-
Notifications
You must be signed in to change notification settings - Fork 23
ULB cabling
Warren Kumari edited this page Feb 7, 2020
·
2 revisions
- cable plugged into core router <=> cable in the corner of the NOC next to the speaker
- cable in corner of NOC next to speaker <=> ceiling over info-desk
- ub5-wall-rack (top) <=> ub 5.230 (above ceiling tile in corner behind speaker)
- ub5-wall-rack (top) <=> ub 5.132 (in cable guide (holding the lamps, just outside of the second door))
- AW-technical room <=> video desk spot
- AW-technical room <=> AW.1.120 (in ceiling cable-guide)
- AW-technical room <=> AW.1.121 (in ceiling cable-guide)
- AW-technical room <=> AW.1.125 (in ceiling cable-guide)
- AW-technical room <=> AW.1.126 (in ceiling cable-guide)
- AW-technical room <=> AP in corner left (in ceiling cable-guide)
- AW-technical room <=> AP in corner right (in ceiling cable-guide)
- UA2.220 - 2 ends (see picture below) - need jacks and a cross connect cable
- AW building
- In small technical room next to / under stairs
- Key @resULB
- H building
- in room under stairs
- key 46.pass @resULB
- K building rack
- router
- core switch
- J switch (powered off)
- k building switch (powered off)
- padlock code (ask Wouter)
- H building uses 4 rolls (those can go in the van to H building )
- AW needs 1 roll (can go in the van to H building as well )
[TODO (WK): Better pictures next year ]
AW Left
UA2.220
UB4.136
UB5 - Cabinet