fix: sync slow issue caused by unnecessary traversals #7409
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
integration-linux.yml
on: pull_request
Matrix: PR integration tests (linux)
Annotations
7 errors
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 3)
Process completed with exit code 2.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 1)
The job was canceled because "_3_5_4_0_4_0_1_21_0_1_0_4" failed.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 1)
The operation was canceled.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 2)
The job was canceled because "_3_5_4_0_4_0_1_21_0_1_0_4" failed.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 2)
The operation was canceled.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 0)
The job was canceled because "_3_5_4_0_4_0_1_21_0_1_0_4" failed.
|
PR integration tests (linux) (3.5.4, 0.4.0, 1.21.0, 1.0.0-beta.24, 1.30.1, 410.0.0, 1.8.0, 0)
The operation was canceled.
|