Skip to content

Fix typo

Fix typo #406

Triggered via push December 24, 2024 12:20
Status Failure
Total duration 9m 53s
Artifacts

osx.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 10 warnings
build (3.11)
Process completed with exit code 8.
build (3.9)
The job was canceled because "_3_11" failed.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_11" failed.
build (3.10)
The operation was canceled.
build (3.13)
The job was canceled because "_3_11" failed.
build (3.13)
The operation was canceled.
build (3.12)
The job was canceled because "_3_11" failed.
build (3.12)
The operation was canceled.
build (3.11)
gmp 6.3.0 is already installed and up-to-date. To reinstall 6.3.0, run: brew reinstall gmp
build (3.11)
pkgconf 2.3.0_1 is already installed and up-to-date. To reinstall 2.3.0_1, run: brew reinstall pkgconf
build (3.9)
gmp 6.3.0 is already installed and up-to-date. To reinstall 6.3.0, run: brew reinstall gmp
build (3.9)
pkgconf 2.3.0_1 is already installed and up-to-date. To reinstall 2.3.0_1, run: brew reinstall pkgconf
build (3.10)
gmp 6.3.0 is already installed and up-to-date. To reinstall 6.3.0, run: brew reinstall gmp
build (3.10)
pkgconf 2.3.0_1 is already installed and up-to-date. To reinstall 2.3.0_1, run: brew reinstall pkgconf
build (3.13)
gmp 6.3.0 is already installed and up-to-date. To reinstall 6.3.0, run: brew reinstall gmp
build (3.13)
pkgconf 2.3.0_1 is already installed and up-to-date. To reinstall 2.3.0_1, run: brew reinstall pkgconf
build (3.12)
gmp 6.3.0 is already installed and up-to-date. To reinstall 6.3.0, run: brew reinstall gmp
build (3.12)
pkgconf 2.3.0_1 is already installed and up-to-date. To reinstall 2.3.0_1, run: brew reinstall pkgconf