You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This is separate from any other workflow-related improvements needed throughout the project.
🛠 Since this implementation is a significant amount of work, we will proceed as follows:
Create a design-system-implementation branch and open a PR against main that will close ENH - Design system implementation #288 (this issue). This should be marked as draft and visibly signalled as WIP.
Follow an iterative development approach by opening multiple small, well-scoped, easy-to-review PRs against the design-system-implementation branch
Once completed and validated, then we can merge design-system-implementation into main
The text was updated successfully, but these errors were encountered:
Now that the design system has been completed, we are ready to move on to an implementation phase (see #265).
There are several tasks needed for this.
Design
Development
This is separate from any other workflow-related improvements needed throughout the project.
🛠 Since this implementation is a significant amount of work, we will proceed as follows:
design-system-implementation
branch and open a PR againstmain
that will close ENH - Design system implementation #288 (this issue). This should be marked as draft and visibly signalled as WIP.design-system-implementation
branchdesign-system-implementation
intomain
The text was updated successfully, but these errors were encountered: