Skip to content

📝 Update implementation spec with Phase 4 status and LLM-friendl…#7

Merged
bigr merged 1 commit intomainfrom
klinger-respec
Oct 23, 2025
Merged

📝 Update implementation spec with Phase 4 status and LLM-friendl…#7
bigr merged 1 commit intomainfrom
klinger-respec

Conversation

@bigr
Copy link
Owner

@bigr bigr commented Oct 22, 2025

…y roadmap

Project Analysis Summary:

  • ✅ Phases 1-4 complete (65% overall, 85% MVP)
  • Core PWA management fully operational
  • Comprehensive test suite (226 tests, ~75-80% coverage)
  • CI/CD pipeline passing all checks

Updated Documentation:

  1. Implementation-specification.md:
    • Added status summary at top
    • Marked Phase 4 (URL Handler System) as complete
    • Revised Phase 5 (Validation & Audit) with detailed subtasks
    • Revised Phase 6 (Testing) to show what's done vs pending
    • Revised Phase 7 (Release Prep) with actionable items
    • Added comprehensive LLM Implementation Guide section

Key Changes for LLM Automation:

  • Detailed function signatures for each command
  • Step-by-step implementation instructions
  • Test structure examples and acceptance criteria
  • Mock strategy for E2E tests
  • Clear separation of system calls vs file operations
  • Reference to existing code patterns

Remaining Work (15-20 hours across 3-5 sessions):

  • Session 1: audit + sync commands (HIGH PRIORITY)
  • Session 2: doctor + config commands
  • Session 3: edit command + E2E test suite
  • Session 4: Documentation (USAGE, TROUBLESHOOTING)
  • Session 5: Shell completion + release prep

Estimated MVP Completion: 85% → 100% in next 2-3 sessions
Estimated Full Release: 3-5 sessions

All specifications now include:

  • Exact file paths to create
  • Complete function signatures
  • Implementation steps
  • Integration points with existing code
  • Test requirements with >90% coverage targets
  • CLI wiring instructions
  • No manual intervention required

…dmap

Project Analysis Summary:
- ✅ Phases 1-4 complete (65% overall, 85% MVP)
- Core PWA management fully operational
- Comprehensive test suite (226 tests, ~75-80% coverage)
- CI/CD pipeline passing all checks

Updated Documentation:
1. Implementation-specification.md:
   - Added status summary at top
   - Marked Phase 4 (URL Handler System) as complete
   - Revised Phase 5 (Validation & Audit) with detailed subtasks
   - Revised Phase 6 (Testing) to show what's done vs pending
   - Revised Phase 7 (Release Prep) with actionable items
   - Added comprehensive LLM Implementation Guide section

Key Changes for LLM Automation:
- Detailed function signatures for each command
- Step-by-step implementation instructions
- Test structure examples and acceptance criteria
- Mock strategy for E2E tests
- Clear separation of system calls vs file operations
- Reference to existing code patterns

Remaining Work (15-20 hours across 3-5 sessions):
- Session 1: audit + sync commands (HIGH PRIORITY)
- Session 2: doctor + config commands
- Session 3: edit command + E2E test suite
- Session 4: Documentation (USAGE, TROUBLESHOOTING)
- Session 5: Shell completion + release prep

Estimated MVP Completion: 85% → 100% in next 2-3 sessions
Estimated Full Release: 3-5 sessions

All specifications now include:
- Exact file paths to create
- Complete function signatures
- Implementation steps
- Integration points with existing code
- Test requirements with >90% coverage targets
- CLI wiring instructions
- No manual intervention required
@bigr bigr merged commit 2ec37ec into main Oct 23, 2025
5 checks passed
bigr added a commit that referenced this pull request Oct 23, 2025
- Add platform-specific locking: fcntl (Unix) and msvcrt (Windows)
- Make add_app() atomic with single-lock read-check-write operation
- Prevent race condition where two simultaneous adds could corrupt registry
- Add type annotations to satisfy mypy strict type checking
- Resolves user testing issues #6 and #7 (registry concurrency and platform locking)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant