Skip to content

chore(deps-dev): bump the npm_and_yarn group group with 2 updates (#920) #439

chore(deps-dev): bump the npm_and_yarn group group with 2 updates (#920)

chore(deps-dev): bump the npm_and_yarn group group with 2 updates (#920) #439

Triggered via push December 7, 2023 17:11
Status Failure
Total duration 6h 0m 24s
Artifacts

nodejs.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

2 errors
Build, lint, and test on Node 16.x and macOS-latest
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
Build, lint, and test on Node 16.x and macOS-latest
The operation was canceled.