Skip to content

Add integration test #145

Add integration test

Add integration test #145

Triggered via pull request September 16, 2024 08:44
Status Failure
Total duration 2m 17s
Artifacts

rustls-rustcrypto.yml

on: pull_request
Matrix: cross
Matrix: no_std
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

18 errors
no_std (stable, thumbv7em-none-eabi)
Process completed with exit code 101.
no_std (stable, armv7a-none-eabi)
The job was canceled because "stable_thumbv7em-none-eab" failed.
no_std (stable, armv7a-none-eabi)
Process completed with exit code 101.
no_std (1.75.0, thumbv7em-none-eabi)
The job was canceled because "stable_thumbv7em-none-eab" failed.
no_std (1.75.0, thumbv7em-none-eabi)
The operation was canceled.
no_std (1.75.0, armv7a-none-eabi)
The job was canceled because "stable_thumbv7em-none-eab" failed.
no_std (1.75.0, armv7a-none-eabi)
The operation was canceled.
no_std (stable, wasm32-unknown-unknown)
The job was canceled because "stable_thumbv7em-none-eab" failed.
no_std (stable, wasm32-unknown-unknown)
The operation was canceled.
no_std (1.75.0, wasm32-unknown-unknown)
The job was canceled because "stable_thumbv7em-none-eab" failed.
no_std (1.75.0, wasm32-unknown-unknown)
The operation was canceled.
test (stable)
Process completed with exit code 100.
coverage
Process completed with exit code 1.
test (1.75.0)
The job was canceled because "stable" failed.
test (1.75.0)
The operation was canceled.
cross (powerpc-unknown-linux-gnu, stable)
Process completed with exit code 101.
cross (powerpc-unknown-linux-gnu, 1.75.0)
The job was canceled because "powerpc-unknown-linux-g_2" failed.
cross (powerpc-unknown-linux-gnu, 1.75.0)
The operation was canceled.