maybe force check and format github for the lulz? #486
main.yml
on: push
Test on MacOS
1m 54s
Test on Windows
2m 3s
Matrix: linux
Annotations
8 errors
Test on Ubuntu (Elixir 1.15.7, OTP 24.3)
Process completed with exit code 1.
|
Test on Ubuntu (Elixir 1.8.2, OTP 20.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.15.7, OTP 25.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.15.7, OTP 25.3)
Process completed with exit code 1.
|
Test on Ubuntu (Elixir 1.9.4, OTP 21.3)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.9.4, OTP 21.3)
The operation was canceled.
|
Test on Ubuntu (Elixir 1.15.7, OTP 26.1)
The job was canceled because "_1_15_7_24_3" failed.
|
Test on Ubuntu (Elixir 1.15.7, OTP 26.1)
The operation was canceled.
|