Skip to content

fixed DoQ

fixed DoQ #50

Triggered via push December 16, 2024 18:25
Status Failure
Total duration 38m 53s
Artifacts 2

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 2 warnings
build (macos-latest, stable)
Process completed with exit code 101.
build (windows-latest, stable)
The job was canceled because "macos-latest_stable" failed.
build (windows-latest, stable)
The operation was canceled.
build (macos-13, stable)
The job was canceled because "macos-latest_stable" failed.
build (macos-13, stable)
The operation was canceled.
build (ubuntu-20.04, stable)
The job was canceled because "macos-latest_stable" failed.
build (ubuntu-20.04, stable)
The operation was canceled.
build_x86_musl
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build_arm64_musl
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
dqy-arm64-unknown-linux-musl
3.93 MB
dqy-x86_64-unknown-linux-musl
4.07 MB