Skip to content

fix(deps): update dependency ch.qos.logback:logback-core to v1.5.13 [… #919

fix(deps): update dependency ch.qos.logback:logback-core to v1.5.13 […

fix(deps): update dependency ch.qos.logback:logback-core to v1.5.13 [… #919

Triggered via push December 20, 2024 18:30
Status Failure
Total duration 1m 4s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build (8)
Process completed with exit code 1.
build (11)
The job was canceled because "_8" failed.
build (11)
The operation was canceled.
build (17)
The job was canceled because "_8" failed.
build (17)
The operation was canceled.
build (8)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636