[Issue #3289] Content update #1334
ci-frontend-e2e.yml
on: pull_request
Matrix: Run E2E Tests
Create Merged Test Report
1m 26s
Annotations
5 errors and 1 warning
Run E2E Tests (1, 3)
Process completed with exit code 1.
|
Run E2E Tests (3, 3)
The job was canceled because "_1_3" failed.
|
Run E2E Tests (3, 3)
The operation was canceled.
|
Run E2E Tests (2, 3)
The job was canceled because "_1_3" failed.
|
Run E2E Tests (2, 3)
The operation was canceled.
|
Run E2E Tests (2, 3)
No files were found with the provided path: /home/runner/work/simpler-grants-gov/simpler-grants-gov/frontend/blob-report. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
blob-report-shard-1
|
8.14 MB |
|
blob-report-shard-3
|
15.2 MB |
|
merged-html-report
|
19.4 MB |
|