Skip to content

Simplify entrypoint script as per feedback. #7

Simplify entrypoint script as per feedback.

Simplify entrypoint script as per feedback. #7

Triggered via push May 19, 2024 02:10
Status Failure
Total duration 21m 18s
Artifacts 1

ci.yml

on: push
Matrix: build-install-rpm
Matrix: install-deb
Fit to window
Zoom out
Zoom in

Annotations

18 errors
Build and install a Dangerzone RPM on Fedora 40
Process completed with exit code 1.
Build and install a Dangerzone RPM on Fedora 38
The job was canceled because "_40" failed.
Build and install a Dangerzone RPM on Fedora 38
The operation was canceled.
Build and install a Dangerzone RPM on Fedora 39
The job was canceled because "_40" failed.
Build and install a Dangerzone RPM on Fedora 39
The operation was canceled.
install-deb (ubuntu-23.10, ubuntu, 23.10)
Process completed with exit code 1.
install-deb (debian-trixie, debian, trixie)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (debian-trixie, debian, trixie)
Process completed with exit code 1.
install-deb (debian-bookworm, debian, bookworm)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (debian-bookworm, debian, bookworm)
The operation was canceled.
install-deb (debian-bullseye, debian, bullseye)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (debian-bullseye, debian, bullseye)
The operation was canceled.
install-deb (ubuntu-20.04, ubuntu, 20.04)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (ubuntu-20.04, ubuntu, 20.04)
The operation was canceled.
install-deb (ubuntu-22.04, ubuntu, 22.04)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (ubuntu-22.04, ubuntu, 22.04)
The operation was canceled.
install-deb (ubuntu-24.04, ubuntu, 24.04)
The job was canceled because "ubuntu-23_10_ubuntu_23_10" failed.
install-deb (ubuntu-24.04, ubuntu, 24.04)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
dangerzone.deb Expired
631 MB