Skip to content

Measurement Tool (#3574) #6872

Measurement Tool (#3574)

Measurement Tool (#3574) #6872

Triggered via push October 22, 2024 14:12
Status Cancelled
Total duration 7m 38s
Artifacts

ios.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 4 warnings
ios_build
Canceling since a higher priority waiting request for 'ci-refs/heads/master-ios' exists
ios_build
The operation was canceled.
ios_build
Runner GitHub Actions 2 did not respond to a cancelation request with 00:05:00.
ios_build
Failed to save: Tar failed with error: The process '/usr/local/bin/gtar' failed with exit code 1
ios_build
gnupg 2.4.5_1 is already installed and up-to-date. To reinstall 2.4.5_1, run: brew reinstall gnupg
ios_build
openssl@1.1 1.1.1w is already installed and up-to-date. To reinstall 1.1.1w, run: brew reinstall openssl@1.1