Skip to content

chore(deps): bump github.com/onsi/ginkgo/v2 from 2.22.0 to 2.22.1 #1618

chore(deps): bump github.com/onsi/ginkgo/v2 from 2.22.0 to 2.22.1

chore(deps): bump github.com/onsi/ginkgo/v2 from 2.22.0 to 2.22.1 #1618

Triggered via pull request December 23, 2024 15:43
Status Failure
Total duration 23m 42s
Artifacts 9

compatibility-e2e-v2.yml

on: pull_request
Matrix: compatibility_e2e_tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 4 warnings
compatibility_e2e_tests (seed-client)
Process completed with exit code 1.
compatibility_e2e_tests (scheduler)
The job was canceled because "seed-client" failed.
compatibility_e2e_tests (scheduler)
The operation was canceled.
compatibility_e2e_tests (client)
The job was canceled because "seed-client" failed.
compatibility_e2e_tests (client)
The operation was canceled.
compatibility_e2e_tests (manager)
The job was canceled because "seed-client" failed.
compatibility_e2e_tests (manager)
The operation was canceled.
compatibility_e2e_tests (seed-client)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
compatibility_e2e_tests (scheduler)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
compatibility_e2e_tests (client)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.
compatibility_e2e_tests (manager)
No files were found with the provided path: /tmp/artifact/**. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
dragonflyoss~dragonfly~69KUBJ.dockerbuild
49.9 KB
dragonflyoss~dragonfly~9NVL0F.dockerbuild
42.6 KB
dragonflyoss~dragonfly~G3KTZA.dockerbuild
49.6 KB
dragonflyoss~dragonfly~PD3AUW.dockerbuild
49.8 KB
dragonflyoss~dragonfly~RP6EM0.dockerbuild
42.3 KB
dragonflyoss~dragonfly~T6WEVT.dockerbuild
43.3 KB
dragonflyoss~dragonfly~TIFV3P.dockerbuild
43.4 KB
dragonflyoss~dragonfly~YQSRUY.dockerbuild
49.7 KB
seed-client-e2e-tests-logs
1.17 MB