Bump go.opentelemetry.io/otel/sdk from 1.20.0 to 1.21.0 in /exporter #833
build-and-test.yml
on: pull_request
setup-environment
29s
govulncheck
1m 16s
Matrix: unittest-matrix
Matrix: cross-build-collector
unittest
0s
Annotations
17 errors
checks
Process completed with exit code 2.
|
cross-build-collector (linux, 386)
Process completed with exit code 2.
|
cross-build-collector (darwin, amd64)
Process completed with exit code 2.
|
cross-build-collector (darwin, arm64)
Process completed with exit code 2.
|
cross-build-collector (linux, arm, 7)
Process completed with exit code 2.
|
cross-build-collector (linux, amd64)
Process completed with exit code 2.
|
cross-build-collector (linux, arm64)
Process completed with exit code 2.
|
cross-build-collector (linux, ppc64le)
Process completed with exit code 2.
|
cross-build-collector (linux, s390x)
Process completed with exit code 2.
|
cross-build-collector (windows, 386)
Process completed with exit code 2.
|
unittest-matrix (~1.20.11)
Process completed with exit code 2.
|
cross-build-collector (windows, amd64)
Process completed with exit code 2.
|
lint
Process completed with exit code 2.
|
unittest-matrix (~1.21.4)
The job was canceled because "_1_20_11" failed.
|
unittest-matrix (~1.21.4)
The operation was canceled.
|
test-coverage
Process completed with exit code 2.
|
unittest
Process completed with exit code 1.
|