This is a tool to calculate the Levelized Cost of Electricity (LCOE) of a large and commercial nuclear power reactor. There are various options available, including default parameters, customized parameters, default design, and default scenario/region/year.
- [1] IEA projected costs of generation electricity 2020
- [2] IAEA Economic Evaluation of Alternative Nuclear Energy Systems (2014)
- [3] IEA World Energy Outlook 2022
- [4] IEA Net Zero by 2050, A Roadmap for the Global Energy Sector (2021)
- [5] Capital cost estimation for advanced nuclear power plants (2022)
For learning curve:
- [6] OECD NEA Unlocking Reductions in the Construction Costs of Nuclear (2020)
- [7] Lucid Catalyst con Energy Technology Institute: Nuclear Cost Divers Project (2020)
- Jupyter notebook application
- Controls on inputs
- MWh input
- Possibility to come back
- Reactor() class formatting and possibility to edit for regional default parameters
- Total cost for reactor, learning curve
- LTO
- Multiple option calculator (like same parameters but 3 different discount rate)
- Create table and charts
- Other technology