Skip to content

[Issue #3289] Content update #1334

[Issue #3289] Content update

[Issue #3289] Content update #1334

Triggered via pull request December 27, 2024 18:00
Status Failure
Total duration 13m 31s
Artifacts 3

ci-frontend-e2e.yml

on: pull_request
Matrix: Run E2E Tests
Create Merged Test Report
1m 26s
Create Merged Test Report
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
Run E2E Tests (1, 3)
Process completed with exit code 1.
Run E2E Tests (3, 3)
The job was canceled because "_1_3" failed.
Run E2E Tests (3, 3)
The operation was canceled.
Run E2E Tests (2, 3)
The job was canceled because "_1_3" failed.
Run E2E Tests (2, 3)
The operation was canceled.
Run E2E Tests (2, 3)
No files were found with the provided path: /home/runner/work/simpler-grants-gov/simpler-grants-gov/frontend/blob-report. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
blob-report-shard-1
8.14 MB
blob-report-shard-3
15.2 MB
merged-html-report
19.4 MB