Skip to content

Sync with upstream

Sync with upstream #5

Triggered via push November 15, 2023 15:24
Status Failure
Total duration 54s
Artifacts

langserve_ci.yml

on: push
Matrix: lint / build
Matrix: pydantic-compatibility / build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

17 errors
lint / build (3.11)
Process completed with exit code 2.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.8
Process completed with exit code 2.
Python 3.10 tests
Process completed with exit code 2.
Python 3.9 tests
The job was canceled because "_3_10" failed.
Python 3.9 tests
Process completed with exit code 2.
Python 3.11 tests
The job was canceled because "_3_10" failed.
Python 3.11 tests
Process completed with exit code 2.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.10
The job was canceled because "_3_8" failed.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.10
The operation was canceled.
Python 3.8 tests
The job was canceled because "_3_10" failed.
Python 3.8 tests
The operation was canceled.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.9
The job was canceled because "_3_8" failed.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.9
The operation was canceled.
lint / build (3.8)
The job was canceled because "_3_11" failed.
lint / build (3.8)
The operation was canceled.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.11
The job was canceled because "_3_8" failed.
pydantic-compatibility / Pydantic v1/v2 compatibility - Python 3.11
The operation was canceled.