- The following questions should be answered once an experiment or research project is in the process of or has been proposed.
- Add this template to a wiki page on the project repository as per New Activity Organization
- Project Objectives -
- Project Description -
- Project Protocol -
- Field Design -
- Field Diagrams -
- Projected Start Date-
- Projected End Date-
- Project Manager(s)-
- Projected Planting Date-
- Crop(s)-
- Irrigation -
- Applications -
- Planting methods -
- Data Collection & Sampling -
- Project Maintenance -
- Equipment needed -
- Field crew assistance -
- Preferred block-
- Section-
- Area/Acres requested-
- Greenhouse -
- Complete TREC Land Request
- Complete TREC Greenhouse Request
- Request faculty sponsor to complete UFarm request.
- Cultivation (mowing, moldboard plow, disc and level the field, form raised beds, drilling holes, etc.) -
- Row Length -
- In-Row Spacing
- Between-Row Spacing -
- Field Buffers -
- Seeding? (Direct, Broadcast, Incorporated, Drill, Earthway, etc.) -
- Transplants? -
- Support Structure (Rebar, String, etc.) -
- Plastic Mulch? -
- Full image of field layout, design, and plot arrangement -
- Date to complete land preparation -
- Complete TREC field preparation request
- Drip Tape? (drip placement, emitter spacing, flow-rate GPM/100 ft., etc.) -
- Solid set? (overhead irrigation, microsprinkler) -
- Irrigation Timing (frequency and trigger) -
- Irrigation Amount (per application) -
- Complete TREC fieldwork request for irrigation.
- Review Chpt 3. (pg. 17-29) of the Vegetable Production Handbook Principles and practices of Irrigation Management
- Label Name -
- Analysis rates (NPK, etc.) -
- Application rate per acre -
- Application method (banded on top of the bed, soil incorporation, etc.) -
- Application timing and frequency -
- Lab or field personnel
- Label Name -
- Active ingredient(s) and concentration -
- Application rate per acre -
- Application method (pre-plant broadcast incorporated, shank or drip applied, etc.) -
- Application timing and frequency -
- Lab or field personnel
- Worker Protection Standard Training
- Review "Training Workers and Handlers under the 2016 Revision Requirements" by Frederick M. Fishel.
- Found in the TREC network
Unit drive
>TREC Pesticide Use information
>WPS information
- Pesticide request form
- Research treatment application -
- Weeding -
- Scouting -
- Sampling -
- Harvesting and Sampling -
- Project removal-
- Equipment Request
- Complete TREC field work request well ahead of maintenance events.
- Database
- Data type -
- Data storage -
- Metadata -
- Data collection
- Protocols -
- Timing -
- Logistics
- Sample processing and analysis
- Protocols -
- Timing -
- Logistics -
- What important decisions are next to be made or remain a challenge?
- What could possibly go wrong?