Network infrastructure permanently installed at the ULB.

Cable

  • cable plugged into core router <=> cable in the corner of the NOC next to the speaker
  • cable in corner of NOC next to speaker <=> ceiling over info-desk
  • ub5-wall-rack (top) <=> ub 5.230 (above ceiling tile in corner behind speaker)
  • ub5-wall-rack (top) <=> ub 5.132 (in cable guide (holding the lamps, just outside of the second door))
  • AW-technical room <=> video desk spot
  • AW-technical room <=> AW.1.120 (in ceiling cable-guide)
  • AW-technical room <=> AW.1.121 (in ceiling cable-guide)
  • AW-technical room <=> AW.1.125 (in ceiling cable-guide)
  • AW-technical room <=> AW.1.126 (in ceiling cable-guide)
  • AW-technical room <=> AP in corner left (in ceiling cable-guide)
  • AW-technical room <=> AP in corner right (in ceiling cable-guide)
  • UA2.220 - 2 ends (see picture below) - need jacks and a cross connect cable

Switches

  • AW building
  • In small technical room next to / under stairs
  • Key @resULB
  • H building
  • in room under stairs
  • key 46.pass @resULB
  • K building rack
    • router
    • core switch
    • J switch (powered off)
    • k building switch (powered off)
    • padlock code (ask Wouter)

Notes for temporary cabling

  • H building uses 4 rolls (those can go in the van to H building )
  • AW needs 1 roll (can go in the van to H building as well )

Pictures / images

[TODO (WK): Better pictures next year ]

AW Left

AW

UA2.220

UB4.136