3.0.1.0
What's Changed
- Lower Nav Sat Payload required for 4-sat Nav Network contract and increase payload for 3-sat Comm Network contract by @NathanKell
- Put Comm Network contracts in the correct group in the All Contracts tab by @NathanKell
- Add an Early Avionics upgrade for comm and nav sat payload busses to decrease avionics wattage by @NathanKell
- Don't show the fake solar panel info for comm and nav sat payload busses by @NathanKell
- Remove tech gating from Reach Orbital Speed & Return Safely to Earth contract by @NathanKell
- Switch to just one space after a period by @NovemberOrWhatever in #2267
- Note that contract sat panels don't work in description by @NovemberOrWhatever in #2268
- So much for the Uncrewed Lunar Impactor meme by @NathanKell
Full Changelog: v3.0.0.2...3.0.1.0