Skip to content

chore: update locks (#28) #66

chore: update locks (#28)

chore: update locks (#28) #66

Triggered via push October 26, 2023 16:26
Status Cancelled
Total duration 4m 20s
Artifacts

ci.yaml

on: push
test  /  matrix-prep-os
4s
test / matrix-prep-os
test  /  matrix-prep-bazelversion
5s
test / matrix-prep-bazelversion
Matrix: test / test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test / test (windows-latest, 6.3.0, e2e/smoke, false)
Process completed with exit code 1.
test / test (windows-latest, 6.3.0, e2e/smoke, true)
Process completed with exit code 1.
test / test (windows-latest, 6.3.0, ., false)
Process completed with exit code 1.
test / test (windows-latest, 6.3.0, ., true)
Process completed with exit code 1.
test / test (macos-latest, 6.3.0, ., true)
Process completed with exit code 3.
test / test (macos-latest, 6.3.0, ., false)
Canceling since a higher priority waiting request for 'CI-refs/heads/main' exists
test / test (macos-latest, 6.3.0, ., false)
The operation was canceled.