chore(deps): update all non-major dependencies #3349
integrate.yaml
on: pull_request
Matrix: Coding Standards
Matrix: Dependency Analysis
Matrix: Static Code Analysis
Matrix: Tests
Annotations
10 errors and 1 warning
Tests (8.3, locked)
Process completed with exit code 4.
|
Tests (8.1, locked)
The job was canceled because "_8_3_locked" failed.
|
Tests (8.1, locked)
The operation was canceled.
|
Static Code Analysis (8.3, locked)
Process completed with exit code 4.
|
Tests (8.3, lowest)
The job was canceled because "_8_3_locked" failed.
|
Tests (8.2, locked)
The job was canceled because "_8_3_locked" failed.
|
Tests (8.2, lowest)
The job was canceled because "_8_3_locked" failed.
|
Tests (8.1, lowest)
The job was canceled because "_8_3_locked" failed.
|
Coding Standards (8.3, locked)
Process completed with exit code 2.
|
Dependency Analysis (8.3, locked)
Process completed with exit code 4.
|
Coding Standards (8.3, locked)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|