Skip to content

Upgrade to be able to handle svelte 5 features #432

Upgrade to be able to handle svelte 5 features

Upgrade to be able to handle svelte 5 features #432

Re-run triggered October 30, 2024 00:33
Status Failure
Total duration 1m 0s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (16)
Process completed with exit code 1.
build (18)
The job was canceled because "_16" failed.
build (22)
The job was canceled because "_16" failed.
build (22)
The operation was canceled.
build (20)
The job was canceled because "_16" failed.
build (20)
The operation was canceled.