ENH: GHA: cancel in progress builds for pull requests #348
Triggered via pull request
December 11, 2024 07:16
Status
Cancelled
Total duration
15m 31s
Artifacts
–
build-test-package-python-cuda.yml
on: pull_request
Matrix: build-linux-cuda-python-packages
Matrix: build-windows-cuda-python-packages
publish-python-packages-to-pypi
0s
Annotations
7 errors
build-linux-cuda-python-packages (8, _2_28-x64, 121)
Canceling since a higher priority waiting request for 'Package RTK with CUDA@concurrency' exists
|
build-windows-cuda-python-packages (8, 121)
Canceling since a higher priority waiting request for 'Package RTK with CUDA@concurrency' exists
|
build-windows-cuda-python-packages (8, 116)
Canceling since a higher priority waiting request for 'Package RTK with CUDA@concurrency' exists
|
build-windows-cuda-python-packages (8, 116)
The self-hosted runner: morille lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
build-linux-cuda-python-packages (8, _2_28-x64, 116)
Canceling since a higher priority waiting request for 'Package RTK with CUDA@concurrency' exists
|
build-linux-cuda-python-packages (8, _2_28-x64, 116)
The operation was canceled.
|
build-linux-cuda-python-packages (8, _2_28-x64, 116)
could not lock config file /home/srit/Downloads/actions-runner/_work/_temp/f4f5a7ce-ad73-4e19-9a76-d5ffa81f316d/.gitconfig: No such file or directory
|