Skip to content

Pull requests: adobe/spectrum-css

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

fix(textfield): update border and background color
#3505 opened Jan 16, 2025 by TarunAdobe Loading…
10 tasks
build: postcss plugin updates and fixes build Issues associated with the build process; often a refactor s1 size-3 M ~18-30hrs; moderate effort or complexity, several work days needed.
#3502 opened Jan 15, 2025 by castastrophe Draft
9 tasks
chore(tokens): use spectrum-tokens@13.0.0-beta.56 ready-for-review S2 Spectrum 2 size-1 XS ~1-6hrs; nearly trivial, a few hours, could do more than one in a single day. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3497 opened Jan 14, 2025 by cdransf Loading…
2 of 6 tasks
docs(progressbar, tooltip): reimplement default args in template documentation Because documentation is important and shouldn't be broken size-1 XS ~1-6hrs; nearly trivial, a few hours, could do more than one in a single day. storybook
#3485 opened Jan 8, 2025 by marissahuysentruyt Loading…
2 of 10 tasks
build: integrate yarn constraints s1
#3472 opened Jan 3, 2025 by castastrophe Draft
11 tasks
build: migrate from nx to workspaces s1 S2 Spectrum 2
#3455 opened Dec 19, 2024 by castastrophe Draft
9 tasks
chore: adds transparent-tokens.js do not merge A flag for a branch indicating it should not be merged. wip This is a work in progress, don't judge.
#3452 opened Dec 16, 2024 by marissahuysentruyt Draft
9 tasks
Dropzone S2 migration ready-for-review S2 Spectrum 2
#3429 opened Dec 4, 2024 by aramos-adobe Loading…
2 of 9 tasks
feat(colorslider): S2 migration ready-for-review size-2 S ~6-18hrs; not hard or time consuming, one or two work days to complete. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3424 opened Dec 2, 2024 by cdransf Loading…
2 of 9 tasks
feat(coachmark): S2 migration blocked See description and comments for what is blocking this issue ready-for-review size-3 M ~18-30hrs; moderate effort or complexity, several work days needed. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3412 opened Nov 21, 2024 by cdransf Loading…
3 of 9 tasks
feat(breadcrumb)!: spectrum 2 migration ready-for-review S2 Spectrum 2 size-3 M ~18-30hrs; moderate effort or complexity, several work days needed.
#3395 opened Nov 13, 2024 by jawinn Loading…
7 of 13 tasks
feat(colorwheel): S2 migration ready-for-review size-2 S ~6-18hrs; not hard or time consuming, one or two work days to complete. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3390 opened Nov 12, 2024 by cdransf Loading…
2 of 9 tasks
Prototype for testing CJK typography do not merge A flag for a branch indicating it should not be merged. skip_vrt Add to a PR to skip running VRT (but still pass the action) wip This is a work in progress, don't judge.
#3378 opened Nov 8, 2024 by 5t3ph Draft
Spike: i18n coverage/test cases in Storybook do not merge A flag for a branch indicating it should not be merged. i18n Things like `[dir]` that matter for i18n ready-for-review research Flag for research needed or in progress skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3368 opened Nov 5, 2024 by rise-erpelding Draft
feat(popover): migrate s2 popover ready-for-review S2 Spectrum 2 skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3365 opened Nov 4, 2024 by marissahuysentruyt Loading…
5 of 31 tasks
chore(stylelint): addresses remaining stylelint violations blocked See description and comments for what is blocking this issue ready-for-review size-3 M ~18-30hrs; moderate effort or complexity, several work days needed. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3359 opened Oct 31, 2024 by cdransf Loading…
2 of 9 tasks
fix(progressbar,meter): default width responds to platform do not merge A flag for a branch indicating it should not be merged. skip_vrt Add to a PR to skip running VRT (but still pass the action) wip This is a work in progress, don't judge.
#3352 opened Oct 30, 2024 by marissahuysentruyt Draft
9 tasks
feat(dialog): s2 takeover dialog migration ready-for-review S2 Spectrum 2 size-2 S ~6-18hrs; not hard or time consuming, one or two work days to complete. skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3347 opened Oct 29, 2024 by marissahuysentruyt Loading…
5 of 40 tasks
Prototype for testing Adobe Clean VF do not merge A flag for a branch indicating it should not be merged. skip_vrt Add to a PR to skip running VRT (but still pass the action) wip This is a work in progress, don't judge.
#3323 opened Oct 24, 2024 by 5t3ph Draft
fix(treeview): update Treeview margin and focus border to use Spectrum tokens skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3257 opened Oct 15, 2024 by jonnykry Loading…
6 of 9 tasks
ci: use pull_request closed event for selective vrt runs skip_vrt Add to a PR to skip running VRT (but still pass the action)
#3254 opened Oct 15, 2024 by pfulton Loading…
9 tasks
ProTip! Filter pull requests by the default branch with base:main.