build(deps): bump the prod group across 1 directory with 18 updates #2006
ci-build-crates.yml
on: pull_request
Generate crates matrix
19s
Matrix: build
Open or update issues for building crates individually failures
0s
Annotations
10 errors
|
Build zebra-utils crate
Process completed with exit code 101.
|
Build zebra-script crate
The job was canceled because "zebra-utils" failed.
|
Build zebra-script crate
The operation was canceled.
|
Build zebrad crate
The job was canceled because "zebra-utils" failed.
|
Build zebrad crate:
zebra-chain/src/primitives/zcash_history.rs#L288
mismatched types
|
Build zebrad crate
The operation was canceled.
|
Build zebra-state crate
The job was canceled because "zebra-utils" failed.
|
|
Build zebra-state crate
The operation was canceled.
|