had a date like 1/10/2017 (yes, I know!) in Google sheet which had been formatted in the spreadsheet cell.
When this date was submitted to Bothan, it was in US date format instead. I'm not sure if this is an issue with the integration or limitation of Zapier's integration with Google Sheets
Steps to Reproduce (for problems)
Create Zap using New Row trigger
In Zap template specify column for metric and also choose to take the date from a column in the spreadsheet, rather than using "now". Use DD/MM/YYYY formatting
Save the Zap
Check the date in the data sent to Bothan it should be incorrrect
The text was updated successfully, but these errors were encountered:
Expected Behaviour
Expected Zapier to submit dates to Bothan using the date formatting I specified in the google sheet.
Current Behaviour (for problems)
I had a date like 1/10/2017 (yes, I know!) in Google sheet which had been formatted in the spreadsheet cell.
When this date was submitted to Bothan, it was in US date format instead. I'm not sure if this is an issue with the integration or limitation of Zapier's integration with Google Sheets
Steps to Reproduce (for problems)
The text was updated successfully, but these errors were encountered: