Skip to content

feat(wallet): updated branding #3090

feat(wallet): updated branding

feat(wallet): updated branding #3090

Triggered via pull request February 10, 2025 23:45
Status Failure
Total duration 19m 22s
Artifacts 4

tests.yaml

on: pull_request
Matrix: Build canister
Matrix: Download Canister
test-rust:required
2m 0s
test-rust:required
test-node:required
1m 47s
test-node:required
deployment-test:required
9m 4s
deployment-test:required
deployment-test-replica:required
8m 52s
deployment-test-replica:required
prod-deployment-test:required
19m 13s
prod-deployment-test:required
merge-artifacts
0s
merge-artifacts
integration-tests:required
0s
integration-tests:required
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 1 warning
Build canister (upgrader, upgrader)
Process completed with exit code 101.
Build canister (station, station)
The job was canceled because "upgrader_upgrader" failed.
Build canister (station, station)
The operation was canceled.
Build canister (control-panel, control_panel)
The job was canceled because "upgrader_upgrader" failed.
Build canister (control-panel, control_panel)
The operation was canceled.
deployment-test-replica:required
Process completed with exit code 1.
deployment-test:required
Process completed with exit code 1.
prod-deployment-test:required
Process completed with exit code 1.
deployment-test-replica:required
The `python-version` input is not set. The version of Python currently in `PATH` will be used.

Artifacts

Produced during runtime
Name Size
integration-tests-cmc
458 KB
integration-tests-icp_index
318 KB
integration-tests-icp_ledger
742 KB
integration-tests-icrc1_ledger
593 KB