Skip to content

chore(deps): update dependency vite-plugin-eslint2 to v5 #3925

chore(deps): update dependency vite-plugin-eslint2 to v5

chore(deps): update dependency vite-plugin-eslint2 to v5 #3925

Triggered via pull request October 20, 2024 14:55
Status Failure
Total duration 31m 44s
Artifacts

continuous-integration.yml

on: pull_request
api-check-needed
7s
api-check-needed
e2e-check-needed
5s
e2e-check-needed
Lint: Frontend (ESLint)
34s
Lint: Frontend (ESLint)
Lint: ClientPrint (ESLint)
17s
Lint: ClientPrint (ESLint)
Lint: Print (ESLint)
20s
Lint: Print (ESLint)
Lint: API (php-cs-fixer)
36s
Lint: API (php-cs-fixer)
Tests: End-to-end build  /  Tests: End-to-end (build job)
20m 13s
Tests: End-to-end build / Tests: End-to-end (build job)
Lint: e2e (ESLint)
25s
Lint: e2e (ESLint)
Finish coveralls report
0s
Finish coveralls report
Matrix: Tests: End-to-end run / Tests: End-to-end
Waiting for pending jobs
workflow-success
3s
workflow-success
Send out CI success event
0s
Send out CI success event
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 14 warnings
Lint: Print (ESLint)
Process completed with exit code 1.
Tests: Print
Process completed with exit code 1.
Tests: End-to-end build / Tests: End-to-end (build job)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 20 minutes.
Tests: End-to-end build / Tests: End-to-end (build job)
The operation was canceled.
workflow-success
Job print-eslint failed with status failure
workflow-success
Job print-tests failed with status failure
workflow-success
Job e2e-tests-build failed with status failure
Lint: Frontend (ESLint): frontend/src/components/activity/content/layout/ContentNodeCard.vue#L157
Need to pass argument to the `::v-deep` pseudo-element
Tests: Frontend
Failed to restore: Cache service responded with 429
Lint: e2e (ESLint)
Failed to restore: Cache service responded with 429
Lint: API (php-cs-fixer)
Failed to restore: Cache service responded with 429
Tests: API
Failed to restore: Cache service responded with 429