Skip to content

base upgrade tests on agoric-3-proposals #27450

base upgrade tests on agoric-3-proposals

base upgrade tests on agoric-3-proposals #27450

Triggered via pull request November 6, 2023 17:29
Status Cancelled
Total duration 12m 46s
Artifacts 1

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
6s
pre_check / Check preconditions and cancel previous jobs
Matrix: getting-started
Matrix: test-docker-build
set-integration-result-in-progress
9s
set-integration-result-in-progress
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

12 errors
test-docker-build (test)
Process completed with exit code 124.
test-docker-build (test)
Process completed with exit code 1.
test-docker-build (main)
The job was canceled because "test" failed.
test-docker-build (main)
The operation was canceled.
getting-started (registry/npm)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
getting-started (registry/npm)
The operation was canceled.
getting-started (registry/yarn)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
getting-started (registry/yarn)
The operation was canceled.
getting-started (registry/npx)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
getting-started (registry/npx)
The operation was canceled.
deployment-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/8476/merge' exists
deployment-test
The operation was canceled.

Artifacts

Produced during runtime
Name Size
deployment-test-results-20231106T174200 Expired
21.3 KB