Skip to content

Use a manual check for integration-test-result #53

Use a manual check for integration-test-result

Use a manual check for integration-test-result #53

Triggered via pull request September 8, 2023 03:25
Status Cancelled
Total duration 1m 24s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

integration.yml

on: pull_request
pre_check  /  Check preconditions and cancel previous jobs
6s
pre_check / Check preconditions and cancel previous jobs
Matrix: matrix-test
standalone-test
48s
standalone-test
set-integration-result-in-progress
7s
set-integration-result-in-progress
finalize-integration-result
0s
finalize-integration-result
Fit to window
Zoom out
Zoom in

Annotations

6 errors
standalone-test
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/2/merge' exists
standalone-test
The operation was canceled.
matrix-test (two)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/2/merge' exists
matrix-test (two)
The operation was canceled.
matrix-test (one)
Canceling since a higher priority waiting request for 'Integration tests-refs/pull/2/merge' exists
matrix-test (one)
The operation was canceled.