Skip to content

Añadido nuevo servidor de tiles para viirs #18

Añadido nuevo servidor de tiles para viirs

Añadido nuevo servidor de tiles para viirs #18

Triggered via push September 24, 2024 11:55
Status Failure
Total duration 21s
Artifacts

django.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build (3.7)
Process completed with exit code 1.
build (3.8)
The job was canceled because "_3_7" failed.
build (3.8)
The operation was canceled.
build (3.9)
The job was canceled because "_3_7" failed.
build (3.9)
The operation was canceled.
build (3.7)
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/setup-python@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/